How Gates County compares · From the counties’ own budgets, line by line

Utilities (water, sewer, power, airport, port, transit): Gates County beside counties of similar size in North Carolina

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Gates County: $0.00 per resident, 13th highest of 18. The middle of the group is $91.72; the middle half runs from $0.00 to $211 (17 counties with figures, 5 of them at $0).

#CountyResidentsPer residentAmountWhere it comes from
1Pamlico County, NC12,550$551$6.9 millionWater $6.9 million · in Other · the state’s standard line “Water” (2025, actual spending)
2Perquimans County, NC13,460$270$3.6 millionWater $2.4 million · in Other · the state’s standard line “Water”
Storm Water $1.3 million · in Other · the state’s standard line “Storm Water” (2025, actual spending)
3Warren County, NC19,081$249$4.7 millionWater $4.7 million · in Other · the state’s standard line “Water” (2025, actual spending)
4Chowan County, NC13,891$224$3.1 millionWater $1.6 million · in Other · the state’s standard line “Water”
Storm Water $1.5 million · in Other · the state’s standard line “Storm Water” (2025, actual spending)
5Hertford County, NC19,169$211$4.0 millionAirport $25,000 · in Other · the state’s standard line “Airport”
Water $2.3 million · in Other · the state’s standard line “Water”
Sewer $1.7 million · in Other · the state’s standard line “Sewer” (2025, actual spending)
6Jones County, NC9,462$180$1.7 millionWater $1.7 million · in Other · the state’s standard line “Water” (2025, actual spending)
7Washington County, NC10,654$165$1.8 millionAirport $720,975 · in Other · the state’s standard line “Airport”
Water $1.0 million · in Other · the state’s standard line “Water” (2025, actual spending)
8Camden County, NC11,184$109$1.2 millionWater $792,908 · in Other · the state’s standard line “Water”
Sewer $430,886 · in Other · the state’s standard line “Sewer” (2025, actual spending)
9Bertie County, NC16,939$91.72$1.6 millionWater $1.6 million · in Other · the state’s standard line “Water” (2022, actual spending)
10Avery County, NC17,811$77.06$1.4 millionTransit (bus, rail) $1.3 million · in Other · the state’s standard line “Transit (bus, rail)”
Airport $64,560 · in Other · the state’s standard line “Airport” (2025, actual spending)
11Clay County, NC12,042$46.22$556,524Transit (bus, rail) $556,524 · in Other · the state’s standard line “Transit (bus, rail)” (2025, actual spending)
12Yancey County, NC18,993$27.81$528,191Transit (bus, rail) $528,191 · in Other · the state’s standard line “Transit (bus, rail)” (2025, actual spending)
13Alleghany County, NC11,379$0.00$0no line matched in this budget (2025, actual spending)
14Graham County, NC8,179$0.00$0no line matched in this budget (2022, actual spending)
15Mitchell County, NC15,030$0.00$0no line matched in this budget (2025, actual spending)
16Polk County, NC20,320$0.00$0no line matched in this budget (2025, actual spending)
17Swain County, NC13,945$0.00$0no line matched in this budget (2024, actual spending)
18Gates County, NC10,299$0.00$0no line matched in this budget (2025, actual spending)

Dead ends — 1 county in this group with no figure yet (their own budgets haven’t been read): Northampton.

Who’s in the group: Counties in the same state with between half and double its population (2024 Census estimate). If fewer than five fit, the eight closest in population. Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.