Dougherty County: $3.4 million, 105th highest of 137. The middle of the group is $9.8 million; the middle half runs from $3.8 million to $15.0 million (136 counties with figures, 22 of them at $0).
| # | County | Residents | Amount | Per resident | Where it comes from |
|---|---|---|---|---|---|
| 1 | Sullivan County, NY | 80,450 | $40.4 million | $502/res. | Public Works Administration $799,672 · in General Government · name contains “public works” Other Transportation $13.6 million · in Transportation · name contains “transportation” Maintenance of Roads $14.7 million · in Transportation · name contains “roads” Machinery $5.4 million · in Transportation · the state’s standard line “Machinery” Snow Removal $2.3 million · in Transportation · the state’s standard line “Snow Removal” Transportation, Other $2.2 million · in Transportation · name contains “transportation” Engineering $1.4 million · in Transportation · name contains “engineering” (2024, actual spending) |
| 2 | Calvert County, MD | 94,913 | $38.3 million | $403/res. | Transportation $38.3 million · in Public Works · the state’s standard line “Transportation” (2024, actual spending, county government, including transfers to school and other boards only) |
| 3 | Walton County, FL | 89,666 | $38.1 million | $425/res. | Road and Street Facilities $38.1 million · in Transportation · the state’s standard line “Road and Street Facilities” (2025, actual spending, governmental and business funds, including transfers only) |
| 4 | Blue Earth County, MN | 70,700 | $35.4 million | $500/res. | Administration $407,228 · in Streets and Highways · the state’s standard line “Administration” Maintenance $32.9 million · in Streets and Highways · the state’s standard line “Maintenance” Construction $2.1 million · in Streets and Highways · the state’s standard line “Construction” (2024, actual spending, governmental funds, not utilities only) |
| 5 | Steuben County, NY | 92,015 | $30.8 million | $334/res. | Maintenance of Roads $13.9 million · in Transportation · name contains “roads” Maintenance of Bridges $5.6 million · in Transportation · name contains “bridges” Machinery $6.9 million · in Transportation · the state’s standard line “Machinery” Snow Removal $3.1 million · in Transportation · the state’s standard line “Snow Removal” Highway and Street Administration $934,563 · in Transportation · name contains “highway” Engineering $381,728 · in Transportation · name contains “engineering” (2024, actual spending) |
| 6 | Grand Traverse County, MI | 96,625 | $30.7 million | $317/res. | Public Works (Non-Act 51) $9.1 million · in Public Works · the state’s standard line “Public Works (Non-Act 51)” Road Commission/Street Dept. (Act 51) $21.5 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending) |
| 7 | Kosciusko County, IN | 80,669 | $30.4 million | $377/res. | Highway $8.3 million · in Roads and bridges · name contains “highway” Bridge #139 $5.4 million · in Roads and bridges · name contains “bridge” Bridge #9 $4.2 million · in Roads and bridges · name contains “bridge” Highway Bridge #123 $2.5 million · in Roads and bridges · name contains “highway” Bridge #227 $1.9 million · in Roads and bridges · name contains “bridge” Bridge #30 $1.9 million · in Roads and bridges · name contains “bridge” Cumulative Bridge $1.5 million · in Roads and bridges · name contains “bridge” Local Road & Street $1.5 million · in Roads and bridges · name contains “road” Bridge#161 $1.4 million · in Roads and bridges · name contains “bridge” Local Trax Rail-1300N ROAD $1.1 million · in Roads and bridges · name contains “road” Local Trax Rail - 1300 N BRIDGE $435,560 · in Roads and bridges · name contains “bridge” Bridge Inspection 2022-2025 $248,679 · in Roads and bridges · name contains “bridge” (2026, all county funds, as adopted (before state review) only) |
| 8 | Garland County, AR | 99,902 | $29.6 million | $296/res. | County Road Fund $13.6 million · name contains “road” County Road & Bridge Improvement $16.0 million · name contains “road” (2026) |
| 9 | Columbia County, FL | 73,977 | $29.2 million | $395/res. | Road and Street Facilities $29.2 million · in Transportation · the state’s standard line “Road and Street Facilities” (2024, actual spending, governmental and business funds, including transfers only) |
| 10 | Crow Wing County, MN | 68,642 | $28.9 million | $422/res. | Administration $656,055 · in Streets and Highways · the state’s standard line “Administration” Maintenance $8.9 million · in Streets and Highways · the state’s standard line “Maintenance” Construction $19.4 million · in Streets and Highways · the state’s standard line “Construction” (2024, actual spending, governmental funds, not utilities only) |
| 11 | Lewis County, WA | 87,049 | $28.4 million | $326/res. | Engineering $224,758 · in Transportation · the state’s standard line “Engineering” Roadway $5.3 million · in Transportation · the state’s standard line “Roadway” Drainage $5.1 million · in Transportation · the state’s standard line “Drainage” Structures $2.4 million · in Transportation · the state’s standard line “Structures” Street Lighting $23,080 · in Transportation · the state’s standard line “Street Lighting” Traffic Control Devices $1.1 million · in Transportation · the state’s standard line “Traffic Control Devices” Snow and Ice Control $367,199 · in Transportation · the state’s standard line “Snow and Ice Control” Street Cleaning $32,845 · in Transportation · the state’s standard line “Street Cleaning” Other Traffic and Pedestrian Services $219 · in Transportation · the state’s standard line “Other Traffic and Pedestrian Services” Roadside $1.4 million · in Transportation · the state’s standard line “Roadside” Ancillary Operations $839,174 · in Transportation · the state’s standard line “Ancillary Operations” Maintenance Administration and Overhead $6.8 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead” Management $2.1 million · in Transportation · the state’s standard line “Management” Engineering $1.5 million · in Transportation · the state’s standard line “Engineering” Planning $1.2 million · in Transportation · the state’s standard line “Planning” Operations Administration and Overhead $119,487 · in Transportation · the state’s standard line “Operations Administration and Overhead” (2025, actual spending) |
| 12 | Clinton County, MI | 80,050 | $25.3 million | $316/res. | Public Works (Non-Act 51) $1.9 million · in Public Works · the state’s standard line “Public Works (Non-Act 51)” Road Commission/Street Dept. (Act 51) $23.4 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending) |
| 13 | Bay County, MI | 102,651 | $25.2 million | $246/res. | Public Works (Non-Act 51) $771,063 · in Public Works · the state’s standard line “Public Works (Non-Act 51)” Road Commission/Street Dept. (Act 51) $24.4 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending) |
