How Gaston County compares · From the counties’ own budgets, line by line

Fire protection: Gaston County beside neighboring counties (within 60 miles)

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Gaston County: $52.85 per resident, 14th highest of 17. The middle of the group is $84.13; the middle half runs from $60.73 to $118 (16 counties with figures, 1 of them at $0).

#CountyResidentsPer residentAmountWhere it comes from
1Lincoln County, NC97,611$205$20.0 millionFire Protection $20.0 million · in Public Safety · the state’s standard line “Fire Protection” (2025, actual spending)
2Polk County, NC20,320$198$4.0 millionFire Protection $4.0 million · in Public Safety · the state’s standard line “Fire Protection” (2025, actual spending)
3McDowell County, NC45,269$133$6.0 millionFire Protection $6.0 million · in Public Safety · the state’s standard line “Fire Protection” (2025, actual spending)
4Rutherford County, NC65,587$122$8.0 millionFire Protection $8.0 million · in Public Safety · the state’s standard line “Fire Protection” (2025, actual spending)
5Union County, NC263,386$117$30.8 millionFire Protection $30.8 million · in Public Safety · the state’s standard line “Fire Protection” (2025, actual spending)
6Davie County, NC45,383$108$4.9 millionFire Protection $4.9 million · in Public Safety · the state’s standard line “Fire Protection” (2025, actual spending)
7Iredell County, NC206,361$90.75$18.7 millionFire Protection $18.7 million · in Public Safety · the state’s standard line “Fire Protection” (2025, actual spending)
8Catawba County, NC167,054$86.37$14.4 millionFire Protection $14.4 million · in Public Safety · the state’s standard line “Fire Protection” (2025, actual spending)
9Burke County, NC88,545$81.88$7.3 millionFire Protection $7.3 million · in Public Safety · the state’s standard line “Fire Protection” (2025, actual spending)
10Alexander County, NC36,693$74.00$2.7 millionFire Protection $2.7 million · in Public Safety · the state’s standard line “Fire Protection” (2025, actual spending)
11Rowan County, NC153,384$73.18$11.2 millionFire Protection $11.2 million · in Public Safety · the state’s standard line “Fire Protection” (2025, actual spending)
12Cleveland County, NC102,194$61.85$6.3 millionFire Protection $6.3 million · in Public Safety · the state’s standard line “Fire Protection” (2025, actual spending)
13Cabarrus County, NC244,925$57.36$14.0 millionFire Protection $14.0 million · in Public Safety · the state’s standard line “Fire Protection” (2025, actual spending)
14Gaston County, NC242,010$52.85$12.8 millionFire Protection $12.8 million · in Public Safety · the state’s standard line “Fire Protection” (2025, actual spending)
15Stanly County, NC67,326$11.76$791,888Fire Protection $791,888 · in Public Safety · the state’s standard line “Fire Protection” (2025, actual spending)
16Caldwell County, NC80,739$6.92$559,053Fire Protection $559,053 · in Public Safety · the state’s standard line “Fire Protection” (2025, actual spending)
17Mecklenburg County, NC1,206,285$0.00$0no line matched in this budget (2027)

Dead ends — 6 counties in this group with no figure yet (their own budgets haven’t been read): Cherokee, SC, Chester, SC, Lancaster, SC, Spartanburg, SC, Union, SC, York, SC.

Who’s in the group: Counties whose geographic center is within 60 miles of its center, in any state (2024 Census Gazetteer). Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.