How Wheeler County compares · From the counties’ own budgets, line by line

Utilities (water, sewer, power, airport, port, transit): Wheeler County beside neighboring counties (within 60 miles)

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Wheeler County: $0, 7th highest of 27. The middle of the group is $0; the middle half runs from $0 to $0 (26 counties with figures, 20 of them at $0).

#CountyResidentsAmountPer residentWhere it comes from
1Houston County, GA174,897$14.2 million$81.17/res.Storm Drainage $1.5 million · in Public Works · the state’s standard line “Storm Drainage”
Wastewater $43,490 · in Public Works · the state’s standard line “Wastewater”
Water $2.8 million · in Public Works · the state’s standard line “Water”
Water and Sewer System $9.8 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
2Laurens County, GA50,287$933,378$18.56/res.Water and Sewer System $39,665 · in Utility systems · the state’s standard line “Water and Sewer System”
Airport $893,713 · in Utility systems · the state’s standard line “Airport” (2024, actual spending, operations and capital, including utility systems, not debt only)
3Twiggs County, GA7,728$399,780$51.73/res.Water $428 · in Public Works · the state’s standard line “Water”
Water and Sewer System $399,352 · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
4Emanuel County, GA23,224$213,489$9.19/res.Airport $213,489 · in Utility systems · the state’s standard line “Airport” (2024, actual spending, operations and capital, including utility systems, not debt only)
5Bacon County, GA11,045$165,673$15.00/res.Airport $165,673 · in Utility systems · the state’s standard line “Airport” (2024, actual spending, operations and capital, including utility systems, not debt only)
6Turner County, GA9,023$1,666$0.18/res.Water $1,666 · in Public Works · the state’s standard line “Water” (2024, actual spending, operations and capital, including utility systems, not debt only)
7Appling County, GA18,669$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
8Atkinson County, GA8,435$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
9Ben Hill County, GA16,945$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
10Bleckley County, GA12,626$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
11Candler County, GA11,130$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
12Coffee County, GA43,851$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
13Dodge County, GA19,630$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
14Evans County, GA10,869$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
15Irwin County, GA9,155$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
16Jeff Davis County, GA15,119$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
17Johnson County, GA9,178$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
18Montgomery County, GA8,566$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
19Pulaski County, GA10,180$0$0.00/res.no line matched in this budget (2023, actual spending, operations and capital, including utility systems, not debt only)
20Tattnall County, GA24,275$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
21Telfair County, GA11,000$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
22Toombs County, GA27,488$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
23Treutlen County, GA6,420$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
24Washington County, GA19,834$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
25Wilcox County, GA8,904$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
26Wilkinson County, GA8,667$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
27Wheeler County, GA7,076$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)

Who’s in the group: Counties whose geographic center is within 60 miles of its center, in any state (2024 Census Gazetteer). Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.