| 14 | Mendocino County, CA | 89,175 | $24.5 million | $275/res. | Roads $24.2 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Roads” Other Public Ways and Facilities $339,143 · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Other Public Ways and Facilities” (2025, actual spending) |
| 15 | Monroe County, FL | 80,908 | $23.3 million | $288/res. | Road and Street Facilities $19.2 million · in Transportation · the state’s standard line “Road and Street Facilities” Other Transportation Systems / Services $4.1 million · in Transportation · the state’s standard line “Other Transportation Systems / Services” (2025, actual spending, governmental and business funds, including transfers only) |
| 16 | Yuba County, CA | 87,469 | $21.8 million | $250/res. | Roads $21.8 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Roads” (2025, actual spending) |
| 17 | Pottawattamie County, IA | 93,529 | $20.6 million | $220/res. | Roads & Transportation $20.6 million · in Roads & Transportation · the state’s standard line “Roads & Transportation” (2027) |
| 18 | Portsmouth city, VA | 96,482 | $20.6 million | $213/res. | Maintenance of Highways, Streets, Bridges, and Sidewalks $20.6 million · in Public Works · the state’s standard line “Maintenance of Highways, Streets, Bridges, and Sidewalks” (2025, actual spending, day-to-day operations, including the school division only) |
| 19 | Lake County, CA | 67,764 | $20.5 million | $302/res. | Roads $6.6 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Roads” Other Public Ways and Facilities $13.8 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Other Public Ways and Facilities” (2025, actual spending) |
| 20 | Rice County, MN | 69,025 | $20.4 million | $296/res. | Administration $459,745 · in Streets and Highways · the state’s standard line “Administration” Maintenance $5.8 million · in Streets and Highways · the state’s standard line “Maintenance” Construction $12.8 million · in Streets and Highways · the state’s standard line “Construction” All other streets and highways: buildings and equipment $1.4 million · in Streets and Highways · the state’s standard line “All other streets and highways: buildings and equipment” (2024, actual spending, governmental funds, not utilities only) |
| 21 | Lonoke County, AR | 76,389 | $20.1 million | $263/res. | Road and Bridge $20.1 million · name contains “road” (2026) |
| 22 | Montcalm County, MI | 69,314 | $19.3 million | $278/res. | Public Works (Non-Act 51) $1.7 million · in Public Works · the state’s standard line “Public Works (Non-Act 51)” Road Commission/Street Dept. (Act 51) $17.6 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending) |
| 23 | Lenawee County, MI | 97,746 | $19.1 million | $196/res. | Public Works (Non-Act 51) $190,179 · in Public Works · the state’s standard line “Public Works (Non-Act 51)” Road Commission/Street Dept. (Act 51) $18.9 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending) |
| 24 | Lapeer County, MI | 89,168 | $18.4 million | $207/res. | Public Works (Non-Act 51) $637,839 · in Public Works · the state’s standard line “Public Works (Non-Act 51)” Road Commission/Street Dept. (Act 51) $17.8 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending) |
| 25 | Lynchburg city, VA | 80,301 | $18.3 million | $228/res. | Maintenance of Highways, Streets, Bridges, and Sidewalks $18.3 million · in Public Works · the state’s standard line “Maintenance of Highways, Streets, Bridges, and Sidewalks” (2025, actual spending, day-to-day operations, including the school division only) |
| 26 | Shiawassee County, MI | 67,982 | $17.7 million | $260/res. | Public Works (Non-Act 51) $657,148 · in Public Works · the state’s standard line “Public Works (Non-Act 51)” Road Commission/Street Dept. (Act 51) $17.0 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending) |
| 27 | Clay County, MN | 66,848 | $17.2 million | $257/res. | Administration $700,328 · in Streets and Highways · the state’s standard line “Administration” Maintenance $7.8 million · in Streets and Highways · the state’s standard line “Maintenance” Construction $8.7 million · in Streets and Highways · the state’s standard line “Construction” (2024, actual spending, governmental funds, not utilities only) |
| 28 | Dodge County, WI | 88,635 | $17.1 million | $193/res. | Highway Maintenance and Administration $7.9 million · in Transportation · the state’s standard line “Highway Maintenance and Administration” Highway Construction $9.2 million · in Transportation · the state’s standard line “Highway Construction” Other Transportation $30,000 · in Transportation · the state’s standard line “Other Transportation” (2024, actual spending, governmental funds, including transfers only) |
| 29 | Midland County, MI | 84,022 | $16.9 million | $201/res. | Public Works (Non-Act 51) $3.1 million · in Public Works · the state’s standard line “Public Works (Non-Act 51)” Road Commission/Street Dept. (Act 51) $13.7 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending) |
| 30 | Ionia County, MI | 66,250 | $16.5 million | $249/res. | Road Commission/Street Dept. (Act 51) $16.5 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending) |
| 31 | Laramie County, WY | 101,783 | $16.1 million | $158/res. | Road and bridge $8.1 million · in Roads and bridges · name contains “road” Road and bridge (construction) $7.7 million · in Roads and bridges · name contains “road” Road and bridge (equipment, land and buildings) $276,159 · in Roads and bridges · name contains “road” (2025, actual spending, all county funds, not separate boards only) |
| 32 | Cattaraugus County, NY | 75,475 | $15.9 million | $210/res. | Public Works Administration $350,623 · in General Government · name contains “public works” Maintenance of Roads $7.3 million · in Transportation · name contains “roads” Machinery $4.0 million · in Transportation · the state’s standard line “Machinery” Snow Removal $3.0 million · in Transportation · the state’s standard line “Snow Removal” Engineering $546,775 · in Transportation · name contains “engineering” Maintenance of Bridges $318,631 · in Transportation · name contains “bridges” Highway and Street Administration $364,594 · in Transportation · name contains “highway” (2024, actual spending) |
| 33 | Leavenworth County, KS | 84,670 | $15.5 million | $183/res. | Road & Bridge $15.5 million · in Roads and bridges · name contains “road” (2026, all budgeted funds, spending authority only) |
