How Lewis County compares · From the counties’ own budgets, line by line

Roads and bridges: Lewis County beside neighboring counties (within 60 miles)

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Lewis County: $0, 6th highest of 7. The middle of the group is $3.4 million; the middle half runs from $2.7 million to $6.6 million (6 counties with figures, 1 of them at $0).

#CountyResidentsAmountPer residentWhere it comes from
1Idaho County, ID17,912$8.3 million$464/res.Road and Bridge $8.3 million · name contains “road” (2024)
2Nez Perce County, ID42,847$7.6 million$177/res.Road and Bridge $7.6 million · name contains “road” (2025)
3Clearwater County, ID9,151$3.6 million$388/res.Road and Bridge $3.3 million · name contains “road”
Dent Bridge Trust $267,285 · name contains “bridge” (2025)
4Asotin County, WA22,523$3.2 million$144/res.Roadway $1.4 million · in Transportation · the state’s standard line “Roadway”
Drainage $37,233 · in Transportation · the state’s standard line “Drainage”
Structures $19,576 · in Transportation · the state’s standard line “Structures”
Sidewalks $5,948 · in Transportation · the state’s standard line “Sidewalks”
Special Purpose Paths $3,748 · in Transportation · the state’s standard line “Special Purpose Paths”
Street Lighting $44,236 · in Transportation · the state’s standard line “Street Lighting”
Traffic Control Devices $258,791 · in Transportation · the state’s standard line “Traffic Control Devices”
Snow and Ice Control $125,496 · in Transportation · the state’s standard line “Snow and Ice Control”
Street Cleaning $14,031 · in Transportation · the state’s standard line “Street Cleaning”
Roadside $306,459 · in Transportation · the state’s standard line “Roadside”
Maintenance Administration and Overhead $111,516 · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
Management $90,620 · in Transportation · the state’s standard line “Management”
General Services $602,881 · in Transportation · the state’s standard line “General Services”
Facilities $13,703 · in Transportation · the state’s standard line “Facilities”
Engineering $223,082 · in Transportation · the state’s standard line “Engineering”
Planning $8,934 · in Transportation · the state’s standard line “Planning” (2025, actual spending)
5Garfield County, WA2,404$2.6 million$1,064/res.Roadway $1.2 million · in Transportation · the state’s standard line “Roadway”
Drainage $42,649 · in Transportation · the state’s standard line “Drainage”
Structures $15,397 · in Transportation · the state’s standard line “Structures”
Traffic Control Devices $126,862 · in Transportation · the state’s standard line “Traffic Control Devices”
Snow and Ice Control $120,865 · in Transportation · the state’s standard line “Snow and Ice Control”
Street Cleaning $9,977 · in Transportation · the state’s standard line “Street Cleaning”
Other Traffic and Pedestrian Services $5,517 · in Transportation · the state’s standard line “Other Traffic and Pedestrian Services”
Roadside $220,883 · in Transportation · the state’s standard line “Roadside”
Maintenance Administration and Overhead $183,868 · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
Management $201,050 · in Transportation · the state’s standard line “Management”
General Services $207,084 · in Transportation · the state’s standard line “General Services”
Operations Administration and Overhead $4,798 · in Transportation · the state’s standard line “Operations Administration and Overhead”
Roads/Streets Extraordinary Operations $212,301 · in Transportation · the state’s standard line “Roads/Streets Extraordinary Operations” (2025, actual spending)
6Latah County, ID42,180$0$0.00/res.no line matched in this budget (2025)
7Lewis County, ID3,728$0$0.00/res.no line matched in this budget (2025)

Dead ends — 1 county in this group with no figure yet (their own budgets haven’t been read): Wallowa, OR.

Who’s in the group: Counties whose geographic center is within 60 miles of its center, in any state (2024 Census Gazetteer). Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.