How Lea County compares · From the counties’ own budgets, line by line

Roads and bridges: Lea County beside counties of similar size across the nation

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Dead end: Lea County has no figure for this yet — its own budget hasn’t been read. Ask for it. The middle of the group is $126; the middle half runs from $51.69 to $186 (135 counties with figures, 19 of them at $0).

#CountyResidentsPer residentAmountWhere it comes from
1Otter Tail County, MN60,884$576$35.1 millionAdministration $936,273 · in Streets and Highways · the state’s standard line “Administration”
Maintenance $11.0 million · in Streets and Highways · the state’s standard line “Maintenance”
Construction $22.2 million · in Streets and Highways · the state’s standard line “Construction”
All other streets and highways: buildings and equipment $942,555 · in Streets and Highways · the state’s standard line “All other streets and highways: buildings and equipment” (2024, actual spending, governmental funds, not utilities only)
2Tehama County, CA64,451$514$33.1 millionRoads $33.1 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Roads” (2025, actual spending)
3Sullivan County, NY80,450$502$40.4 millionPublic Works Administration $799,672 · in General Government · name contains “public works”
Other Transportation $13.6 million · in Transportation · name contains “transportation”
Maintenance of Roads $14.7 million · in Transportation · name contains “roads”
Machinery $5.4 million · in Transportation · the state’s standard line “Machinery”
Snow Removal $2.3 million · in Transportation · the state’s standard line “Snow Removal”
Transportation, Other $2.2 million · in Transportation · name contains “transportation”
Engineering $1.4 million · in Transportation · name contains “engineering” (2024, actual spending)
4Blue Earth County, MN70,700$500$35.4 millionAdministration $407,228 · in Streets and Highways · the state’s standard line “Administration”
Maintenance $32.9 million · in Streets and Highways · the state’s standard line “Maintenance”
Construction $2.1 million · in Streets and Highways · the state’s standard line “Construction” (2024, actual spending, governmental funds, not utilities only)
5Walton County, FL89,666$425$38.1 millionRoad and Street Facilities $38.1 million · in Transportation · the state’s standard line “Road and Street Facilities” (2025, actual spending, governmental and business funds, including transfers only)
6Crow Wing County, MN68,642$422$28.9 millionAdministration $656,055 · in Streets and Highways · the state’s standard line “Administration”
Maintenance $8.9 million · in Streets and Highways · the state’s standard line “Maintenance”
Construction $19.4 million · in Streets and Highways · the state’s standard line “Construction” (2024, actual spending, governmental funds, not utilities only)
7Columbia County, FL73,977$395$29.2 millionRoad and Street Facilities $29.2 million · in Transportation · the state’s standard line “Road and Street Facilities” (2024, actual spending, governmental and business funds, including transfers only)
8Kosciusko County, IN80,669$377$30.4 millionHighway $8.3 million · in Roads and bridges · name contains “highway”
Bridge #139 $5.4 million · in Roads and bridges · name contains “bridge”
Bridge #9 $4.2 million · in Roads and bridges · name contains “bridge”
Highway Bridge #123 $2.5 million · in Roads and bridges · name contains “highway”
Bridge #227 $1.9 million · in Roads and bridges · name contains “bridge”
Bridge #30 $1.9 million · in Roads and bridges · name contains “bridge”
Cumulative Bridge $1.5 million · in Roads and bridges · name contains “bridge”
Local Road & Street $1.5 million · in Roads and bridges · name contains “road”
Bridge#161 $1.4 million · in Roads and bridges · name contains “bridge”
Local Trax Rail-1300N ROAD $1.1 million · in Roads and bridges · name contains “road”
Local Trax Rail - 1300 N BRIDGE $435,560 · in Roads and bridges · name contains “bridge”
Bridge Inspection 2022-2025 $248,679 · in Roads and bridges · name contains “bridge” (2026, all county funds, as adopted (before state review) only)
9Steuben County, NY92,015$334$30.8 millionMaintenance of Roads $13.9 million · in Transportation · name contains “roads”
Maintenance of Bridges $5.6 million · in Transportation · name contains “bridges”
Machinery $6.9 million · in Transportation · the state’s standard line “Machinery”
Snow Removal $3.1 million · in Transportation · the state’s standard line “Snow Removal”
Highway and Street Administration $934,563 · in Transportation · name contains “highway”
Engineering $381,728 · in Transportation · name contains “engineering” (2024, actual spending)
10Lewis County, WA87,049$326$28.4 millionEngineering $224,758 · in Transportation · the state’s standard line “Engineering”
Roadway $5.3 million · in Transportation · the state’s standard line “Roadway”
Drainage $5.1 million · in Transportation · the state’s standard line “Drainage”
Structures $2.4 million · in Transportation · the state’s standard line “Structures”
Street Lighting $23,080 · in Transportation · the state’s standard line “Street Lighting”
Traffic Control Devices $1.1 million · in Transportation · the state’s standard line “Traffic Control Devices”
Snow and Ice Control $367,199 · in Transportation · the state’s standard line “Snow and Ice Control”
Street Cleaning $32,845 · in Transportation · the state’s standard line “Street Cleaning”
Other Traffic and Pedestrian Services $219 · in Transportation · the state’s standard line “Other Traffic and Pedestrian Services”
Roadside $1.4 million · in Transportation · the state’s standard line “Roadside”
Ancillary Operations $839,174 · in Transportation · the state’s standard line “Ancillary Operations”
Maintenance Administration and Overhead $6.8 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
Management $2.1 million · in Transportation · the state’s standard line “Management”
Engineering $1.5 million · in Transportation · the state’s standard line “Engineering”
Planning $1.2 million · in Transportation · the state’s standard line “Planning”
