How Fulton County compares · From the counties’ own budgets, line by line

Utilities (water, sewer, power, airport, port, transit): Fulton County beside counties of similar size in Georgia

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Fulton County: $0.00 per resident, 9th highest of 9. The middle of the group is $146; the middle half runs from $19.42 to $309 (8 counties with figures).

#CountyResidentsPer residentAmountWhere it comes from
1Gwinnett County, GA1,003,869$345$346.4 millionWater and Sewer System $343.6 million · in Utility systems · the state’s standard line “Water and Sewer System”
Airport $2.8 million · in Utility systems · the state’s standard line “Airport” (2024, actual spending, operations and capital, including utility systems, not debt only)
2Cobb County, GA787,538$323$254.7 millionWater and Sewer System $254.7 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
3Forsyth County, GA280,096$305$85.3 millionStorm Drainage $1.7 million · in Public Works · the state’s standard line “Storm Drainage”
Water $173,731 · in Public Works · the state’s standard line “Water”
Water and Sewer System $83.5 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
4DeKalb County, GA770,307$256$196.9 millionStorm Drainage $12.9 million · in Public Works · the state’s standard line “Storm Drainage”
Wastewater $1.3 million · in Public Works · the state’s standard line “Wastewater”
Water $182.8 million · in Public Works · the state’s standard line “Water” (2023, actual spending, operations and capital, including utility systems, not debt only)
5Henry County, GA259,315$36.44$9.4 millionWastewater $4.1 million · in Public Works · the state’s standard line “Wastewater”
Water and Sewer System $3.6 million · in Utility systems · the state’s standard line “Water and Sewer System”
Airport $1.8 million · in Utility systems · the state’s standard line “Airport” (2024, actual spending, operations and capital, including utility systems, not debt only)
6Chatham County, GA307,336$20.92$6.4 millionStorm Drainage $2.0 million · in Public Works · the state’s standard line “Storm Drainage”
Wastewater $193,769 · in Public Works · the state’s standard line “Wastewater”
Water $2.0 million · in Public Works · the state’s standard line “Water”
Water and Sewer System $2.3 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
7Cherokee County, GA293,513$14.93$4.4 millionStorm Drainage $4.4 million · in Public Works · the state’s standard line “Storm Drainage” (2024, actual spending, operations and capital, including utility systems, not debt only)
8Clayton County, GA297,703$2.49$741,479Cable Television $741,479 · in Public Works · the state’s standard line “Cable Television” (2024, actual spending, operations and capital, including utility systems, not debt only)
9Fulton County, GA1,090,354$0.00$0no line matched in this budget (2026, general fund only)

Who’s in the group: Counties in the same state with between half and double its population (2024 Census estimate). If fewer than five fit, the eight closest in population. Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.