How Wadena County compares · From the counties’ own budgets, line by line

Roads and bridges: Wadena County beside neighboring counties (within 60 miles)

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Wadena County: $541 per resident, 5th highest of 9. The middle of the group is $550; the middle half runs from $494 to $573 (8 counties with figures).

#CountyResidentsPer residentAmountWhere it comes from
1Cass County, MN31,442$892$28.0 millionAdministration $1.1 million · in Streets and Highways · the state’s standard line “Administration”
Maintenance $9.2 million · in Streets and Highways · the state’s standard line “Maintenance”
Construction $17.0 million · in Streets and Highways · the state’s standard line “Construction”
All other streets and highways: buildings and equipment $805,126 · in Streets and Highways · the state’s standard line “All other streets and highways: buildings and equipment” (2024, actual spending, governmental funds, not utilities only)
2Otter Tail County, MN60,884$576$35.1 millionAdministration $936,273 · in Streets and Highways · the state’s standard line “Administration”
Maintenance $11.0 million · in Streets and Highways · the state’s standard line “Maintenance”
Construction $22.2 million · in Streets and Highways · the state’s standard line “Construction”
All other streets and highways: buildings and equipment $942,555 · in Streets and Highways · the state’s standard line “All other streets and highways: buildings and equipment” (2024, actual spending, governmental funds, not utilities only)
3Hubbard County, MN22,050$572$12.6 millionAdministration $663,441 · in Streets and Highways · the state’s standard line “Administration”
Maintenance $5.1 million · in Streets and Highways · the state’s standard line “Maintenance”
Construction $6.6 million · in Streets and Highways · the state’s standard line “Construction”
All other streets and highways: buildings and equipment $301,715 · in Streets and Highways · the state’s standard line “All other streets and highways: buildings and equipment” (2024, actual spending, governmental funds, not utilities only)
4Todd County, MN25,955$565$14.7 millionAdministration $451,322 · in Streets and Highways · the state’s standard line “Administration”
Maintenance $4.0 million · in Streets and Highways · the state’s standard line “Maintenance”
Snow and ice removal $211,919 · in Streets and Highways · the state’s standard line “Snow and ice removal”
Engineering $134,596 · in Streets and Highways · the state’s standard line “Engineering”
Construction $9.2 million · in Streets and Highways · the state’s standard line “Construction”
All other streets and highways: buildings and equipment $628,093 · in Streets and Highways · the state’s standard line “All other streets and highways: buildings and equipment” (2024, actual spending, governmental funds, not utilities only)
5Wadena County, MN14,437$541$7.8 millionAdministration $449,197 · in Streets and Highways · the state’s standard line “Administration”
Maintenance $1.9 million · in Streets and Highways · the state’s standard line “Maintenance”
Snow and ice removal $186,415 · in Streets and Highways · the state’s standard line “Snow and ice removal”
Construction $4.4 million · in Streets and Highways · the state’s standard line “Construction”
All other streets and highways: buildings and equipment $895,003 · in Streets and Highways · the state’s standard line “All other streets and highways: buildings and equipment” (2024, actual spending, governmental funds, not utilities only)
6Becker County, MN35,444$536$19.0 millionAdministration $432,943 · in Streets and Highways · the state’s standard line “Administration”
Maintenance $7.2 million · in Streets and Highways · the state’s standard line “Maintenance”
Construction $11.4 million · in Streets and Highways · the state’s standard line “Construction” (2024, actual spending, governmental funds, not utilities only)
7Morrison County, MN34,520$495$17.1 millionAdministration $362,438 · in Streets and Highways · the state’s standard line “Administration”
Maintenance $6.2 million · in Streets and Highways · the state’s standard line “Maintenance”
Construction $9.9 million · in Streets and Highways · the state’s standard line “Construction”
All other streets and highways: buildings and equipment $667,357 · in Streets and Highways · the state’s standard line “All other streets and highways: buildings and equipment” (2024, actual spending, governmental funds, not utilities only)
8Douglas County, MN39,933$489$19.5 millionAdministration $560,066 · in Streets and Highways · the state’s standard line “Administration”
Maintenance $4.6 million · in Streets and Highways · the state’s standard line “Maintenance”
Snow and ice removal $744,541 · in Streets and Highways · the state’s standard line “Snow and ice removal”
Engineering $1.0 million · in Streets and Highways · the state’s standard line “Engineering”
Construction $11.5 million · in Streets and Highways · the state’s standard line “Construction”
All other streets and highways: buildings and equipment $1.2 million · in Streets and Highways · the state’s standard line “All other streets and highways: buildings and equipment” (2024, actual spending, governmental funds, not utilities only)
9Crow Wing County, MN68,642$422$28.9 millionAdministration $656,055 · in Streets and Highways · the state’s standard line “Administration”
Maintenance $8.9 million · in Streets and Highways · the state’s standard line “Maintenance”
Construction $19.4 million · in Streets and Highways · the state’s standard line “Construction” (2024, actual spending, governmental funds, not utilities only)

Who’s in the group: Counties whose geographic center is within 60 miles of its center, in any state (2024 Census Gazetteer). Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.