How Clinton County compares · From the counties’ own budgets, line by line

Roads and bridges: Clinton County beside counties of similar size across the nation

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Clinton County: $101 per resident, 73rd highest of 128. The middle of the group is $124; the middle half runs from $38.72 to $193 (127 counties with figures, 20 of them at $0).

#CountyResidentsPer residentAmountWhere it comes from
1Tehama County, CA64,451$514$33.1 millionRoads $33.1 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Roads” (2025, actual spending)
2Sullivan County, NY80,450$502$40.4 millionPublic Works Administration $799,672 · in General Government · name contains “public works”
Other Transportation $13.6 million · in Transportation · name contains “transportation”
Maintenance of Roads $14.7 million · in Transportation · name contains “roads”
Machinery $5.4 million · in Transportation · the state’s standard line “Machinery”
Snow Removal $2.3 million · in Transportation · the state’s standard line “Snow Removal”
Transportation, Other $2.2 million · in Transportation · name contains “transportation”
Engineering $1.4 million · in Transportation · name contains “engineering” (2024, actual spending)
3Blue Earth County, MN70,700$500$35.4 millionAdministration $407,228 · in Streets and Highways · the state’s standard line “Administration”
Maintenance $32.9 million · in Streets and Highways · the state’s standard line “Maintenance”
Construction $2.1 million · in Streets and Highways · the state’s standard line “Construction” (2024, actual spending, governmental funds, not utilities only)
4Walton County, FL89,666$425$38.1 millionRoad and Street Facilities $38.1 million · in Transportation · the state’s standard line “Road and Street Facilities” (2025, actual spending, governmental and business funds, including transfers only)
5Crow Wing County, MN68,642$422$28.9 millionAdministration $656,055 · in Streets and Highways · the state’s standard line “Administration”
Maintenance $8.9 million · in Streets and Highways · the state’s standard line “Maintenance”
Construction $19.4 million · in Streets and Highways · the state’s standard line “Construction” (2024, actual spending, governmental funds, not utilities only)
6Calvert County, MD94,913$403$38.3 millionTransportation $38.3 million · in Public Works · the state’s standard line “Transportation” (2024, actual spending, county government, including transfers to school and other boards only)
7Columbia County, FL73,977$395$29.2 millionRoad and Street Facilities $29.2 million · in Transportation · the state’s standard line “Road and Street Facilities” (2024, actual spending, governmental and business funds, including transfers only)
8Kosciusko County, IN80,669$377$30.4 millionHighway $8.3 million · in Roads and bridges · name contains “highway”
Bridge #139 $5.4 million · in Roads and bridges · name contains “bridge”
Bridge #9 $4.2 million · in Roads and bridges · name contains “bridge”
Highway Bridge #123 $2.5 million · in Roads and bridges · name contains “highway”
Bridge #227 $1.9 million · in Roads and bridges · name contains “bridge”
Bridge #30 $1.9 million · in Roads and bridges · name contains “bridge”
Cumulative Bridge $1.5 million · in Roads and bridges · name contains “bridge”
Local Road & Street $1.5 million · in Roads and bridges · name contains “road”
Bridge#161 $1.4 million · in Roads and bridges · name contains “bridge”
Local Trax Rail-1300N ROAD $1.1 million · in Roads and bridges · name contains “road”
Local Trax Rail - 1300 N BRIDGE $435,560 · in Roads and bridges · name contains “bridge”
Bridge Inspection 2022-2025 $248,679 · in Roads and bridges · name contains “bridge” (2026, all county funds, as adopted (before state review) only)
9Steuben County, NY92,015$334$30.8 millionMaintenance of Roads $13.9 million · in Transportation · name contains “roads”
Maintenance of Bridges $5.6 million · in Transportation · name contains “bridges”
Machinery $6.9 million · in Transportation · the state’s standard line “Machinery”
Snow Removal $3.1 million · in Transportation · the state’s standard line “Snow Removal”
Highway and Street Administration $934,563 · in Transportation · name contains “highway”
Engineering $381,728 · in Transportation · name contains “engineering” (2024, actual spending)
10Lewis County, WA87,049$326$28.4 millionEngineering $224,758 · in Transportation · the state’s standard line “Engineering”
Roadway $5.3 million · in Transportation · the state’s standard line “Roadway”
Drainage $5.1 million · in Transportation · the state’s standard line “Drainage”
