How Echols County compares · From the counties’ own budgets, line by line

Utilities (water, sewer, power, airport, port, transit): Echols County beside counties of similar size in Georgia

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Echols County: $0.00 per resident, 7th highest of 15. The middle of the group is $0.00; the middle half runs from $0.00 to $58.38 (14 counties with figures, 8 of them at $0).

#CountyResidentsPer residentAmountWhere it comes from
1Quitman County, GA2,323$310$720,160Water and Sewer System $720,160 · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
2Talbot County, GA5,755$225$1.3 millionWater and Sewer System $1.3 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
3Schley County, GA4,503$170$766,563Water and Sewer System $766,563 · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
4Webster County, GA2,315$69.21$160,220Water $80,110 · in Public Works · the state’s standard line “Water”
Water and Sewer System $80,110 · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
5Warren County, GA5,148$25.88$133,215Water and Sewer System $133,215 · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
6Randolph County, GA6,085$25.43$154,747Water $154,747 · in Public Works · the state’s standard line “Water” (2024, actual spending, operations and capital, including utility systems, not debt only)
7Baker County, GA2,732$0.00$0no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
8Calhoun County, GA5,441$0.00$0no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
9Clinch County, GA6,871$0.00$0no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
10Glascock County, GA3,008$0.00$0no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
11Miller County, GA5,824$0.00$0no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
12Stewart County, GA4,809$0.00$0no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
13Treutlen County, GA6,420$0.00$0no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
14Wheeler County, GA7,076$0.00$0no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
15Echols County, GA3,698$0.00$0no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)

Dead ends — 1 county in this group with no figure yet (their own budgets haven’t been read): Clay.

Who’s in the group: Counties in the same state with between half and double its population (2024 Census estimate). If fewer than five fit, the eight closest in population. Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.