Operations Administration and Overhead $119,487 · in Transportation · the state’s standard line “Operations Administration and Overhead” (2025, actual spending)
11Clinton County, MI80,050$316$25.3 millionPublic Works (Non-Act 51) $1.9 million · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $23.4 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
12Lake County, CA67,764$302$20.5 millionRoads $6.6 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Roads”
Other Public Ways and Facilities $13.8 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Other Public Ways and Facilities” (2025, actual spending)
13Rice County, MN69,025$296$20.4 millionAdministration $459,745 · in Streets and Highways · the state’s standard line “Administration”
Maintenance $5.8 million · in Streets and Highways · the state’s standard line “Maintenance”
Construction $12.8 million · in Streets and Highways · the state’s standard line “Construction”
All other streets and highways: buildings and equipment $1.4 million · in Streets and Highways · the state’s standard line “All other streets and highways: buildings and equipment” (2024, actual spending, governmental funds, not utilities only)
14Monroe County, FL80,908$288$23.3 millionRoad and Street Facilities $19.2 million · in Transportation · the state’s standard line “Road and Street Facilities”
Other Transportation Systems / Services $4.1 million · in Transportation · the state’s standard line “Other Transportation Systems / Services” (2025, actual spending, governmental and business funds, including transfers only)
15Montcalm County, MI69,314$278$19.3 millionPublic Works (Non-Act 51) $1.7 million · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $17.6 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
16Mendocino County, CA89,175$275$24.5 millionRoads $24.2 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Roads”
Other Public Ways and Facilities $339,143 · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Other Public Ways and Facilities” (2025, actual spending)
17Lonoke County, AR76,389$263$20.1 millionRoad and Bridge $20.1 million · name contains “road” (2026)
18Shiawassee County, MI67,982$260$17.7 millionPublic Works (Non-Act 51) $657,148 · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $17.0 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
19Clay County, MN66,848$257$17.2 millionAdministration $700,328 · in Streets and Highways · the state’s standard line “Administration”
Maintenance $7.8 million · in Streets and Highways · the state’s standard line “Maintenance”
Construction $8.7 million · in Streets and Highways · the state’s standard line “Construction” (2024, actual spending, governmental funds, not utilities only)
20Yuba County, CA87,469$250$21.8 millionRoads $21.8 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Roads” (2025, actual spending)
21Ionia County, MI66,250$249$16.5 millionRoad Commission/Street Dept. (Act 51) $16.5 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
22Lynchburg city, VA80,301$228$18.3 millionMaintenance of Highways, Streets, Bridges, and Sidewalks $18.3 million · in Public Works · the state’s standard line “Maintenance of Highways, Streets, Bridges, and Sidewalks” (2025, actual spending, day-to-day operations, including the school division only)
23Chippewa County, WI67,323$228$15.3 millionHighway Maintenance and Administration $6.3 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $8.2 million · in Transportation · the state’s standard line “Highway Construction”
Road-Related Facilities $654,741 · in Transportation · the state’s standard line “Road-Related Facilities”
Other Transportation $132,890 · in Transportation · the state’s standard line “Other Transportation” (2024, actual spending, governmental funds, including transfers only)
24Allegany County, MD67,097$222$14.9 millionTransportation $14.9 million · in Public Works · the state’s standard line “Transportation” (2024, actual spending, county government, including transfers to school and other boards only)
25Pottawattamie County, IA93,529$220$20.6 millionRoads & Transportation $20.6 million · in Roads & Transportation · the state’s standard line “Roads & Transportation” (2027)
26Columbia County, NY60,299$215$13.0 millionPublic Works Administration $2.0 million · in General Government · name contains “public works”
Engineer $389,865 · in General Government · name contains “engineer”
Maintenance of Roads $6.2 million · in Transportation · name contains “roads”
Machinery $2.9 million · in Transportation · the state’s standard line “Machinery”
Snow Removal $1.2 million · in Transportation · the state’s standard line “Snow Removal”
Highway and Street Administration $211,920 · in Transportation · name contains “highway”
Street Cleaning $945 · in Transportation · name contains “street”
Water Transportation and Distribution $29,909 · in Utilities · name contains “transportation” (2024, actual spending)
27St. Joseph County, MI61,171$213$13.0 millionPublic Works (Non-Act 51) $5,687 · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $13.0 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
28Cattaraugus County, NY75,475$210$15.9 millionPublic Works Administration $350,623 · in General Government · name contains “public works”
Maintenance of Roads $7.3 million · in Transportation · name contains “roads”
Machinery $4.0 million · in Transportation · the state’s standard line “Machinery”
Snow Removal $3.0 million · in Transportation · the state’s standard line “Snow Removal”
Engineering $546,775 · in Transportation · name contains “engineering”
Maintenance of Bridges $318,631 · in Transportation · name contains “bridges”
Highway and Street Administration $364,594 · in Transportation · name contains “highway” (2024, actual spending)
29Lapeer County, MI89,168$207$18.4 millionPublic Works (Non-Act 51) $637,839 · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $17.8 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
30Midland County, MI84,022$201$16.9 millionPublic Works (Non-Act 51) $3.1 million · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $13.7 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