Structures $2.4 million · in Transportation · the state’s standard line “Structures”
Street Lighting $23,080 · in Transportation · the state’s standard line “Street Lighting”
Traffic Control Devices $1.1 million · in Transportation · the state’s standard line “Traffic Control Devices”
Snow and Ice Control $367,199 · in Transportation · the state’s standard line “Snow and Ice Control”
Street Cleaning $32,845 · in Transportation · the state’s standard line “Street Cleaning”
Other Traffic and Pedestrian Services $219 · in Transportation · the state’s standard line “Other Traffic and Pedestrian Services”
Roadside $1.4 million · in Transportation · the state’s standard line “Roadside”
Ancillary Operations $839,174 · in Transportation · the state’s standard line “Ancillary Operations”
Maintenance Administration and Overhead $6.8 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
Management $2.1 million · in Transportation · the state’s standard line “Management”
Engineering $1.5 million · in Transportation · the state’s standard line “Engineering”
Planning $1.2 million · in Transportation · the state’s standard line “Planning”
Operations Administration and Overhead $119,487 · in Transportation · the state’s standard line “Operations Administration and Overhead” (2025, actual spending)
11Grand Traverse County, MI96,625$317$30.7 millionPublic Works (Non-Act 51) $9.1 million · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $21.5 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
12Clinton County, MI80,050$316$25.3 millionPublic Works (Non-Act 51) $1.9 million · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $23.4 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
13Lake County, CA67,764$302$20.5 millionRoads $6.6 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Roads”
Other Public Ways and Facilities $13.8 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Other Public Ways and Facilities” (2025, actual spending)
14Rice County, MN69,025$296$20.4 millionAdministration $459,745 · in Streets and Highways · the state’s standard line “Administration”
Maintenance $5.8 million · in Streets and Highways · the state’s standard line “Maintenance”
Construction $12.8 million · in Streets and Highways · the state’s standard line “Construction”
All other streets and highways: buildings and equipment $1.4 million · in Streets and Highways · the state’s standard line “All other streets and highways: buildings and equipment” (2024, actual spending, governmental funds, not utilities only)
15Monroe County, FL80,908$288$23.3 millionRoad and Street Facilities $19.2 million · in Transportation · the state’s standard line “Road and Street Facilities”
Other Transportation Systems / Services $4.1 million · in Transportation · the state’s standard line “Other Transportation Systems / Services” (2025, actual spending, governmental and business funds, including transfers only)
16Montcalm County, MI69,314$278$19.3 millionPublic Works (Non-Act 51) $1.7 million · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $17.6 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
17Mendocino County, CA89,175$275$24.5 millionRoads $24.2 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Roads”
Other Public Ways and Facilities $339,143 · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Other Public Ways and Facilities” (2025, actual spending)
18Lonoke County, AR76,389$263$20.1 millionRoad and Bridge $20.1 million · name contains “road” (2026)
19Shiawassee County, MI67,982$260$17.7 millionPublic Works (Non-Act 51) $657,148 · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $17.0 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
20Clay County, MN66,848$257$17.2 millionAdministration $700,328 · in Streets and Highways · the state’s standard line “Administration”
Maintenance $7.8 million · in Streets and Highways · the state’s standard line “Maintenance”
Construction $8.7 million · in Streets and Highways · the state’s standard line “Construction” (2024, actual spending, governmental funds, not utilities only)
21Yuba County, CA87,469$250$21.8 millionRoads $21.8 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Roads” (2025, actual spending)
22Ionia County, MI66,250$249$16.5 millionRoad Commission/Street Dept. (Act 51) $16.5 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
23Lynchburg city, VA80,301$228$18.3 millionMaintenance of Highways, Streets, Bridges, and Sidewalks $18.3 million · in Public Works · the state’s standard line “Maintenance of Highways, Streets, Bridges, and Sidewalks” (2025, actual spending, day-to-day operations, including the school division only)
