How Sanilac County compares · From the counties’ own budgets, line by line

Utilities (water, sewer, power, airport, port, transit): Sanilac County beside neighboring counties (within 60 miles)

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Sanilac County: $2.0 million, 2nd highest of 6. The middle of the group is $1.4 million; the middle half runs from $0 to $1.6 million (5 counties with figures, 2 of them at $0).

#CountyResidentsAmountPer residentWhere it comes from
1Huron County, MI30,780$6.3 million$204/res.Water and/or Sewer Systems $869,568 · in Public Works · the state’s standard line “Water and/or Sewer Systems”
Airports $169,485 · in Public Works · the state’s standard line “Airports”
Public Transportation $5.2 million · in Public Works · the state’s standard line “Public Transportation” (2025, actual spending)
2Sanilac County, MI40,293$2.0 million$50.48/res.Public Transportation $2.0 million · in Public Works · the state’s standard line “Public Transportation” (2025, actual spending)
3Lapeer County, MI89,168$1.6 million$18.01/res.Water and/or Sewer Systems $1.6 million · in Public Works · the state’s standard line “Water and/or Sewer Systems” (2025, actual spending)
4St. Clair County, MI160,308$1.4 million$8.52/res.Airports $1.4 million · in Public Works · the state’s standard line “Airports” (2025, actual spending)
5Macomb County, MI886,175$0$0.00/res.no line matched in this budget (2025, actual spending)
6Tuscola County, MI52,757$0$0.00/res.no line matched in this budget (2025, actual spending)

Who’s in the group: Counties whose geographic center is within 60 miles of its center, in any state (2024 Census Gazetteer). Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.