| 34 | Chippewa County, WI | 67,323 | $15.3 million | $228/res. | Highway Maintenance and Administration $6.3 million · in Transportation · the state’s standard line “Highway Maintenance and Administration” Highway Construction $8.2 million · in Transportation · the state’s standard line “Highway Construction” Road-Related Facilities $654,741 · in Transportation · the state’s standard line “Road-Related Facilities” Other Transportation $132,890 · in Transportation · the state’s standard line “Other Transportation” (2024, actual spending, governmental funds, including transfers only) |
| 35 | Allegany County, MD | 67,097 | $14.9 million | $222/res. | Transportation $14.9 million · in Public Works · the state’s standard line “Transportation” (2024, actual spending, county government, including transfers to school and other boards only) |
| 36 | Dubuque County, IA | 99,242 | $14.6 million | $147/res. | Roads & Transportation $14.6 million · in Roads & Transportation · the state’s standard line “Roads & Transportation” (2027) |
| 37 | Hancock County, IN | 88,810 | $14.4 million | $162/res. | Highway $11.8 million · in Roads and bridges · name contains “highway” Cumulative Bridge $2.1 million · in Roads and bridges · name contains “bridge” Local Road & Street $495,000 · in Roads and bridges · name contains “road” (2026, all county funds, as adopted (before state review) only) |
| 38 | Putnam County, FL | 77,301 | $14.3 million | $185/res. | Road and Street Facilities $14.3 million · in Transportation · the state’s standard line “Road and Street Facilities” (2025, actual spending, governmental and business funds, including transfers only) |
| 39 | Sevier County, TN | 100,184 | $14.2 million | $141/res. | Litter and Trash Collection $461,715 · in Highways · the state’s standard line “Litter and Trash Collection” Other Charges $865,734 · in Highways · the state’s standard line “Other Charges” Administration $360,709 · in Highways · the state’s standard line “Administration” Highway and Bridge Maintenance $8.7 million · in Highways · the state’s standard line “Highway and Bridge Maintenance” Operation and Maintenance of Equipment $1.7 million · in Highways · the state’s standard line “Operation and Maintenance of Equipment” Quarry Operations $174,449 · in Highways · the state’s standard line “Quarry Operations” Traffic Control $148,089 · in Highways · the state’s standard line “Traffic Control” Capital Outlay $1.8 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only) |
| 40 | Island County, WA | 86,478 | $14.1 million | $163/res. | Roadway $2.5 million · in Transportation · the state’s standard line “Roadway” Drainage $752,403 · in Transportation · the state’s standard line “Drainage” Sidewalks $242 · in Transportation · the state’s standard line “Sidewalks” Special Purpose Paths $9,442 · in Transportation · the state’s standard line “Special Purpose Paths” Street Lighting $23,180 · in Transportation · the state’s standard line “Street Lighting” Traffic Control Devices $1.3 million · in Transportation · the state’s standard line “Traffic Control Devices” Parking Facilities $1,559 · in Transportation · the state’s standard line “Parking Facilities” Snow and Ice Control $231,540 · in Transportation · the state’s standard line “Snow and Ice Control” Street Cleaning $467,592 · in Transportation · the state’s standard line “Street Cleaning” Roadside $1.1 million · in Transportation · the state’s standard line “Roadside” Ancillary Operations $4,430 · in Transportation · the state’s standard line “Ancillary Operations” Maintenance Administration and Overhead $343,931 · in Transportation · the state’s standard line “Maintenance Administration and Overhead” Management $810,967 · in Transportation · the state’s standard line “Management” General Services $1.3 million · in Transportation · the state’s standard line “General Services” Facilities $17,189 · in Transportation · the state’s standard line “Facilities” Engineering $1.1 million · in Transportation · the state’s standard line “Engineering” Planning $601,904 · in Transportation · the state’s standard line “Planning” Operations Administration and Overhead $3.5 million · in Transportation · the state’s standard line “Operations Administration and Overhead” (2025, actual spending) |
| 41 | Rockdale County, GA | 97,610 | $14.1 million | $144/res. | Public Works Administration $1.1 million · in Public Works · the state’s standard line “Public Works Administration” Roads, Streets, and Bridges $13.0 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only) |
| 42 | Nevada County, CA | 102,195 | $13.8 million | $135/res. | Roads $13.3 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Roads” Other Public Ways and Facilities $445,521 · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Other Public Ways and Facilities” (2025, actual spending) |
| 43 | Madison County, TN | 100,409 | $13.7 million | $136/res. | Administration $645,356 · in Highways · the state’s standard line “Administration” Highway and Bridge Maintenance $3.7 million · in Highways · the state’s standard line “Highway and Bridge Maintenance” Operation and Maintenance of Equipment $465,885 · in Highways · the state’s standard line “Operation and Maintenance of Equipment” Other Charges $189,451 · in Highways · the state’s standard line “Other Charges” Capital Outlay $8.7 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only) |
| 44 | Butler County, KS | 69,158 | $13.7 million | $198/res. | Road & Bridge (0041) $13.6 million · in Roads and bridges · name contains “road” Bridge Building (0042) $91,310 · in Roads and bridges · name contains “bridge” Street Lighting (0074) $7,010 · in Roads and bridges · name contains “street” (2026, all budgeted funds, spending authority only) |
| 45 | Walker County, GA | 69,340 | $13.4 million | $194/res. | Public Works Administration $12,277 · in Public Works · the state’s standard line “Public Works Administration” Roads, Streets, and Bridges $13.4 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only) |
| 46 | Grays Harbor County, WA | 77,893 | $13.3 million | $171/res. | Roadway $4.0 million · in Transportation · the state’s standard line “Roadway” Drainage $428,011 · in Transportation · the state’s standard line “Drainage” Structures $74,645 · in Transportation · the state’s standard line “Structures” Traffic Control Devices $1.0 million · in Transportation · the state’s standard line “Traffic Control Devices” Snow and Ice Control $578,295 · in Transportation · the state’s standard line “Snow and Ice Control” Street Cleaning $199,837 · in Transportation · the state’s standard line “Street Cleaning” Roadside $1.6 million · in Transportation · the state’s standard line “Roadside” Ancillary Operations $814,562 · in Transportation · the state’s standard line “Ancillary Operations” Maintenance Administration and Overhead $2.5 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead” General Services $653,585 · in Transportation · the state’s standard line “General Services” Engineering $966,953 · in Transportation · the state’s standard line “Engineering” Planning $20,643 · in Transportation · the state’s standard line “Planning” Operations Administration and Overhead $420,107 · in Transportation · the state’s standard line “Operations Administration and Overhead” Roads/Streets Extraordinary Operations $63,572 · in Transportation · the state’s standard line “Roads/Streets Extraordinary Operations” (2025, actual spending) |