31Butler County, KS69,158$198$13.7 millionRoad & Bridge (0041) $13.6 million · in Roads and bridges · name contains “road”
Bridge Building (0042) $91,310 · in Roads and bridges · name contains “bridge”
Street Lighting (0074) $7,010 · in Roads and bridges · name contains “street” (2026, all budgeted funds, spending authority only)
32Walker County, GA69,340$194$13.4 millionPublic Works Administration $12,277 · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $13.4 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
33Dodge County, WI88,635$193$17.1 millionHighway Maintenance and Administration $7.9 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $9.2 million · in Transportation · the state’s standard line “Highway Construction”
Other Transportation $30,000 · in Transportation · the state’s standard line “Other Transportation” (2024, actual spending, governmental funds, including transfers only)
34Barry County, MI64,025$187$12.0 millionRoad Commission/Street Dept. (Act 51) $12.0 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
35Putnam County, FL77,301$185$14.3 millionRoad and Street Facilities $14.3 million · in Transportation · the state’s standard line “Road and Street Facilities” (2025, actual spending, governmental and business funds, including transfers only)
36Leavenworth County, KS84,670$183$15.5 millionRoad & Bridge $15.5 million · in Roads and bridges · name contains “road” (2026, all budgeted funds, spending authority only)
37Riley County, KS72,557$179$13.0 millionRoad & Bridge 1/2 Cent Sales Tax - 157 $4.7 million · in Roads and bridges · name contains “road”
Road & Bridge 0.2 Cent Sales Tax - Fund $8.3 million · in Roads and bridges · name contains “road” (2026, all budgeted funds, spending authority only)
38Reno County, KS61,417$175$10.7 millionRoad & Bridge Fund 007 $7.3 million · in Roads and bridges · name contains “road”
Special Road Fund 094 $642,915 · in Roads and bridges · name contains “road”
Special Bridge Fund 006 $2.8 million · in Roads and bridges · name contains “bridge” (2026, all budgeted funds, spending authority only)
39Wood County, WI73,943$172$12.7 millionHighway Maintenance and Administration $7.8 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $4.0 million · in Transportation · the state’s standard line “Highway Construction”
Road-Related Facilities $962,160 · in Transportation · the state’s standard line “Road-Related Facilities” (2024, actual spending, governmental funds, including transfers only)
40Mason County, WA69,632$171$11.9 millionEngineering $8.0 million · in Transportation · the state’s standard line “Engineering”
Management $2.5 million · in Transportation · the state’s standard line “Management”
Engineering $1.4 million · in Transportation · the state’s standard line “Engineering” (2025, actual spending)
41Grays Harbor County, WA77,893$171$13.3 millionRoadway $4.0 million · in Transportation · the state’s standard line “Roadway”
Drainage $428,011 · in Transportation · the state’s standard line “Drainage”
Structures $74,645 · in Transportation · the state’s standard line “Structures”
Traffic Control Devices $1.0 million · in Transportation · the state’s standard line “Traffic Control Devices”
Snow and Ice Control $578,295 · in Transportation · the state’s standard line “Snow and Ice Control”
Street Cleaning $199,837 · in Transportation · the state’s standard line “Street Cleaning”
Roadside $1.6 million · in Transportation · the state’s standard line “Roadside”
Ancillary Operations $814,562 · in Transportation · the state’s standard line “Ancillary Operations”
Maintenance Administration and Overhead $2.5 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
General Services $653,585 · in Transportation · the state’s standard line “General Services”
Engineering $966,953 · in Transportation · the state’s standard line “Engineering”
Planning $20,643 · in Transportation · the state’s standard line “Planning”
Operations Administration and Overhead $420,107 · in Transportation · the state’s standard line “Operations Administration and Overhead”
Roads/Streets Extraordinary Operations $63,572 · in Transportation · the state’s standard line “Roads/Streets Extraordinary Operations” (2025, actual spending)
42Madison County, NY67,072$170$11.4 millionMaintenance of Roads $5.5 million · in Transportation · name contains “roads”
Snow Removal $1.4 million · in Transportation · the state’s standard line “Snow Removal”
Machinery $2.9 million · in Transportation · the state’s standard line “Machinery”
Transportation, Other $629,404 · in Transportation · name contains “transportation”
Highway and Street Administration $409,491 · in Transportation · name contains “highway”
Snow Removal, State $282,146 · in Transportation · the state’s standard line “Snow Removal, State”
Engineering $181,808 · in Transportation · name contains “engineering”
Water Transportation and Distribution $18,227 · in Utilities · name contains “transportation” (2024, actual spending)
43Wayne County, IN66,410$170$11.3 millionHighway $6.0 million · in Roads and bridges · name contains “highway”
Cumulative Bridge $4.5 million · in Roads and bridges · name contains “bridge”
Local Road & Street $767,501 · in Roads and bridges · name contains “road” (2026, all county funds, as adopted (before state review) only)
44Otsego County, NY60,524$168$10.2 millionMaintenance of Roads $3.8 million · in Transportation · name contains “roads”
Machinery $3.7 million · in Transportation · the state’s standard line “Machinery”
Snow Removal $2.1 million · in Transportation · the state’s standard line “Snow Removal”
Highway and Street Administration $467,577 · in Transportation · name contains “highway” (2024, actual spending)
45Clallam County, WA77,958$167$13.1 millionRoadway $3.1 million · in Transportation · the state’s standard line “Roadway”
Drainage $447,468 · in Transportation · the state’s standard line “Drainage”
Structures $160,363 · in Transportation · the state’s standard line “Structures”
Other Traffic and Pedestrian Services $1.8 million · in Transportation · the state’s standard line “Other Traffic and Pedestrian Services”
