How Rabun County compares · From the counties’ own budgets, line by line

Utilities (water, sewer, power, airport, port, transit): Rabun County beside neighboring counties (within 60 miles)

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Rabun County: $353 per resident, 1st highest of 21. The middle of the group is $1.61; the middle half runs from $0.00 to $16.85 (20 counties with figures, 8 of them at $0).

#CountyResidentsPer residentAmountWhere it comes from
1Rabun County, GA17,711$353$6.2 millionWater $6.2 million · in Public Works · the state’s standard line “Water” (2024, actual spending, operations and capital, including utility systems, not debt only)
2Banks County, GA20,318$128$2.6 millionWater and Sewer System $2.6 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
3Habersham County, GA49,665$65.62$3.3 millionAirport $3.3 million · in Utility systems · the state’s standard line “Airport” (2024, actual spending, operations and capital, including utility systems, not debt only)
4Hart County, GA28,052$52.15$1.5 millionWater and Sewer System $1.5 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
5Clay County, NC12,042$46.22$556,524Transit (bus, rail) $556,524 · in Other · the state’s standard line “Transit (bus, rail)” (2025, actual spending)
6Hall County, GA221,745$29.25$6.5 millionWastewater $5,500 · in Public Works · the state’s standard line “Wastewater”
Water and Sewer System $6.5 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
7Madison County, GA32,771$12.72$416,687Storm Drainage $332,966 · in Public Works · the state’s standard line “Storm Drainage”
Water $83,721 · in Public Works · the state’s standard line “Water” (2023, actual spending, operations and capital, including utility systems, not debt only)
8Macon County, NC38,717$10.94$423,663Transit (bus, rail) $423,663 · in Other · the state’s standard line “Transit (bus, rail)” (2022, actual spending)
9Haywood County, NC63,048$9.05$570,455Transit (bus, rail) $570,455 · in Other · the state’s standard line “Transit (bus, rail)” (2025, actual spending)
10Fannin County, GA25,854$3.32$85,842Water $85,842 · in Public Works · the state’s standard line “Water” (2024, actual spending, operations and capital, including utility systems, not debt only)
11Lumpkin County, GA36,016$1.65$59,571Airport $59,571 · in Utility systems · the state’s standard line “Airport” (2023, actual spending, operations and capital, including utility systems, not debt only)
12Jackson County, NC45,281$1.57$71,000Airport $71,000 · in Other · the state’s standard line “Airport” (2025, actual spending)
13Union County, GA27,601$0.00$15Water $15 · in Public Works · the state’s standard line “Water” (2023, actual spending, operations and capital, including utility systems, not debt only)
14Dawson County, GA33,748$0.00$0no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
15Jackson County, GA93,825$0.00$0no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
16Stephens County, GA27,498$0.00$0no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
17Towns County, GA13,184$0.00$0no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
18White County, GA29,668$0.00$0no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
19Graham County, NC8,179$0.00$0no line matched in this budget (2022, actual spending)
20Swain County, NC13,945$0.00$0no line matched in this budget (2024, actual spending)
21Transylvania County, NC34,103$0.00$0no line matched in this budget (2022, actual spending)

Dead ends — 6 counties in this group with no figure yet (their own budgets haven’t been read): Franklin, Cherokee, NC, Anderson, SC, Greenville, SC, Oconee, SC, Pickens, SC.

Who’s in the group: Counties whose geographic center is within 60 miles of its center, in any state (2024 Census Gazetteer). Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.