| 47 | Clallam County, WA | 77,958 | $13.1 million | $167/res. | Roadway $3.1 million · in Transportation · the state’s standard line “Roadway” Drainage $447,468 · in Transportation · the state’s standard line “Drainage” Structures $160,363 · in Transportation · the state’s standard line “Structures” Other Traffic and Pedestrian Services $1.8 million · in Transportation · the state’s standard line “Other Traffic and Pedestrian Services” Roadside $1.2 million · in Transportation · the state’s standard line “Roadside” Maintenance Administration and Overhead $1.7 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead” Management $67,986 · in Transportation · the state’s standard line “Management” General Services $2.5 million · in Transportation · the state’s standard line “General Services” Facilities $181,840 · in Transportation · the state’s standard line “Facilities” Engineering $542,437 · in Transportation · the state’s standard line “Engineering” Planning $118,463 · in Transportation · the state’s standard line “Planning” Operations Administration and Overhead $1.3 million · in Transportation · the state’s standard line “Operations Administration and Overhead” (2025, actual spending) |
| 48 | Riley County, KS | 72,557 | $13.0 million | $179/res. | Road & Bridge 1/2 Cent Sales Tax - 157 $4.7 million · in Roads and bridges · name contains “road” Road & Bridge 0.2 Cent Sales Tax - Fund $8.3 million · in Roads and bridges · name contains “road” (2026, all budgeted funds, spending authority only) |
| 49 | Wood County, WI | 73,943 | $12.7 million | $172/res. | Highway Maintenance and Administration $7.8 million · in Transportation · the state’s standard line “Highway Maintenance and Administration” Highway Construction $4.0 million · in Transportation · the state’s standard line “Highway Construction” Road-Related Facilities $962,160 · in Transportation · the state’s standard line “Road-Related Facilities” (2024, actual spending, governmental funds, including transfers only) |
| 50 | Chelan County, WA | 81,228 | $12.4 million | $153/res. | Roadway $3.8 million · in Transportation · the state’s standard line “Roadway” Drainage $401,713 · in Transportation · the state’s standard line “Drainage” Structures $54,473 · in Transportation · the state’s standard line “Structures” Sidewalks $3,203 · in Transportation · the state’s standard line “Sidewalks” Special Purpose Paths $218 · in Transportation · the state’s standard line “Special Purpose Paths” Street Lighting $19,775 · in Transportation · the state’s standard line “Street Lighting” Traffic Control Devices $623,827 · in Transportation · the state’s standard line “Traffic Control Devices” Snow and Ice Control $2.1 million · in Transportation · the state’s standard line “Snow and Ice Control” Street Cleaning $263,457 · in Transportation · the state’s standard line “Street Cleaning” Roadside $539,548 · in Transportation · the state’s standard line “Roadside” Maintenance Administration and Overhead $1.3 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead” Management $222,701 · in Transportation · the state’s standard line “Management” General Services $1.3 million · in Transportation · the state’s standard line “General Services” Facilities $179,094 · in Transportation · the state’s standard line “Facilities” Engineering $1.5 million · in Transportation · the state’s standard line “Engineering” Roads/Streets Extraordinary Operations $134,429 · in Transportation · the state’s standard line “Roads/Streets Extraordinary Operations” (2023, actual spending) |
| 51 | Van Buren County, MI | 76,129 | $12.2 million | $160/res. | Public Works (Non-Act 51) $511,544 · in Public Works · the state’s standard line “Public Works (Non-Act 51)” Road Commission/Street Dept. (Act 51) $11.7 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending) |
| 52 | Portage County, WI | 72,040 | $12.0 million | $167/res. | Highway Maintenance and Administration $8.5 million · in Transportation · the state’s standard line “Highway Maintenance and Administration” Highway Construction $2.9 million · in Transportation · the state’s standard line “Highway Construction” Road-Related Facilities $106,096 · in Transportation · the state’s standard line “Road-Related Facilities” Other Transportation $508,480 · in Transportation · the state’s standard line “Other Transportation” (2024, actual spending, governmental funds, including transfers only) |
| 53 | Roanoke city, VA | 97,912 | $12.0 million | $122/res. | Maintenance of Highways, Streets, Bridges, and Sidewalks $12.0 million · in Public Works · the state’s standard line “Maintenance of Highways, Streets, Bridges, and Sidewalks” (2025, actual spending, day-to-day operations, including the school division only) |
| 54 | Sutter County, CA | 98,545 | $12.0 million | $122/res. | Roads $11.7 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Roads” Transportation Terminals $18,973 · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Transportation Terminals” Transportation Systems $287,504 · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Transportation Systems” (2025, actual spending) |
| 55 | Barrow County, GA | 96,294 | $12.0 million | $124/res. | Public Works Administration $1.7 million · in Public Works · the state’s standard line “Public Works Administration” Roads, Streets, and Bridges $10.3 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only) |
| 56 | White County, AR | 79,091 | $11.9 million | $151/res. | County General Road Fund $1.1 million · in County General Fund · name contains “road” County Road Fund $10.1 million · name contains “road” Additional Motor Fuel Tax Fund $358,971 · name contains “motor fuel” Road Department $300,000 · in Capital Improvement Fund · name contains “road” (2026) |
| 57 | Mason County, WA | 69,632 | $11.9 million | $171/res. | Engineering $8.0 million · in Transportation · the state’s standard line “Engineering” Management $2.5 million · in Transportation · the state’s standard line “Management” Engineering $1.4 million · in Transportation · the state’s standard line “Engineering” (2025, actual spending) |