Roadside $1.2 million · in Transportation · the state’s standard line “Roadside”
Maintenance Administration and Overhead $1.7 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
Management $67,986 · in Transportation · the state’s standard line “Management”
General Services $2.5 million · in Transportation · the state’s standard line “General Services”
Facilities $181,840 · in Transportation · the state’s standard line “Facilities”
Engineering $542,437 · in Transportation · the state’s standard line “Engineering”
Planning $118,463 · in Transportation · the state’s standard line “Planning”
Operations Administration and Overhead $1.3 million · in Transportation · the state’s standard line “Operations Administration and Overhead” (2025, actual spending)
46Portage County, WI72,040$167$12.0 millionHighway Maintenance and Administration $8.5 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $2.9 million · in Transportation · the state’s standard line “Highway Construction”
Road-Related Facilities $106,096 · in Transportation · the state’s standard line “Road-Related Facilities”
Other Transportation $508,480 · in Transportation · the state’s standard line “Other Transportation” (2024, actual spending, governmental funds, including transfers only)
47Walla Walla County, WA62,068$164$10.2 millionRoadway $4.6 million · in Transportation · the state’s standard line “Roadway”
Drainage $589,827 · in Transportation · the state’s standard line “Drainage”
Structures $15,215 · in Transportation · the state’s standard line “Structures”
Street Lighting $5,364 · in Transportation · the state’s standard line “Street Lighting”
Traffic Control Devices $359,618 · in Transportation · the state’s standard line “Traffic Control Devices”
Snow and Ice Control $348,836 · in Transportation · the state’s standard line “Snow and Ice Control”
Street Cleaning $43,516 · in Transportation · the state’s standard line “Street Cleaning”
Roadside $629,748 · in Transportation · the state’s standard line “Roadside”
Maintenance Administration and Overhead $555,686 · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
Management $335,767 · in Transportation · the state’s standard line “Management”
General Services $1.8 million · in Transportation · the state’s standard line “General Services”
Facilities $314,471 · in Transportation · the state’s standard line “Facilities”
Engineering $207,593 · in Transportation · the state’s standard line “Engineering”
Planning $213,340 · in Transportation · the state’s standard line “Planning”
Operations Administration and Overhead $133,312 · in Transportation · the state’s standard line “Operations Administration and Overhead” (2025, actual spending)
48Island County, WA86,478$163$14.1 millionRoadway $2.5 million · in Transportation · the state’s standard line “Roadway”
Drainage $752,403 · in Transportation · the state’s standard line “Drainage”
Sidewalks $242 · in Transportation · the state’s standard line “Sidewalks”
Special Purpose Paths $9,442 · in Transportation · the state’s standard line “Special Purpose Paths”
Street Lighting $23,180 · in Transportation · the state’s standard line “Street Lighting”
Traffic Control Devices $1.3 million · in Transportation · the state’s standard line “Traffic Control Devices”
Parking Facilities $1,559 · in Transportation · the state’s standard line “Parking Facilities”
Snow and Ice Control $231,540 · in Transportation · the state’s standard line “Snow and Ice Control”
Street Cleaning $467,592 · in Transportation · the state’s standard line “Street Cleaning”
Roadside $1.1 million · in Transportation · the state’s standard line “Roadside”
Ancillary Operations $4,430 · in Transportation · the state’s standard line “Ancillary Operations”
Maintenance Administration and Overhead $343,931 · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
Management $810,967 · in Transportation · the state’s standard line “Management”
General Services $1.3 million · in Transportation · the state’s standard line “General Services”
Facilities $17,189 · in Transportation · the state’s standard line “Facilities”
Engineering $1.1 million · in Transportation · the state’s standard line “Engineering”
Planning $601,904 · in Transportation · the state’s standard line “Planning”
Operations Administration and Overhead $3.5 million · in Transportation · the state’s standard line “Operations Administration and Overhead” (2025, actual spending)
49Hancock County, IN88,810$162$14.4 millionHighway $11.8 million · in Roads and bridges · name contains “highway”
Cumulative Bridge $2.1 million · in Roads and bridges · name contains “bridge”
Local Road & Street $495,000 · in Roads and bridges · name contains “road” (2026, all county funds, as adopted (before state review) only)
50Effingham County, GA73,148$162$11.8 millionRoads, Streets, and Bridges $11.8 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
51Van Buren County, MI76,129$160$12.2 millionPublic Works (Non-Act 51) $511,544 · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $11.7 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
52Spalding County, GA70,292$154$10.8 millionPublic Works Administration $195,998 · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $10.6 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
53Warren County, NY65,288$154$10.0 millionPublic Works Facility Site Improvements $107,560 · in Economic Development · name contains “public works”
Public Works Administration $475,159 · in General Government · name contains “public works”
Snow Removal $2.2 million · in Transportation · the state’s standard line “Snow Removal”
Maintenance of Roads $3.1 million · in Transportation · name contains “roads”
Other Transportation $1.5 million · in Transportation · name contains “transportation”
Machinery $2.5 million · in Transportation · the state’s standard line “Machinery”
Engineering $276,706 · in Transportation · name contains “engineering” (2024, actual spending)
54Chelan County, WA81,228$153$12.4 millionRoadway $3.8 million · in Transportation · the state’s standard line “Roadway”