24Chippewa County, WI67,323$228$15.3 millionHighway Maintenance and Administration $6.3 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $8.2 million · in Transportation · the state’s standard line “Highway Construction”
Road-Related Facilities $654,741 · in Transportation · the state’s standard line “Road-Related Facilities”
Other Transportation $132,890 · in Transportation · the state’s standard line “Other Transportation” (2024, actual spending, governmental funds, including transfers only)
25Allegany County, MD67,097$222$14.9 millionTransportation $14.9 million · in Public Works · the state’s standard line “Transportation” (2024, actual spending, county government, including transfers to school and other boards only)
26Pottawattamie County, IA93,529$220$20.6 millionRoads & Transportation $20.6 million · in Roads & Transportation · the state’s standard line “Roads & Transportation” (2027)
27Portsmouth city, VA96,482$213$20.6 millionMaintenance of Highways, Streets, Bridges, and Sidewalks $20.6 million · in Public Works · the state’s standard line “Maintenance of Highways, Streets, Bridges, and Sidewalks” (2025, actual spending, day-to-day operations, including the school division only)
28Cattaraugus County, NY75,475$210$15.9 millionPublic Works Administration $350,623 · in General Government · name contains “public works”
Maintenance of Roads $7.3 million · in Transportation · name contains “roads”
Machinery $4.0 million · in Transportation · the state’s standard line “Machinery”
Snow Removal $3.0 million · in Transportation · the state’s standard line “Snow Removal”
Engineering $546,775 · in Transportation · name contains “engineering”
Maintenance of Bridges $318,631 · in Transportation · name contains “bridges”
Highway and Street Administration $364,594 · in Transportation · name contains “highway” (2024, actual spending)
29Lapeer County, MI89,168$207$18.4 millionPublic Works (Non-Act 51) $637,839 · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $17.8 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
30Midland County, MI84,022$201$16.9 millionPublic Works (Non-Act 51) $3.1 million · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $13.7 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
31Butler County, KS69,158$198$13.7 millionRoad & Bridge (0041) $13.6 million · in Roads and bridges · name contains “road”
Bridge Building (0042) $91,310 · in Roads and bridges · name contains “bridge”
Street Lighting (0074) $7,010 · in Roads and bridges · name contains “street” (2026, all budgeted funds, spending authority only)
32Walker County, GA69,340$194$13.4 millionPublic Works Administration $12,277 · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $13.4 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
33Dodge County, WI88,635$193$17.1 millionHighway Maintenance and Administration $7.9 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $9.2 million · in Transportation · the state’s standard line “Highway Construction”
Other Transportation $30,000 · in Transportation · the state’s standard line “Other Transportation” (2024, actual spending, governmental funds, including transfers only)
34Barry County, MI64,025$187$12.0 millionRoad Commission/Street Dept. (Act 51) $12.0 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
35Putnam County, FL77,301$185$14.3 millionRoad and Street Facilities $14.3 million · in Transportation · the state’s standard line “Road and Street Facilities” (2025, actual spending, governmental and business funds, including transfers only)
36Leavenworth County, KS84,670$183$15.5 millionRoad & Bridge $15.5 million · in Roads and bridges · name contains “road” (2026, all budgeted funds, spending authority only)
37Riley County, KS72,557$179$13.0 millionRoad & Bridge 1/2 Cent Sales Tax - 157 $4.7 million · in Roads and bridges · name contains “road”
Road & Bridge 0.2 Cent Sales Tax - Fund $8.3 million · in Roads and bridges · name contains “road” (2026, all budgeted funds, spending authority only)
38Wood County, WI73,943$172$12.7 millionHighway Maintenance and Administration $7.8 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $4.0 million · in Transportation · the state’s standard line “Highway Construction”
Road-Related Facilities $962,160 · in Transportation · the state’s standard line “Road-Related Facilities” (2024, actual spending, governmental funds, including transfers only)
39Mason County, WA69,632$171$11.9 millionEngineering $8.0 million · in Transportation · the state’s standard line “Engineering”