| 58 | Putnam County, NY | 98,409 | $11.8 million | $120/res. | Public Works Administration $696,828 · in General Government · name contains “public works” Engineer $540,891 · in General Government · name contains “engineer” Other Transportation $4.7 million · in Transportation · name contains “transportation” Maintenance of Roads $2.6 million · in Transportation · name contains “roads” Machinery $1.9 million · in Transportation · the state’s standard line “Machinery” Snow Removal $880,541 · in Transportation · the state’s standard line “Snow Removal” Snow Removal, State $505,050 · in Transportation · the state’s standard line “Snow Removal, State” (2024, actual spending) |
| 59 | Effingham County, GA | 73,148 | $11.8 million | $162/res. | Roads, Streets, and Bridges $11.8 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only) |
| 60 | St. Croix County, WI | 97,954 | $11.8 million | $120/res. | Highway Maintenance and Administration $9.8 million · in Transportation · the state’s standard line “Highway Maintenance and Administration” Highway Construction $2.0 million · in Transportation · the state’s standard line “Highway Construction” (2024, actual spending, governmental funds, including transfers only) |
| 61 | DeKalb County, IL | 101,335 | $11.7 million | $115/res. | Streets and Highways $11.7 million · in Transportation and Public Works · the state’s standard line “Streets and Highways” (2025, actual spending, governmental funds and county-run businesses only) |
| 62 | Manitowoc County, WI | 81,513 | $11.5 million | $141/res. | Highway Maintenance and Administration −$2.2 million · in Transportation · the state’s standard line “Highway Maintenance and Administration” Highway Construction $13.2 million · in Transportation · the state’s standard line “Highway Construction” Road-Related Facilities $113,914 · in Transportation · the state’s standard line “Road-Related Facilities” Other Transportation $425,006 · in Transportation · the state’s standard line “Other Transportation” (2024, actual spending, governmental funds, including transfers only) |
| 63 | Floyd County, GA | 101,390 | $11.5 million | $113/res. | General Engineering $257,145 · in General Government · the state’s standard line “General Engineering” Public Works Administration $7.3 million · in Public Works · the state’s standard line “Public Works Administration” Roads, Streets, and Bridges $3.9 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2023, actual spending, operations and capital, including utility systems, not debt only) |
| 64 | Madison County, NY | 67,072 | $11.4 million | $170/res. | Maintenance of Roads $5.5 million · in Transportation · name contains “roads” Snow Removal $1.4 million · in Transportation · the state’s standard line “Snow Removal” Machinery $2.9 million · in Transportation · the state’s standard line “Machinery” Transportation, Other $629,404 · in Transportation · name contains “transportation” Highway and Street Administration $409,491 · in Transportation · name contains “highway” Snow Removal, State $282,146 · in Transportation · the state’s standard line “Snow Removal, State” Engineering $181,808 · in Transportation · name contains “engineering” Water Transportation and Distribution $18,227 · in Utilities · name contains “transportation” (2024, actual spending) |
| 65 | Wayne County, IN | 66,410 | $11.3 million | $170/res. | Highway $6.0 million · in Roads and bridges · name contains “highway” Cumulative Bridge $4.5 million · in Roads and bridges · name contains “bridge” Local Road & Street $767,501 · in Roads and bridges · name contains “road” (2026, all county funds, as adopted (before state review) only) |
| 66 | Ozaukee County, WI | 93,956 | $10.9 million | $116/res. | Highway Maintenance and Administration $4.1 million · in Transportation · the state’s standard line “Highway Maintenance and Administration” Highway Construction $2.2 million · in Transportation · the state’s standard line “Highway Construction” Road-Related Facilities $956,945 · in Transportation · the state’s standard line “Road-Related Facilities” Other Transportation $3.5 million · in Transportation · the state’s standard line “Other Transportation” (2024, actual spending, governmental funds, including transfers only) |
| 67 | Spalding County, GA | 70,292 | $10.8 million | $154/res. | Public Works Administration $195,998 · in Public Works · the state’s standard line “Public Works Administration” Roads, Streets, and Bridges $10.6 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only) |
| 68 | Warrick County, IN | 66,339 | $10.0 million | $150/res. | Highway $4.5 million · in Roads and bridges · name contains “highway” LIT Road Fund $3.7 million · in Roads and bridges · name contains “road” Local Road & Street $1.4 million · in Roads and bridges · name contains “road” Cumulative Bridge $296,661 · in Roads and bridges · name contains “bridge” (2026, all county funds, as adopted (before state review) only) |
| 69 | Morgan County, IN | 73,825 | $9.7 million | $131/res. | Highway $8.4 million · in Roads and bridges · name contains “highway” Local Road & Street $1.3 million · in Roads and bridges · name contains “road” (2026, all county funds, as adopted (before state review) only) |
| 70 | Liberty County, GA | 68,607 | $9.5 million | $139/res. | General Engineering $117,031 · in General Government · the state’s standard line “General Engineering” Roads, Streets, and Bridges $9.4 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only) |
| 71 | Marquette County, MI | 67,979 | $9.4 million | $138/res. | Public Works (Non-Act 51) $56,125 · in Public Works · the state’s standard line “Public Works (Non-Act 51)” Road Commission/Street Dept. (Act 51) $9.4 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending) |
| 72 | Bannock County, ID | 91,010 | $9.4 million | $103/res. | Road & Bridge $9.4 million · in Road and Bridge · name contains “road” Engineer $0 · in Road and Bridge · name contains “engineer” (2025) |
| 73 | Bulloch County, GA | 85,454 | $9.4 million | $110/res. | General Engineering $265,161 · in General Government · the state’s standard line “General Engineering” Roads, Streets, and Bridges $9.1 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only) |
| 74 | Cayuga County, NY | 74,567 | $9.4 million | $125/res. | Maintenance of Roads $4.0 million · in Transportation · name contains “roads” Snow Removal $1.8 million · in Transportation · the state’s standard line “Snow Removal” Machinery $2.6 million · in Transportation · the state’s standard line “Machinery” Snow Removal, State $516,599 · in Transportation · the state’s standard line “Snow Removal, State” Highway and Street Administration $354,751 · in Transportation · name contains “highway” Maintenance of Bridges $67,564 · in Transportation · name contains “bridges” Highway Services for Other Governments $61,611 · in Transportation · name contains “highway” (2024, actual spending) |