Drainage $401,713 · in Transportation · the state’s standard line “Drainage”
Structures $54,473 · in Transportation · the state’s standard line “Structures”
Sidewalks $3,203 · in Transportation · the state’s standard line “Sidewalks”
Special Purpose Paths $218 · in Transportation · the state’s standard line “Special Purpose Paths”
Street Lighting $19,775 · in Transportation · the state’s standard line “Street Lighting”
Traffic Control Devices $623,827 · in Transportation · the state’s standard line “Traffic Control Devices”
Snow and Ice Control $2.1 million · in Transportation · the state’s standard line “Snow and Ice Control”
Street Cleaning $263,457 · in Transportation · the state’s standard line “Street Cleaning”
Roadside $539,548 · in Transportation · the state’s standard line “Roadside”
Maintenance Administration and Overhead $1.3 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
Management $222,701 · in Transportation · the state’s standard line “Management”
General Services $1.3 million · in Transportation · the state’s standard line “General Services”
Facilities $179,094 · in Transportation · the state’s standard line “Facilities”
Engineering $1.5 million · in Transportation · the state’s standard line “Engineering”
Roads/Streets Extraordinary Operations $134,429 · in Transportation · the state’s standard line “Roads/Streets Extraordinary Operations” (2023, actual spending)
55White County, AR79,091$151$11.9 millionCounty General Road Fund $1.1 million · in County General Fund · name contains “road”
County Road Fund $10.1 million · name contains “road”
Additional Motor Fuel Tax Fund $358,971 · name contains “motor fuel”
Road Department $300,000 · in Capital Improvement Fund · name contains “road” (2026)
56Warrick County, IN66,339$150$10.0 millionHighway $4.5 million · in Roads and bridges · name contains “highway”
LIT Road Fund $3.7 million · in Roads and bridges · name contains “road”
Local Road & Street $1.4 million · in Roads and bridges · name contains “road”
Cumulative Bridge $296,661 · in Roads and bridges · name contains “bridge” (2026, all county funds, as adopted (before state review) only)
57Tipton County, TN62,187$145$9.0 millionLitter and Trash Collection $1.5 million · in Highways · the state’s standard line “Litter and Trash Collection”
Administration $742,355 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $3.5 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $725,304 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $825,309 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $1.7 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
58Manitowoc County, WI81,513$141$11.5 millionHighway Maintenance and Administration −$2.2 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $13.2 million · in Transportation · the state’s standard line “Highway Construction”
Road-Related Facilities $113,914 · in Transportation · the state’s standard line “Road-Related Facilities”
Other Transportation $425,006 · in Transportation · the state’s standard line “Other Transportation” (2024, actual spending, governmental funds, including transfers only)
59Liberty County, GA68,607$139$9.5 millionGeneral Engineering $117,031 · in General Government · the state’s standard line “General Engineering”
Roads, Streets, and Bridges $9.4 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
60Marquette County, MI67,979$138$9.4 millionPublic Works (Non-Act 51) $56,125 · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $9.4 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
61Isabella County, MI65,072$136$8.9 millionPublic Works (Non-Act 51) $387,974 · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $8.5 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
62Hall County, NE62,869$132$8.3 millionPublic Works - Highways & Roads $8.3 million · in Public Works · the state’s standard line “Public Works - Highways & Roads” (2026)
63Pope County, AR64,829$131$8.5 millionRoad Fund $8.3 million · name contains “road”
Additional Motor Fuel Tax Fund $260,000 · name contains “motor fuel” (2026)
64Morgan County, IN73,825$131$9.7 millionHighway $8.4 million · in Roads and bridges · name contains “highway”
Local Road & Street $1.3 million · in Roads and bridges · name contains “road” (2026, all county funds, as adopted (before state review) only)
65Cumberland County, TN65,618$129$8.5 millionEngineering $250,301 · in General Government · name contains “engineering”
Litter and Trash Collection $118,985 · in Highways · the state’s standard line “Litter and Trash Collection”
Capital Outlay $4.6 million · in Highways · the state’s standard line “Capital Outlay”
Administration $271,604 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $2.8 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $368,848 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $113,380 · in Highways · the state’s standard line “Other Charges” (2025, actual spending, governmental funds, including schools only)
66Livingston County, NY61,561$129$7.9 millionMaintenance of Roads $2.9 million · in Transportation · name contains “roads”
Machinery $2.1 million · in Transportation · the state’s standard line “Machinery”
Snow Removal $1.2 million · in Transportation · the state’s standard line “Snow Removal”
Snow Removal, State $837,552 · in Transportation · the state’s standard line “Snow Removal, State”
Highway and Street Administration $716,381 · in Transportation · name contains “highway”
Engineering $165,899 · in Transportation · name contains “engineering”
Transportation, Other $35,186 · in Transportation · name contains “transportation” (2024, actual spending)
67Crawford County, AR62,258$126$7.8 millionCounty Highway $7.7 million · in Highway Fund · name contains “highway”
Additional Motor Fuel Tax Act 416 of 2019 $100,000 · name contains “motor fuel” (2026)
68Sauk County, WI66,486$126$8.4 millionHighway Maintenance and Administration $6.8 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $1.4 million · in Transportation · the state’s standard line “Highway Construction”
Other Transportation $200,867 · in Transportation · the state’s standard line “Other Transportation” (2024, actual spending, governmental funds, including transfers only)
