How White County compares · From the counties’ own budgets, line by line

Utilities (water, sewer, power, airport, port, transit): White County beside neighboring counties (within 60 miles)

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

White County: $0, 22nd highest of 29. The middle of the group is $605,577; the middle half runs from $11 to $6.3 million (28 counties with figures, 7 of them at $0).

#CountyResidentsAmountPer residentWhere it comes from
1Gwinnett County, GA1,003,869$346.4 million$345/res.Water and Sewer System $343.6 million · in Utility systems · the state’s standard line “Water and Sewer System”
Airport $2.8 million · in Utility systems · the state’s standard line “Airport” (2024, actual spending, operations and capital, including utility systems, not debt only)
2Forsyth County, GA280,096$85.3 million$305/res.Storm Drainage $1.7 million · in Public Works · the state’s standard line “Storm Drainage”
Water $173,731 · in Public Works · the state’s standard line “Water”
Water and Sewer System $83.5 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
3Clarke County, GA129,995$59.9 million$461/res.Storm Drainage $7.6 million · in Public Works · the state’s standard line “Storm Drainage”
Water and Sewer System $47.4 million · in Utility systems · the state’s standard line “Water and Sewer System”
Airport $4.9 million · in Utility systems · the state’s standard line “Airport” (2024, actual spending, operations and capital, including utility systems, not debt only)
4Walton County, GA109,792$13.2 million$120/res.Storm Drainage $507,031 · in Public Works · the state’s standard line “Storm Drainage”
Water and Sewer System $12.7 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
5Barrow County, GA96,294$10.3 million$107/res.Wastewater $58,900 · in Public Works · the state’s standard line “Wastewater”
Water $80,017 · in Public Works · the state’s standard line “Water”
Water and Sewer System $10.2 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
6Oconee County, GA44,751$9.6 million$215/res.Storm Drainage $24,972 · in Public Works · the state’s standard line “Storm Drainage”
Telecommunications (Broadband) $952,250 · in Public Works · the state’s standard line “Telecommunications (Broadband)”
Water and Sewer System $8.6 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
7Hall County, GA221,745$6.5 million$29.25/res.Wastewater $5,500 · in Public Works · the state’s standard line “Wastewater”
Water and Sewer System $6.5 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
8Rabun County, GA17,711$6.2 million$353/res.Water $6.2 million · in Public Works · the state’s standard line “Water” (2024, actual spending, operations and capital, including utility systems, not debt only)
9Cherokee County, GA293,513$4.4 million$14.93/res.Storm Drainage $4.4 million · in Public Works · the state’s standard line “Storm Drainage” (2024, actual spending, operations and capital, including utility systems, not debt only)
10Pickens County, GA36,580$4.0 million$110/res.Water and Sewer System $3.0 million · in Utility systems · the state’s standard line “Water and Sewer System”
Airport $1.1 million · in Utility systems · the state’s standard line “Airport” (2023, actual spending, operations and capital, including utility systems, not debt only)
11Habersham County, GA49,665$3.3 million$65.62/res.Airport $3.3 million · in Utility systems · the state’s standard line “Airport” (2024, actual spending, operations and capital, including utility systems, not debt only)
12Banks County, GA20,318$2.6 million$128/res.Water and Sewer System $2.6 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
13Hart County, GA28,052$1.5 million$52.15/res.Water and Sewer System $1.5 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
14Polk County, TN18,338$654,629$35.70/res.Airport $654,629 · in Other Operations · name contains “airport” (2025, actual spending, governmental funds, including schools only)
15Clay County, NC12,042$556,524$46.22/res.Transit (bus, rail) $556,524 · in Other · the state’s standard line “Transit (bus, rail)” (2025, actual spending)
16Macon County, NC38,717$423,663$10.94/res.Transit (bus, rail) $423,663 · in Other · the state’s standard line “Transit (bus, rail)” (2022, actual spending)
17Madison County, GA32,771$416,687$12.72/res.Storm Drainage $332,966 · in Public Works · the state’s standard line “Storm Drainage”
Water $83,721 · in Public Works · the state’s standard line “Water” (2023, actual spending, operations and capital, including utility systems, not debt only)
18Fannin County, GA25,854$85,842$3.32/res.Water $85,842 · in Public Works · the state’s standard line “Water” (2024, actual spending, operations and capital, including utility systems, not debt only)
19Jackson County, NC45,281$71,000$1.57/res.Airport $71,000 · in Other · the state’s standard line “Airport” (2025, actual spending)
20Lumpkin County, GA36,016$59,571$1.65/res.Airport $59,571 · in Utility systems · the state’s standard line “Airport” (2023, actual spending, operations and capital, including utility systems, not debt only)
21Union County, GA27,601$15$0.00/res.Water $15 · in Public Works · the state’s standard line “Water” (2023, actual spending, operations and capital, including utility systems, not debt only)
22Dawson County, GA33,748$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
23Gilmer County, GA33,327$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
24Jackson County, GA93,825$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
25Murray County, GA41,316$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
26Stephens County, GA27,498$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
27Towns County, GA13,184$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
28Graham County, NC8,179$0$0.00/res.no line matched in this budget (2022, actual spending)
29White County, GA29,668$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)

Dead ends — 3 counties in this group with no figure yet (their own budgets haven’t been read): Franklin, Cherokee, NC, Oconee, SC.

Who’s in the group: Counties whose geographic center is within 60 miles of its center, in any state (2024 Census Gazetteer). Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.