| 75 | Story County, IA | 102,498 | $9.2 million | $89.76/res. | Roads & Transportation $9.2 million · in Roads & Transportation · the state’s standard line “Roads & Transportation” (2027) |
| 76 | Boone County, IN | 78,773 | $9.1 million | $116/res. | Highway $5.6 million · in Roads and bridges · name contains “highway” Cumulative Bridge $2.9 million · in Roads and bridges · name contains “bridge” Local Road & Street $720,000 · in Roads and bridges · name contains “road” (2026, all county funds, as adopted (before state review) only) |
| 77 | Greene County, TN | 73,398 | $9.1 million | $124/res. | Administration $294,927 · in Highways · the state’s standard line “Administration” Highway and Bridge Maintenance $5.6 million · in Highways · the state’s standard line “Highway and Bridge Maintenance” Operation and Maintenance of Equipment $1.2 million · in Highways · the state’s standard line “Operation and Maintenance of Equipment” Asphalt Plant Operations $1.3 million · in Highways · the state’s standard line “Asphalt Plant Operations” Other Charges $102,108 · in Highways · the state’s standard line “Other Charges” Capital Outlay $563,719 · in Highways · the state’s standard line “Capital Outlay” Public Transportation $24,916 · in Other Operations · name contains “transportation” (2025, actual spending, governmental funds, including schools only) |
| 78 | Putnam County, TN | 84,894 | $8.9 million | $105/res. | Administration $1.1 million · in Highways · the state’s standard line “Administration” Highway and Bridge Maintenance $5.0 million · in Highways · the state’s standard line “Highway and Bridge Maintenance” Operation and Maintenance of Equipment $561,572 · in Highways · the state’s standard line “Operation and Maintenance of Equipment” Other Charges $343,022 · in Highways · the state’s standard line “Other Charges” Capital Outlay $2.0 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only) |
| 79 | Jefferson County, WI | 86,245 | $8.9 million | $104/res. | Highway Maintenance and Administration $3.7 million · in Transportation · the state’s standard line “Highway Maintenance and Administration” Highway Construction $4.8 million · in Transportation · the state’s standard line “Highway Construction” Road-Related Facilities $383,818 · in Transportation · the state’s standard line “Road-Related Facilities” (2024, actual spending, governmental funds, including transfers only) |
| 80 | Sauk County, WI | 66,486 | $8.4 million | $126/res. | Highway Maintenance and Administration $6.8 million · in Transportation · the state’s standard line “Highway Maintenance and Administration” Highway Construction $1.4 million · in Transportation · the state’s standard line “Highway Construction” Other Transportation $200,867 · in Transportation · the state’s standard line “Other Transportation” (2024, actual spending, governmental funds, including transfers only) |
| 81 | Troup County, GA | 71,513 | $8.3 million | $115/res. | Roads, Streets, and Bridges $8.3 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only) |
| 82 | Clinton County, NY | 77,871 | $7.9 million | $101/res. | Snow Removal $2.5 million · in Transportation · the state’s standard line “Snow Removal” Maintenance of Roads $2.7 million · in Transportation · name contains “roads” Machinery $2.3 million · in Transportation · the state’s standard line “Machinery” Highway and Street Administration $326,303 · in Transportation · name contains “highway” Engineering $132,959 · in Transportation · name contains “engineering” Maintenance of Bridges $18,876 · in Transportation · name contains “bridges” (2024, actual spending) |
| 83 | Bartholomew County, IN | 84,741 | $7.8 million | $91.77/res. | Highway $5.0 million · in Roads and bridges · name contains “highway” Cumulative Bridge $1.8 million · in Roads and bridges · name contains “bridge” Local Road & Street $995,000 · in Roads and bridges · name contains “road” (2026, all county funds, as adopted (before state review) only) |
| 84 | Wayne County, NY | 90,757 | $7.5 million | $82.72/res. | Maintenance of Roads $3.7 million · in Transportation · name contains “roads” Snow Removal $1.5 million · in Transportation · the state’s standard line “Snow Removal” Machinery $1.8 million · in Transportation · the state’s standard line “Machinery” Highway and Street Administration $277,371 · in Transportation · name contains “highway” Engineering $209,672 · in Transportation · name contains “engineering” (2024, actual spending) |
| 85 | Franklin County, WA | 101,238 | $6.9 million | $68.17/res. | Engineering $43,405 · in Transportation · the state’s standard line “Engineering” Roadway $2.5 million · in Transportation · the state’s standard line “Roadway” Drainage $291,334 · in Transportation · the state’s standard line “Drainage” Structures $141,449 · in Transportation · the state’s standard line “Structures” Street Lighting $14,741 · in Transportation · the state’s standard line “Street Lighting” Traffic Control Devices $391,092 · in Transportation · the state’s standard line “Traffic Control Devices” Snow and Ice Control $135,357 · in Transportation · the state’s standard line “Snow and Ice Control” Street Cleaning $177,671 · in Transportation · the state’s standard line “Street Cleaning” Roadside $729,257 · in Transportation · the state’s standard line “Roadside” Maintenance Administration and Overhead $603,242 · in Transportation · the state’s standard line “Maintenance Administration and Overhead” Management $477,027 · in Transportation · the state’s standard line “Management” General Services $714,513 · in Transportation · the state’s standard line “General Services” Facilities $120,157 · in Transportation · the state’s standard line “Facilities” Engineering $265,096 · in Transportation · the state’s standard line “Engineering” Planning $151,790 · in Transportation · the state’s standard line “Planning” Operations Administration and Overhead $110,611 · in Transportation · the state’s standard line “Operations Administration and Overhead” (2025, actual spending) |
| 86 | Chemung County, NY | 81,115 | $6.7 million | $82.78/res. | Maintenance of Roads $4.9 million · in Transportation · name contains “roads” Machinery $1.2 million · in Transportation · the state’s standard line “Machinery” Highway and Street Administration $464,383 · in Transportation · name contains “highway” Engineering $168,967 · in Transportation · name contains “engineering” (2024, actual spending) |
| 87 | Howard County, IN | 84,082 | $6.6 million | $78.27/res. | Highway $4.9 million · in Roads and bridges · name contains “highway” Cumulative Bridge $890,000 · in Roads and bridges · name contains “bridge” Local Road & Street $794,000 · in Roads and bridges · name contains “road” (2026, all county funds, as adopted (before state review) only) |