69Cayuga County, NY74,567$125$9.4 millionMaintenance of Roads $4.0 million · in Transportation · name contains “roads”
Snow Removal $1.8 million · in Transportation · the state’s standard line “Snow Removal”
Machinery $2.6 million · in Transportation · the state’s standard line “Machinery”
Snow Removal, State $516,599 · in Transportation · the state’s standard line “Snow Removal, State”
Highway and Street Administration $354,751 · in Transportation · name contains “highway”
Maintenance of Bridges $67,564 · in Transportation · name contains “bridges”
Highway Services for Other Governments $61,611 · in Transportation · name contains “highway” (2024, actual spending)
70Greene County, TN73,398$124$9.1 millionAdministration $294,927 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $5.6 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $1.2 million · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Asphalt Plant Operations $1.3 million · in Highways · the state’s standard line “Asphalt Plant Operations”
Other Charges $102,108 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $563,719 · in Highways · the state’s standard line “Capital Outlay”
Public Transportation $24,916 · in Other Operations · name contains “transportation” (2025, actual spending, governmental funds, including schools only)
71Gordon County, GA60,765$118$7.2 millionPublic Works Administration $3.6 million · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $3.6 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
72Boone County, IN78,773$116$9.1 millionHighway $5.6 million · in Roads and bridges · name contains “highway”
Cumulative Bridge $2.9 million · in Roads and bridges · name contains “bridge”
Local Road & Street $720,000 · in Roads and bridges · name contains “road” (2026, all county funds, as adopted (before state review) only)
73Troup County, GA71,513$115$8.3 millionRoads, Streets, and Bridges $8.3 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
74Bulloch County, GA85,454$110$9.4 millionGeneral Engineering $265,161 · in General Government · the state’s standard line “General Engineering”
Roads, Streets, and Bridges $9.1 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
75Putnam County, TN84,894$105$8.9 millionAdministration $1.1 million · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $5.0 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $561,572 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $343,022 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $2.0 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
76Jefferson County, WI86,245$104$8.9 millionHighway Maintenance and Administration $3.7 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $4.8 million · in Transportation · the state’s standard line “Highway Construction”
Road-Related Facilities $383,818 · in Transportation · the state’s standard line “Road-Related Facilities” (2024, actual spending, governmental funds, including transfers only)
77Bannock County, ID91,010$103$9.4 millionRoad & Bridge $9.4 million · in Road and Bridge · name contains “road”
Engineer $0 · in Road and Bridge · name contains “engineer” (2025)
78Clinton County, NY77,871$101$7.9 millionSnow Removal $2.5 million · in Transportation · the state’s standard line “Snow Removal”
Maintenance of Roads $2.7 million · in Transportation · name contains “roads”
Machinery $2.3 million · in Transportation · the state’s standard line “Machinery”
Highway and Street Administration $326,303 · in Transportation · name contains “highway”
Engineering $132,959 · in Transportation · name contains “engineering”
Maintenance of Bridges $18,876 · in Transportation · name contains “bridges” (2024, actual spending)
79Adams County, IL64,109$96.91$6.2 millionStreets and Highways $5.9 million · in Transportation and Public Works · the state’s standard line “Streets and Highways”
Other transportation and public works $313,271 · in Transportation and Public Works · the state’s standard line “Other transportation and public works” (2025, actual spending, governmental funds and county-run businesses only)
80Grant County, IN66,458$94.21$6.3 millionHighway $4.5 million · in Roads and bridges · name contains “highway”
Cumulative Bridge $1.2 million · in Roads and bridges · name contains “bridge”
Local Road & Street $600,000 · in Roads and bridges · name contains “road” (2026, all county funds, as adopted (before state review) only)
81Jefferson County, AR63,672$93.42$5.9 millionRoad Department $5.9 million · name contains “road” (2026)
82Bartholomew County, IN84,741$91.77$7.8 millionHighway $5.0 million · in Roads and bridges · name contains “highway”
Cumulative Bridge $1.8 million · in Roads and bridges · name contains “bridge”
Local Road & Street $995,000 · in Roads and bridges · name contains “road” (2026, all county funds, as adopted (before state review) only)
83Williamson County, IL67,064$87.00$5.8 millionStreets and Highways $5.8 million · in Transportation and Public Works · the state’s standard line “Streets and Highways” (2024, actual spending, governmental funds and county-run businesses only)
84Pulaski County, KY66,842$87.00$5.8 millionRoad Fund $5.8 million · in Roads · the state’s standard line “Road Fund” (2024, all budgeted funds, final (amended) budget only)
85Catoosa County, GA68,940$85.57$5.9 millionGeneral Engineering $34,072 · in General Government · the state’s standard line “General Engineering”
Public Works Administration $298,331 · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $5.6 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
86Chemung County, NY81,115$82.78$6.7 millionMaintenance of Roads $4.9 million · in Transportation · name contains “roads”
Machinery $1.2 million · in Transportation · the state’s standard line “Machinery”
Highway and Street Administration $464,383 · in Transportation · name contains “highway”
Engineering $168,967 · in Transportation · name contains “engineering” (2024, actual spending)
87Wayne County, NY90,757$82.72$7.5 millionMaintenance of Roads $3.7 million · in Transportation · name contains “roads”