Management $2.5 million · in Transportation · the state’s standard line “Management”
Engineering $1.4 million · in Transportation · the state’s standard line “Engineering” (2025, actual spending)
40Grays Harbor County, WA77,893$171$13.3 millionRoadway $4.0 million · in Transportation · the state’s standard line “Roadway”
Drainage $428,011 · in Transportation · the state’s standard line “Drainage”
Structures $74,645 · in Transportation · the state’s standard line “Structures”
Traffic Control Devices $1.0 million · in Transportation · the state’s standard line “Traffic Control Devices”
Snow and Ice Control $578,295 · in Transportation · the state’s standard line “Snow and Ice Control”
Street Cleaning $199,837 · in Transportation · the state’s standard line “Street Cleaning”
Roadside $1.6 million · in Transportation · the state’s standard line “Roadside”
Ancillary Operations $814,562 · in Transportation · the state’s standard line “Ancillary Operations”
Maintenance Administration and Overhead $2.5 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
General Services $653,585 · in Transportation · the state’s standard line “General Services”
Engineering $966,953 · in Transportation · the state’s standard line “Engineering”
Planning $20,643 · in Transportation · the state’s standard line “Planning”
Operations Administration and Overhead $420,107 · in Transportation · the state’s standard line “Operations Administration and Overhead”
Roads/Streets Extraordinary Operations $63,572 · in Transportation · the state’s standard line “Roads/Streets Extraordinary Operations” (2025, actual spending)
41Madison County, NY67,072$170$11.4 millionMaintenance of Roads $5.5 million · in Transportation · name contains “roads”
Snow Removal $1.4 million · in Transportation · the state’s standard line “Snow Removal”
Machinery $2.9 million · in Transportation · the state’s standard line “Machinery”
Transportation, Other $629,404 · in Transportation · name contains “transportation”
Highway and Street Administration $409,491 · in Transportation · name contains “highway”
Snow Removal, State $282,146 · in Transportation · the state’s standard line “Snow Removal, State”
Engineering $181,808 · in Transportation · name contains “engineering”
Water Transportation and Distribution $18,227 · in Utilities · name contains “transportation” (2024, actual spending)
42Wayne County, IN66,410$170$11.3 millionHighway $6.0 million · in Roads and bridges · name contains “highway”
Cumulative Bridge $4.5 million · in Roads and bridges · name contains “bridge”
Local Road & Street $767,501 · in Roads and bridges · name contains “road” (2026, all county funds, as adopted (before state review) only)
43Clallam County, WA77,958$167$13.1 millionRoadway $3.1 million · in Transportation · the state’s standard line “Roadway”
Drainage $447,468 · in Transportation · the state’s standard line “Drainage”
Structures $160,363 · in Transportation · the state’s standard line “Structures”
Other Traffic and Pedestrian Services $1.8 million · in Transportation · the state’s standard line “Other Traffic and Pedestrian Services”
Roadside $1.2 million · in Transportation · the state’s standard line “Roadside”
Maintenance Administration and Overhead $1.7 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
Management $67,986 · in Transportation · the state’s standard line “Management”
General Services $2.5 million · in Transportation · the state’s standard line “General Services”
Facilities $181,840 · in Transportation · the state’s standard line “Facilities”
Engineering $542,437 · in Transportation · the state’s standard line “Engineering”
Planning $118,463 · in Transportation · the state’s standard line “Planning”
Operations Administration and Overhead $1.3 million · in Transportation · the state’s standard line “Operations Administration and Overhead” (2025, actual spending)
44Portage County, WI72,040$167$12.0 millionHighway Maintenance and Administration $8.5 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $2.9 million · in Transportation · the state’s standard line “Highway Construction”
Road-Related Facilities $106,096 · in Transportation · the state’s standard line “Road-Related Facilities”
Other Transportation $508,480 · in Transportation · the state’s standard line “Other Transportation” (2024, actual spending, governmental funds, including transfers only)
45Island County, WA86,478$163$14.1 millionRoadway $2.5 million · in Transportation · the state’s standard line “Roadway”
Drainage $752,403 · in Transportation · the state’s standard line “Drainage”
Sidewalks $242 · in Transportation · the state’s standard line “Sidewalks”