| 88 | Robertson County, TN | 78,459 | $6.5 million | $82.64/res. | Engineering $213,079 · in General Government · name contains “engineering” Administration $431,399 · in Highways · the state’s standard line “Administration” Highway and Bridge Maintenance $3.1 million · in Highways · the state’s standard line “Highway and Bridge Maintenance” Operation and Maintenance of Equipment $447,065 · in Highways · the state’s standard line “Operation and Maintenance of Equipment” Other Charges $461,473 · in Highways · the state’s standard line “Other Charges” Capital Outlay $1.9 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only) |
| 89 | Grant County, IN | 66,458 | $6.3 million | $94.21/res. | Highway $4.5 million · in Roads and bridges · name contains “highway” Cumulative Bridge $1.2 million · in Roads and bridges · name contains “bridge” Local Road & Street $600,000 · in Roads and bridges · name contains “road” (2026, all county funds, as adopted (before state review) only) |
| 90 | Natrona County, WY | 80,410 | $6.1 million | $75.97/res. | Road and bridge $3.1 million · in Roads and bridges · name contains “road” Road and bridge (construction) $1.3 million · in Roads and bridges · name contains “road” Road and bridge (equipment, land and buildings) $1.7 million · in Roads and bridges · name contains “road” (2025, actual spending, all county funds, not separate boards only) |
| 91 | Catoosa County, GA | 68,940 | $5.9 million | $85.57/res. | General Engineering $34,072 · in General Government · the state’s standard line “General Engineering” Public Works Administration $298,331 · in Public Works · the state’s standard line “Public Works Administration” Roads, Streets, and Bridges $5.6 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only) |
| 92 | Williamson County, IL | 67,064 | $5.8 million | $87.00/res. | Streets and Highways $5.8 million · in Transportation and Public Works · the state’s standard line “Streets and Highways” (2024, actual spending, governmental funds and county-run businesses only) |
| 93 | Pulaski County, KY | 66,842 | $5.8 million | $87.00/res. | Road Fund $5.8 million · in Roads · the state’s standard line “Road Fund” (2024, all budgeted funds, final (amended) budget only) |
| 94 | San Benito County, CA | 69,159 | $5.5 million | $78.96/res. | Roads $3.9 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Roads” Other Public Ways and Facilities $1.5 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Other Public Ways and Facilities” (2025, actual spending) |
| 95 | Anderson County, TN | 81,449 | $5.4 million | $66.30/res. | Administration $294,945 · in Highways · the state’s standard line “Administration” Highway and Bridge Maintenance $3.0 million · in Highways · the state’s standard line “Highway and Bridge Maintenance” Operation and Maintenance of Equipment $767,408 · in Highways · the state’s standard line “Operation and Maintenance of Equipment” Other Charges $264,587 · in Highways · the state’s standard line “Other Charges” Capital Outlay $1.1 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only) |
| 96 | Christian County, KY | 71,006 | $5.1 million | $72.19/res. | Road Fund $4.7 million · in Roads · the state’s standard line “Road Fund” Local Government Economic Assistance Fund $415,000 · in Roads · the state’s standard line “Local Government Economic Assistance Fund” (2025, all budgeted funds, final (amended) budget only) |
| 97 | Bullitt County, KY | 85,802 | $5.1 million | $59.12/res. | Road Fund $4.1 million · in Roads · the state’s standard line “Road Fund” Local Government Economic Assistance Fund $980,645 · in Roads · the state’s standard line “Local Government Economic Assistance Fund” (2025, all budgeted funds, final (amended) budget only) |
| 98 | Glynn County, GA | 86,540 | $4.9 million | $56.30/res. | General Engineering $1.0 million · in General Government · the state’s standard line “General Engineering” Public Works Administration $2.0 million · in Public Works · the state’s standard line “Public Works Administration” Roads, Streets, and Bridges $1.8 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only) |
| 99 | Floyd County, IN | 81,931 | $4.8 million | $58.69/res. | Highway $3.1 million · in Roads and bridges · name contains “highway” Local Road & Street $970,000 · in Roads and bridges · name contains “road” Cumulative Bridge $776,650 · in Roads and bridges · name contains “bridge” (2026, all county funds, as adopted (before state review) only) |
| 100 | Jackson County, GA | 93,825 | $4.3 million | $45.91/res. | General Engineering $390,189 · in General Government · the state’s standard line “General Engineering” Public Works Administration $27,350 · in Public Works · the state’s standard line “Public Works Administration” Roads, Streets, and Bridges $3.9 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only) |
| 101 | Macon County, IL | 100,737 | $4.0 million | $39.42/res. | Streets and Highways $4.0 million · in Transportation and Public Works · the state’s standard line “Streets and Highways” (2025, actual spending, governmental funds and county-run businesses only) |
| 102 | Madison County, KY | 99,582 | $3.9 million | $38.76/res. | Road Fund $3.8 million · in Roads · the state’s standard line “Road Fund” Local Government Economic Assistance Fund $100,000 · in Roads · the state’s standard line “Local Government Economic Assistance Fund” (2024, all budgeted funds, final (amended) budget only) |
| 103 | McCracken County, KY | 67,550 | $3.7 million | $54.57/res. | Road Fund $3.7 million · in Roads · the state’s standard line “Road Fund” (2023, all budgeted funds, final (amended) budget only) |
| 104 | Vermilion County, IL | 71,106 | $3.6 million | $51.17/res. | Streets and Highways $3.6 million · in Transportation and Public Works · the state’s standard line “Streets and Highways” (2025, actual spending, governmental funds and county-run businesses only) |
| 105 | Dougherty County, GA | 82,418 | $3.4 million | $41.72/res. | General Engineering $439,245 · in General Government · the state’s standard line “General Engineering” Public Works Administration $2.1 million · in Public Works · the state’s standard line “Public Works Administration” Roads, Streets, and Bridges $870,485 · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only) |
| 106 | James City County, VA | 82,797 | $3.0 million | $35.71/res. | Maintenance of Highways, Streets, Bridges, and Sidewalks $3.0 million · in Public Works · the state’s standard line “Maintenance of Highways, Streets, Bridges, and Sidewalks” (2025, actual spending, day-to-day operations, including the school division only) |
