How Modoc County compares · From the counties’ own budgets, line by line

Natural resources and environment: Modoc County beside counties of similar size in California

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Modoc County: $641,713, 2nd highest of 9. The middle of the group is $0; the middle half runs from $0 to $0 (8 counties with figures, 7 of them at $0).

#CountyResidentsAmountPer residentWhere it comes from
1Colusa County, CA22,074$1.1 million$50.57/res.Flood Control - Soil and Water Conservation $1.1 million · in Public Protection · the state’s standard line “Flood Control - Soil and Water Conservation” (2025, actual spending)
2Modoc County, CA8,491$641,713$75.58/res.Flood Control - Soil and Water Conservation $641,713 · in Public Protection · the state’s standard line “Flood Control - Soil and Water Conservation” (2025, actual spending)
3Mono County, CA12,991$0$0.00/res.no line matched in this budget (2025, actual spending)
4Trinity County, CA15,642$0$0.00/res.no line matched in this budget (2025, actual spending)
5Mariposa County, CA17,048$0$0.00/res.no line matched in this budget (2025, actual spending)
6Inyo County, CA18,485$0$0.00/res.no line matched in this budget (2025, actual spending)
7Plumas County, CA18,834$0$0.00/res.no line matched in this budget (2025, actual spending)
8Sierra County, CA3,113$0$0.00/res.no line matched in this budget (2025, actual spending)
9Del Norte County, CA27,009$0$0.00/res.no line matched in this budget (2025, actual spending)

Who’s in the group: Counties in the same state with between half and double its population (2024 Census estimate). If fewer than five fit, the eight closest in population. Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.