How Kootenai County compares · From the counties’ own budgets, line by line

Roads and bridges: Kootenai County beside neighboring counties (within 60 miles)

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Kootenai County: $0.00 per resident, 5th highest of 6. The middle of the group is $238; the middle half runs from $62.16 to $297 (5 counties with figures, 1 of them at $0).

#CountyResidentsPer residentAmountWhere it comes from
1Benewah County, ID10,529$433$4.6 millionGeneral Road $4.4 million · name contains “road”
Planning and Public Works $201,866 · name contains “public works” (2025)
2Shoshone County, ID14,074$297$4.2 millionRoad and Bridge $4.2 million · name contains “road” (2024)
3Bonner County, ID53,955$238$12.9 millionRoad and Bridge $12.2 million · name contains “road”
Engineering $266,440 · in General Fund · name contains “engineering”
Highway, Special State $415,000 · name contains “highway” (2025)
4Spokane County, WA555,947$62.16$34.6 millionEngineering $1,171 · in Transportation · the state’s standard line “Engineering”
Roadway $9.7 million · in Transportation · the state’s standard line “Roadway”
Drainage $43,295 · in Transportation · the state’s standard line “Drainage”
Structures $392,857 · in Transportation · the state’s standard line “Structures”
Sidewalks $9,801 · in Transportation · the state’s standard line “Sidewalks”
Street Lighting $290,351 · in Transportation · the state’s standard line “Street Lighting”
Traffic Control Devices $2.5 million · in Transportation · the state’s standard line “Traffic Control Devices”
Snow and Ice Control $3.3 million · in Transportation · the state’s standard line “Snow and Ice Control”
Street Cleaning $324,491 · in Transportation · the state’s standard line “Street Cleaning”
Roadside $863,364 · in Transportation · the state’s standard line “Roadside”
Ancillary Operations $145,821 · in Transportation · the state’s standard line “Ancillary Operations”
Maintenance Administration and Overhead $2.9 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
Management $282,466 · in Transportation · the state’s standard line “Management”
General Services $5.2 million · in Transportation · the state’s standard line “General Services”
Engineering $1.7 million · in Transportation · the state’s standard line “Engineering”
Planning $763,282 · in Transportation · the state’s standard line “Planning”
Operations Administration and Overhead $6.2 million · in Transportation · the state’s standard line “Operations Administration and Overhead” (2025, actual spending)
5Latah County, ID42,180$0.00$0no line matched in this budget (2025)
6Kootenai County, ID188,323$0.00$0no line matched in this budget (2025)

Who’s in the group: Counties whose geographic center is within 60 miles of its center, in any state (2024 Census Gazetteer). Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.