Snow Removal $1.5 million · in Transportation · the state’s standard line “Snow Removal”
Machinery $1.8 million · in Transportation · the state’s standard line “Machinery”
Highway and Street Administration $277,371 · in Transportation · name contains “highway”
Engineering $209,672 · in Transportation · name contains “engineering” (2024, actual spending)
88Robertson County, TN78,459$82.64$6.5 millionEngineering $213,079 · in General Government · name contains “engineering”
Administration $431,399 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $3.1 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $447,065 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $461,473 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $1.9 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
89San Benito County, CA69,159$78.96$5.5 millionRoads $3.9 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Roads”
Other Public Ways and Facilities $1.5 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Other Public Ways and Facilities” (2025, actual spending)
90Howard County, IN84,082$78.27$6.6 millionHighway $4.9 million · in Roads and bridges · name contains “highway”
Cumulative Bridge $890,000 · in Roads and bridges · name contains “bridge”
Local Road & Street $794,000 · in Roads and bridges · name contains “road” (2026, all county funds, as adopted (before state review) only)
91Natrona County, WY80,410$75.97$6.1 millionRoad and bridge $3.1 million · in Roads and bridges · name contains “road”
Road and bridge (construction) $1.3 million · in Roads and bridges · name contains “road”
Road and bridge (equipment, land and buildings) $1.7 million · in Roads and bridges · name contains “road” (2025, actual spending, all county funds, not separate boards only)
92Christian County, KY71,006$72.19$5.1 millionRoad Fund $4.7 million · in Roads · the state’s standard line “Road Fund”
Local Government Economic Assistance Fund $415,000 · in Roads · the state’s standard line “Local Government Economic Assistance Fund” (2025, all budgeted funds, final (amended) budget only)
93Laurel County, KY63,353$69.99$4.4 millionRoad Fund $4.4 million · in Roads · the state’s standard line “Road Fund”
Local Government Economic Assistance Fund $57,000 · in Roads · the state’s standard line “Local Government Economic Assistance Fund” (2021, all budgeted funds, final (amended) budget only)
94Anderson County, TN81,449$66.30$5.4 millionAdministration $294,945 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $3.0 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $767,408 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $264,587 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $1.1 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
95Coffee County, TN61,285$60.05$3.7 millionAdministration $302,961 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $2.4 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $418,416 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $288,884 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $228,693 · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
96Bullitt County, KY85,802$59.12$5.1 millionRoad Fund $4.1 million · in Roads · the state’s standard line “Road Fund”
Local Government Economic Assistance Fund $980,645 · in Roads · the state’s standard line “Local Government Economic Assistance Fund” (2025, all budgeted funds, final (amended) budget only)
97Floyd County, IN81,931$58.69$4.8 millionHighway $3.1 million · in Roads and bridges · name contains “highway”
Local Road & Street $970,000 · in Roads and bridges · name contains “road”
Cumulative Bridge $776,650 · in Roads and bridges · name contains “bridge” (2026, all county funds, as adopted (before state review) only)
98Glynn County, GA86,540$56.30$4.9 millionGeneral Engineering $1.0 million · in General Government · the state’s standard line “General Engineering”
Public Works Administration $2.0 million · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $1.8 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
99McCracken County, KY67,550$54.57$3.7 millionRoad Fund $3.7 million · in Roads · the state’s standard line “Road Fund” (2023, all budgeted funds, final (amended) budget only)
100Loudon County, TN62,129$54.30$3.4 millionAdministration $1.2 million · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $955,584 · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $352,574 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $224,019 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $602,531 · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
101Scott County, KY61,700$52.21$3.2 millionRoad Fund $3.0 million · in Roads · the state’s standard line “Road Fund”
Local Government Economic Assistance Fund $200,000 · in Roads · the state’s standard line “Local Government Economic Assistance Fund” (2022, all budgeted funds, final (amended) budget only)
102Vermilion County, IL71,106$51.17$3.6 millionStreets and Highways $3.6 million · in Transportation and Public Works · the state’s standard line “Streets and Highways” (2025, actual spending, governmental funds and county-run businesses only)
103Jackson County, GA93,825$45.91$4.3 millionGeneral Engineering $390,189 · in General Government · the state’s standard line “General Engineering”
Public Works Administration $27,350 · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $3.9 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
104Dougherty County, GA82,418$41.72$3.4 millionGeneral Engineering $439,245 · in General Government · the state’s standard line “General Engineering”
Public Works Administration $2.1 million · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $870,485 · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
105James City County, VA82,797$35.71$3.0 millionMaintenance of Highways, Streets, Bridges, and Sidewalks $3.0 million · in Public Works · the state’s standard line “Maintenance of Highways, Streets, Bridges, and Sidewalks” (2025, actual spending, day-to-day operations, including the school division only)
