How Clark County compares · From the counties’ own budgets, line by line

Solid waste and recycling: Clark County beside counties of similar size in Idaho

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Clark County: $80.88 per resident, 6th highest of 8. The middle of the group is $181; the middle half runs from $111 to $193 (7 counties with figures).

#CountyResidentsPer residentAmountWhere it comes from
1Bear Lake County, ID6,779$223$1.5 millionSolid Waste $1.5 million · name contains “solid waste” (2024)
2Custer County, ID4,597$201$925,500Solid Waste $925,500 · name contains “solid waste” (2025)
3Adams County, ID4,998$184$921,388Solid Waste $921,388 · name contains “solid waste” (2025)
4Oneida County, ID4,976$181$900,000Solid Waste $900,000 · name contains “solid waste” (2025)
5Lewis County, ID3,728$155$577,953Solid Waste Fee $575,753 · name contains “solid waste”
Solid Waste $2,200 · name contains “solid waste” (2025)
6Clark County, ID794$80.88$64,215Solid Waste $64,215 · name contains “solid waste” (2025)
7Lincoln County, ID5,556$66.99$372,213Solid Waste $372,213 · name contains “solid waste” (2025)
8Camas County, ID1,247$4.57$5,700Landfill $5,700 · name contains “landfill” (2025)

Dead ends — 1 county in this group with no figure yet (their own budgets haven’t been read): Butte.

Who’s in the group: Counties in the same state with between half and double its population (2024 Census estimate). If fewer than five fit, the eight closest in population. Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.