| 107 | Hamblen County, TN | 67,715 | $2.3 million | $34.67/res. | Administration $474,582 · in Highways · the state’s standard line “Administration” Highway and Bridge Maintenance $1.4 million · in Highways · the state’s standard line “Highway and Bridge Maintenance” Operation and Maintenance of Equipment $427,993 · in Highways · the state’s standard line “Operation and Maintenance of Equipment” Capital Outlay $1,814 · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only) |
| 108 | Carteret County, NC | 70,259 | $2.3 million | $32.34/res. | All other transportation $2.3 million · in Other · the state’s standard line “All other transportation” (2025, actual spending) |
| 109 | Crawford County, PA | 82,089 | $1.5 million | $18.27/res. | Highways and Streets $1.5 million · in Transportation · the state’s standard line “Highways and Streets” (2024, actual spending, governmental funds, not transfers only) |
| 110 | Indiana County, PA | 82,953 | $1.2 million | $15.06/res. | Highways and Streets $1.2 million · in Transportation · the state’s standard line “Highways and Streets” (2024, actual spending, governmental funds, not transfers only) |
| 111 | Lawrence County, PA | 84,233 | $999,821 | $11.87/res. | Highways and Streets $999,821 · in Transportation · the state’s standard line “Highways and Streets” (2024, actual spending, governmental funds, not transfers only) |
| 112 | Rockingham County, VA | 87,674 | $848,142 | $9.67/res. | Maintenance of Highways, Streets, Bridges, and Sidewalks $848,142 · in Public Works · the state’s standard line “Maintenance of Highways, Streets, Bridges, and Sidewalks” (2025, actual spending, day-to-day operations, including the school division only) |
| 113 | Augusta County, VA | 78,622 | $142,211 | $1.81/res. | Maintenance of Highways, Streets, Bridges, and Sidewalks $142,211 · in Public Works · the state’s standard line “Maintenance of Highways, Streets, Bridges, and Sidewalks” (2025, actual spending, day-to-day operations, including the school division only) |
| 114 | Clearfield County, PA | 78,132 | $130,309 | $1.67/res. | Highways and Streets $130,309 · in Transportation · the state’s standard line “Highways and Streets” (2022, actual spending, governmental funds, not transfers only) |
| 115 | Frederick County, VA | 98,109 | $51,271 | $0.52/res. | Maintenance of Highways, Streets, Bridges, and Sidewalks $51,271 · in Public Works · the state’s standard line “Maintenance of Highways, Streets, Bridges, and Sidewalks” (2025, actual spending, day-to-day operations, including the school division only) |
| 116 | Twin Falls County, ID | 96,509 | $0 | $0.00/res. | no line matched in this budget (2025) |
| 117 | Burke County, NC | 88,545 | $0 | $0.00/res. | no line matched in this budget (2025, actual spending) |
| 118 | Caldwell County, NC | 80,739 | $0 | $0.00/res. | no line matched in this budget (2025, actual spending) |
| 119 | Chatham County, NC | 83,874 | $0 | $0.00/res. | no line matched in this budget (2025, actual spending) |
| 120 | Cleveland County, NC | 102,194 | $0 | $0.00/res. | no line matched in this budget (2025, actual spending) |
| 121 | Franklin County, NC | 79,771 | $0 | $0.00/res. | no line matched in this budget (2025, actual spending) |
| 122 | Lee County, NC | 68,537 | $0 | $0.00/res. | no line matched in this budget (2025, actual spending) |
| 123 | Lincoln County, NC | 97,611 | $0 | $0.00/res. | no line matched in this budget (2025, actual spending) |
| 124 | Nash County, NC | 97,990 | $0 | $0.00/res. | no line matched in this budget (2025, actual spending) |
| 125 | Rockingham County, NC | 93,517 | $0 | $0.00/res. | no line matched in this budget (2025, actual spending) |
| 126 | Stanly County, NC | 67,326 | $0 | $0.00/res. | no line matched in this budget (2025, actual spending) |
| 127 | Surry County, NC | 71,547 | $0 | $0.00/res. | no line matched in this budget (2025, actual spending) |
| 128 | Wilkes County, NC | 66,186 | $0 | $0.00/res. | no line matched in this budget (2025, actual spending) |
| 129 | Wilson County, NC | 79,958 | $0 | $0.00/res. | no line matched in this budget (2025, actual spending) |
| 130 | Columbia County, PA | 66,012 | $0 | $0.00/res. | no line matched in this budget (2024, actual spending, governmental funds, not transfers only) |
| 131 | Northumberland County, PA | 90,027 | $0 | $0.00/res. | no line matched in this budget (2024, actual spending, governmental funds, not transfers only) |
| 132 | Somerset County, PA | 72,134 | $0 | $0.00/res. | no line matched in this budget (2024, actual spending, governmental funds, not transfers only) |
| 133 | Bedford County, VA | 82,182 | $0 | $0.00/res. | no line matched in this budget (2025, actual spending, day-to-day operations, including the school division only) |
| 134 | Fauquier County, VA | 75,865 | $0 | $0.00/res. | no line matched in this budget (2025, actual spending, day-to-day operations, including the school division only) |
| 135 | Montgomery County, VA | 98,998 | $0 | $0.00/res. | no line matched in this budget (2025, actual spending, day-to-day operations, including the school division only) |
| 136 | Roanoke County, VA | 97,334 | $0 | $0.00/res. | no line matched in this budget (2025, actual spending, day-to-day operations, including the school division only) |
| 137 | York County, VA | 71,410 | $0 | $0.00/res. | no line matched in this budget (2025, actual spending, day-to-day operations, including the school division only) |
Dead ends — 86 counties in this group with no figure yet (their own budgets haven’t been read): Cullman, AL, DeKalb, AL, Elmore, AL, Lauderdale, AL, Marshall, AL, St. Clair, AL, Talladega, AL, Fairbanks North Star Borough, AK, Broomfield, CO, Northeastern Connecticut Planning Region, CT, Kauai, HI, Campbell, KY, Oldham, KY, Iberia Parish, LA, Lafourche Parish, LA, St. Landry Parish, LA, Aroostook, ME, Franklin, MA, Forrest, MS, Lamar, MS, Lauderdale, MS, Lee, MS, Buchanan, MO, Cape Girardeau, MO, Christian, MO, Cole, MO, St. Francois, MO, Cascade, MT, Lewis and Clark, MT, Cheshire, NH, Grafton, NH, Cape May, NJ, Lea, NM, McKinley, NM, Otero, NM, Valencia, NM, Pender, NC, Grand Forks, ND, Ward, ND, Allen, OH, Ashtabula, OH, Columbiana, OH, Erie, OH, Geauga, OH, Hancock, OH, Muskingum, OH, Ross, OH, Scioto, OH, Tuscarawas, OH, Union, OH, Creek, OK, Muskogee, OK, Payne, OK, Pottawatomie, OK, Rogers, OK, Wagoner, OK, Benton, OR, Josephine, OR, Klamath, OR, Polk, OR, Umatilla, OR, Newport, RI, Georgetown, SC, Greenwood, SC, Kershaw, SC, Laurens, SC, Oconee, SC, Orangeburg, SC, Lincoln, SD, Angelina, TX, Bowie, TX, Coryell, TX, Harrison, TX, Henderson, TX, Hood, TX, Orange, TX, San Patricio, TX, Starr, TX, Victoria, TX, Walker, TX, Wise, TX, Iron, UT, Tooele, UT, Cabell, WV, Raleigh, WV, Wood, WV.
Who’s in the group: Counties anywhere in the U.S. within 25% of its population (2024 Census estimate), either way. If fewer than five fit, the eight closest in population. Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.