How Ada County compares · From the counties’ own budgets, line by line

Buildings and maintenance: Ada County beside counties of similar size in Idaho

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Ada County: $0.00 per resident, 6th highest of 8. The middle of the group is $12.90; the middle half runs from $6.36 to $15.88 (7 counties with figures, 2 of them at $0).

#CountyResidentsPer residentAmountWhere it comes from
1Twin Falls County, ID96,509$19.45$1.9 millionMaintenance $1.9 million · in Current Expense · name contains “maintenance” (2025)
2Bingham County, ID50,889$17.24$877,277Building and Grounds $877,277 · in Current Expense (General Fund) · name contains “building” (2025)
3Bonneville County, ID133,644$14.51$1.9 millionBuilding and Grounds $1.9 million · in Current Expense Fund · name contains “building” (2025)
4Bannock County, ID91,010$12.90$1.2 millionBuildings & Grounds $1.2 million · in Current Expense · name contains “buildings” (2025)
5Bonner County, ID53,955$12.71$686,016Facilities (B&G) $74,500 · in Justice Fund · name contains “facilities”
Facilities (B&G) $611,516 · in General Fund · name contains “facilities” (2025)
6Canyon County, ID266,892$0.00$0no line matched in this budget (2025)
7Kootenai County, ID188,323$0.00$0no line matched in this budget (2025)
8Ada County, ID535,799$0.00$0no line matched in this budget (2025)

Dead ends — 1 county in this group with no figure yet (their own budgets haven’t been read): Madison.

Who’s in the group: Counties in the same state with between half and double its population (2024 Census estimate). If fewer than five fit, the eight closest in population. Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.