Special Purpose Paths $9,442 · in Transportation · the state’s standard line “Special Purpose Paths”
Street Lighting $23,180 · in Transportation · the state’s standard line “Street Lighting”
Traffic Control Devices $1.3 million · in Transportation · the state’s standard line “Traffic Control Devices”
Parking Facilities $1,559 · in Transportation · the state’s standard line “Parking Facilities”
Snow and Ice Control $231,540 · in Transportation · the state’s standard line “Snow and Ice Control”
Street Cleaning $467,592 · in Transportation · the state’s standard line “Street Cleaning”
Roadside $1.1 million · in Transportation · the state’s standard line “Roadside”
Ancillary Operations $4,430 · in Transportation · the state’s standard line “Ancillary Operations”
Maintenance Administration and Overhead $343,931 · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
Management $810,967 · in Transportation · the state’s standard line “Management”
General Services $1.3 million · in Transportation · the state’s standard line “General Services”
Facilities $17,189 · in Transportation · the state’s standard line “Facilities”
Engineering $1.1 million · in Transportation · the state’s standard line “Engineering”
Planning $601,904 · in Transportation · the state’s standard line “Planning”
Operations Administration and Overhead $3.5 million · in Transportation · the state’s standard line “Operations Administration and Overhead” (2025, actual spending)
46Hancock County, IN88,810$162$14.4 millionHighway $11.8 million · in Roads and bridges · name contains “highway”
Cumulative Bridge $2.1 million · in Roads and bridges · name contains “bridge”
Local Road & Street $495,000 · in Roads and bridges · name contains “road” (2026, all county funds, as adopted (before state review) only)
47Effingham County, GA73,148$162$11.8 millionRoads, Streets, and Bridges $11.8 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
48Van Buren County, MI76,129$160$12.2 millionPublic Works (Non-Act 51) $511,544 · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $11.7 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
49Spalding County, GA70,292$154$10.8 millionPublic Works Administration $195,998 · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $10.6 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
50Warren County, NY65,288$154$10.0 millionPublic Works Facility Site Improvements $107,560 · in Economic Development · name contains “public works”
Public Works Administration $475,159 · in General Government · name contains “public works”
Snow Removal $2.2 million · in Transportation · the state’s standard line “Snow Removal”
Maintenance of Roads $3.1 million · in Transportation · name contains “roads”
Other Transportation $1.5 million · in Transportation · name contains “transportation”
Machinery $2.5 million · in Transportation · the state’s standard line “Machinery”
Engineering $276,706 · in Transportation · name contains “engineering” (2024, actual spending)
51Chelan County, WA81,228$153$12.4 millionRoadway $3.8 million · in Transportation · the state’s standard line “Roadway”
Drainage $401,713 · in Transportation · the state’s standard line “Drainage”
Structures $54,473 · in Transportation · the state’s standard line “Structures”
Sidewalks $3,203 · in Transportation · the state’s standard line “Sidewalks”
Special Purpose Paths $218 · in Transportation · the state’s standard line “Special Purpose Paths”
Street Lighting $19,775 · in Transportation · the state’s standard line “Street Lighting”
Traffic Control Devices $623,827 · in Transportation · the state’s standard line “Traffic Control Devices”
Snow and Ice Control $2.1 million · in Transportation · the state’s standard line “Snow and Ice Control”
Street Cleaning $263,457 · in Transportation · the state’s standard line “Street Cleaning”
Roadside $539,548 · in Transportation · the state’s standard line “Roadside”
Maintenance Administration and Overhead $1.3 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
Management $222,701 · in Transportation · the state’s standard line “Management”
General Services $1.3 million · in Transportation · the state’s standard line “General Services”
Facilities $179,094 · in Transportation · the state’s standard line “Facilities”
Engineering $1.5 million · in Transportation · the state’s standard line “Engineering”
Roads/Streets Extraordinary Operations $134,429 · in Transportation · the state’s standard line “Roads/Streets Extraordinary Operations” (2023, actual spending)
52White County, AR79,091$151$11.9 millionCounty General Road Fund $1.1 million · in County General Fund · name contains “road”
