How Orange County compares · From the counties’ own budgets, line by line

Utilities (water, sewer, power, airport, port, transit): Orange County beside counties of similar size across the nation

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Orange County: $38.5 million, 4th highest of 7. The middle of the group is $129.7 million; the middle half runs from $0 to $1.42 billion (6 counties with figures, 3 of them at $0).

#CountyResidentsAmountPer residentWhere it comes from
1King County, WA2,340,211$1.87 billion$800/res.Transit $1.52 billion · name contains “transit”
Wastewater treatment $251.3 million · name contains “wastewater”
Water and land resources shared services $67.9 million · name contains “water”
Airport $36.7 million · name contains “airport” (2026, two-year budget, halved)
2Miami-Dade County, FL2,838,461$1.81 billion$639/res.Water and Sewer $860.9 million · in Neighborhood and Infrastructure · name contains “water”
Aviation $774.8 million · in Economic Development · name contains “aviation”
Seaport $177.0 million · in Economic Development · name contains “seaport” (2026)
3Clark County, NV2,398,871$259.4 million$108/res.Utility Enterprises $259.4 million · name contains “utility” (2027)
4Orange County, CA3,170,435$38.5 million$12.16/res.Utilities $38.5 million · in Infrastructure and Environmental Resources · name contains “utilities” (2027)
5San Diego County, CA3,298,799$0$0.00/res.no line matched in this budget (2027)
6Dallas County, TX2,656,028$0$0.00/res.no line matched in this budget (2027)
7Riverside County, CA2,529,933$0$0.00/res.no line matched in this budget (2027)

Dead ends — 2 counties in this group with no figure yet (their own budgets haven’t been read): Kings, NY, Queens, NY.

Who’s in the group: Counties anywhere in the U.S. within 25% of its population (2024 Census estimate), either way. If fewer than five fit, the eight closest in population. Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.