106Hamblen County, TN67,715$34.67$2.3 millionAdministration $474,582 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $1.4 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $427,993 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Capital Outlay $1,814 · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
107Carteret County, NC70,259$32.34$2.3 millionAll other transportation $2.3 million · in Other · the state’s standard line “All other transportation” (2025, actual spending)
108Crawford County, PA82,089$18.27$1.5 millionHighways and Streets $1.5 million · in Transportation · the state’s standard line “Highways and Streets” (2024, actual spending, governmental funds, not transfers only)
109Indiana County, PA82,953$15.06$1.2 millionHighways and Streets $1.2 million · in Transportation · the state’s standard line “Highways and Streets” (2024, actual spending, governmental funds, not transfers only)
110Lawrence County, PA84,233$11.87$999,821Highways and Streets $999,821 · in Transportation · the state’s standard line “Highways and Streets” (2024, actual spending, governmental funds, not transfers only)
111Rockingham County, VA87,674$9.67$848,142Maintenance of Highways, Streets, Bridges, and Sidewalks $848,142 · in Public Works · the state’s standard line “Maintenance of Highways, Streets, Bridges, and Sidewalks” (2025, actual spending, day-to-day operations, including the school division only)
112Armstrong County, PA63,679$5.82$370,682Highways and Streets $370,682 · in Transportation · the state’s standard line “Highways and Streets” (2024, actual spending, governmental funds, not transfers only)
113Pike County, PA62,376$2.69$167,777Highways and Streets $167,777 · in Transportation · the state’s standard line “Highways and Streets” (2024, actual spending, governmental funds, not transfers only)
114Carbon County, PA65,743$2.30$151,408Highways and Streets $151,408 · in Transportation · the state’s standard line “Highways and Streets” (2024, actual spending, governmental funds, not transfers only)
115Augusta County, VA78,622$1.81$142,211Maintenance of Highways, Streets, Bridges, and Sidewalks $142,211 · in Public Works · the state’s standard line “Maintenance of Highways, Streets, Bridges, and Sidewalks” (2025, actual spending, day-to-day operations, including the school division only)
116Clearfield County, PA78,132$1.67$130,309Highways and Streets $130,309 · in Transportation · the state’s standard line “Highways and Streets” (2022, actual spending, governmental funds, not transfers only)
117Burke County, NC88,545$0.00$0no line matched in this budget (2025, actual spending)
118Caldwell County, NC80,739$0.00$0no line matched in this budget (2025, actual spending)
119Chatham County, NC83,874$0.00$0no line matched in this budget (2025, actual spending)
120Franklin County, NC79,771$0.00$0no line matched in this budget (2025, actual spending)
121Granville County, NC61,544$0.00$0no line matched in this budget (2025, actual spending)
122Haywood County, NC63,048$0.00$0no line matched in this budget (2025, actual spending)
123Lee County, NC68,537$0.00$0no line matched in this budget (2025, actual spending)
124Rockingham County, NC93,517$0.00$0no line matched in this budget (2025, actual spending)
125Rutherford County, NC65,587$0.00$0no line matched in this budget (2025, actual spending)
126Stanly County, NC67,326$0.00$0no line matched in this budget (2025, actual spending)
127Surry County, NC71,547$0.00$0no line matched in this budget (2025, actual spending)
128Wilkes County, NC66,186$0.00$0no line matched in this budget (2025, actual spending)
129Wilson County, NC79,958$0.00$0no line matched in this budget (2025, actual spending)
130Columbia County, PA66,012$0.00$0no line matched in this budget (2024, actual spending, governmental funds, not transfers only)
131Northumberland County, PA90,027$0.00$0no line matched in this budget (2024, actual spending, governmental funds, not transfers only)
132Somerset County, PA72,134$0.00$0no line matched in this budget (2024, actual spending, governmental funds, not transfers only)
133Bedford County, VA82,182$0.00$0no line matched in this budget (2025, actual spending, day-to-day operations, including the school division only)
134Fauquier County, VA75,865$0.00$0no line matched in this budget (2025, actual spending, day-to-day operations, including the school division only)
135York County, VA71,410$0.00$0no line matched in this budget (2025, actual spending, day-to-day operations, including the school division only)

Dead ends — 102 counties in this group with no figure yet (their own budgets haven’t been read): Autauga, AL, Blount, AL, Cullman, AL, DeKalb, AL, Elmore, AL, Talladega, AL, Walker, AL, Kenai Peninsula Borough, AK, Apache, AZ, Broomfield, CO, Garfield, CO, Kauai, HI, Oldham, KY, Iberia Parish, LA, St. Landry Parish, LA, Aroostook, ME, Franklin, MA, Forrest, MS, Jones, MS, Lamar, MS, Lauderdale, MS, Lee, MS, Buchanan, MO, Cape Girardeau, MO, Cole, MO, Lincoln, MO, Newton, MO, St. Francois, MO, Cascade, MT, Lewis and Clark, MT, Lyon, NV, Belknap, NH, Cheshire, NH, Grafton, NH, Cape May, NJ, Salem, NJ, Chaves, Eddy, McKinley, Otero, Valencia, Pender, NC, Sampson, NC, Grand Forks, ND, Ward, ND, Athens, OH, Belmont, OH, Erie, OH, Hancock, OH, Jefferson, OH, Knox, OH, Marion, OH, Muskingum, OH, Pickaway, OH, Ross, OH, Scioto, OH, Tuscarawas, OH, Union, OH, Creek, OK, Garfield, OK, Muskogee, OK, Payne, OK, Pottawatomie, OK, Wagoner, OK, Coos, OR, Josephine, OR, Klamath, OR, Polk, OR, Umatilla, OR, Newport, RI, Darlington, SC, Georgetown, SC, Greenwood, SC, Kershaw, SC, Laurens, SC, Oconee, SC, Orangeburg, SC, Lincoln, SD, Angelina, TX, Bowie, TX, Coryell, TX, Harrison, TX, Henderson, TX, Hood, TX, Nacogdoches, TX, Orange, TX, San Patricio, TX, Starr, TX, Van Zandt, TX, Victoria, TX, Walker, TX, Waller, TX, Wise, TX, Box Elder, UT, Iron, UT, Tooele, UT, Rutland, VT, Cabell, WV, Harrison, WV, Jefferson, WV, Raleigh, WV, Wood, WV.

Who’s in the group: Counties anywhere in the U.S. within 25% of its population (2024 Census estimate), either way. If fewer than five fit, the eight closest in population. Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.