County Road Fund $10.1 million · name contains “road”
Additional Motor Fuel Tax Fund $358,971 · name contains “motor fuel”
Road Department $300,000 · in Capital Improvement Fund · name contains “road” (2026)
53Warrick County, IN66,339$150$10.0 millionHighway $4.5 million · in Roads and bridges · name contains “highway”
LIT Road Fund $3.7 million · in Roads and bridges · name contains “road”
Local Road & Street $1.4 million · in Roads and bridges · name contains “road”
Cumulative Bridge $296,661 · in Roads and bridges · name contains “bridge” (2026, all county funds, as adopted (before state review) only)
54Manitowoc County, WI81,513$141$11.5 millionHighway Maintenance and Administration −$2.2 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $13.2 million · in Transportation · the state’s standard line “Highway Construction”
Road-Related Facilities $113,914 · in Transportation · the state’s standard line “Road-Related Facilities”
Other Transportation $425,006 · in Transportation · the state’s standard line “Other Transportation” (2024, actual spending, governmental funds, including transfers only)
55Liberty County, GA68,607$139$9.5 millionGeneral Engineering $117,031 · in General Government · the state’s standard line “General Engineering”
Roads, Streets, and Bridges $9.4 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
56Marquette County, MI67,979$138$9.4 millionPublic Works (Non-Act 51) $56,125 · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $9.4 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
57Isabella County, MI65,072$136$8.9 millionPublic Works (Non-Act 51) $387,974 · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $8.5 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
58Hall County, NE62,869$132$8.3 millionPublic Works - Highways & Roads $8.3 million · in Public Works · the state’s standard line “Public Works - Highways & Roads” (2026)
59Pope County, AR64,829$131$8.5 millionRoad Fund $8.3 million · name contains “road”
Additional Motor Fuel Tax Fund $260,000 · name contains “motor fuel” (2026)
60Morgan County, IN73,825$131$9.7 millionHighway $8.4 million · in Roads and bridges · name contains “highway”
Local Road & Street $1.3 million · in Roads and bridges · name contains “road” (2026, all county funds, as adopted (before state review) only)
61Cumberland County, TN65,618$129$8.5 millionEngineering $250,301 · in General Government · name contains “engineering”
Litter and Trash Collection $118,985 · in Highways · the state’s standard line “Litter and Trash Collection”
Capital Outlay $4.6 million · in Highways · the state’s standard line “Capital Outlay”
Administration $271,604 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $2.8 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $368,848 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $113,380 · in Highways · the state’s standard line “Other Charges” (2025, actual spending, governmental funds, including schools only)
62Sauk County, WI66,486$126$8.4 millionHighway Maintenance and Administration $6.8 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $1.4 million · in Transportation · the state’s standard line “Highway Construction”
Other Transportation $200,867 · in Transportation · the state’s standard line “Other Transportation” (2024, actual spending, governmental funds, including transfers only)
63Cayuga County, NY74,567$125$9.4 millionMaintenance of Roads $4.0 million · in Transportation · name contains “roads”
Snow Removal $1.8 million · in Transportation · the state’s standard line “Snow Removal”
Machinery $2.6 million · in Transportation · the state’s standard line “Machinery”
Snow Removal, State $516,599 · in Transportation · the state’s standard line “Snow Removal, State”
Highway and Street Administration $354,751 · in Transportation · name contains “highway”
Maintenance of Bridges $67,564 · in Transportation · name contains “bridges”
Highway Services for Other Governments $61,611 · in Transportation · name contains “highway” (2024, actual spending)
64Barrow County, GA96,294$124$12.0 millionPublic Works Administration $1.7 million · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $10.3 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
65Greene County, TN73,398$124$9.1 millionAdministration $294,927 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $5.6 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $1.2 million · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Asphalt Plant Operations $1.3 million · in Highways · the state’s standard line “Asphalt Plant Operations”
Other Charges $102,108 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $563,719 · in Highways · the state’s standard line “Capital Outlay”
Public Transportation $24,916 · in Other Operations · name contains “transportation” (2025, actual spending, governmental funds, including schools only)
66Boone County, IN78,773$116$9.1 millionHighway $5.6 million · in Roads and bridges · name contains “highway”
Cumulative Bridge $2.9 million · in Roads and bridges · name contains “bridge”
Local Road & Street $720,000 · in Roads and bridges · name contains “road” (2026, all county funds, as adopted (before state review) only)
67Ozaukee County, WI93,956$116$10.9 millionHighway Maintenance and Administration $4.1 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $2.2 million · in Transportation · the state’s standard line “Highway Construction”
Road-Related Facilities $956,945 · in Transportation · the state’s standard line “Road-Related Facilities”
Other Transportation $3.5 million · in Transportation · the state’s standard line “Other Transportation” (2024, actual spending, governmental funds, including transfers only)
68Troup County, GA71,513$115$8.3 millionRoads, Streets, and Bridges $8.3 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
69Bulloch County, GA85,454$110$9.4 millionGeneral Engineering $265,161 · in General Government · the state’s standard line “General Engineering”
Roads, Streets, and Bridges $9.1 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
70Putnam County, TN84,894$105$8.9 millionAdministration $1.1 million · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $5.0 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $561,572 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $343,022 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $2.0 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
71Jefferson County, WI86,245$104$8.9 millionHighway Maintenance and Administration $3.7 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $4.8 million · in Transportation · the state’s standard line “Highway Construction”
Road-Related Facilities $383,818 · in Transportation · the state’s standard line “Road-Related Facilities” (2024, actual spending, governmental funds, including transfers only)
72Bannock County, ID91,010$103$9.4 millionRoad & Bridge $9.4 million · in Road and Bridge · name contains “road”
Engineer $0 · in Road and Bridge · name contains “engineer” (2025)
73Clinton County, NY77,871$101$7.9 millionSnow Removal $2.5 million · in Transportation · the state’s standard line “Snow Removal”
Maintenance of Roads $2.7 million · in Transportation · name contains “roads”
Machinery $2.3 million · in Transportation · the state’s standard line “Machinery”
Highway and Street Administration $326,303 · in Transportation · name contains “highway”
Engineering $132,959 · in Transportation · name contains “engineering”
Maintenance of Bridges $18,876 · in Transportation · name contains “bridges” (2024, actual spending)
74Adams County, IL64,109$96.91$6.2 millionStreets and Highways $5.9 million · in Transportation and Public Works · the state’s standard line “Streets and Highways”
Other transportation and public works $313,271 · in Transportation and Public Works · the state’s standard line “Other transportation and public works” (2025, actual spending, governmental funds and county-run businesses only)
75Grant County, IN66,458$94.21$6.3 millionHighway $4.5 million · in Roads and bridges · name contains “highway”
Cumulative Bridge $1.2 million · in Roads and bridges · name contains “bridge”
Local Road & Street $600,000 · in Roads and bridges · name contains “road” (2026, all county funds, as adopted (before state review) only)
76Jefferson County, AR63,672$93.42$5.9 millionRoad Department $5.9 million · name contains “road” (2026)
77Bartholomew County, IN84,741$91.77$7.8 millionHighway $5.0 million · in Roads and bridges · name contains “highway”
Cumulative Bridge $1.8 million · in Roads and bridges · name contains “bridge”
Local Road & Street $995,000 · in Roads and bridges · name contains “road” (2026, all county funds, as adopted (before state review) only)
78Williamson County, IL67,064$87.00$5.8 millionStreets and Highways $5.8 million · in Transportation and Public Works · the state’s standard line “Streets and Highways” (2024, actual spending, governmental funds and county-run businesses only)
79Pulaski County, KY66,842$87.00$5.8 millionRoad Fund $5.8 million · in Roads · the state’s standard line “Road Fund” (2024, all budgeted funds, final (amended) budget only)
80Catoosa County, GA68,940$85.57$5.9 millionGeneral Engineering $34,072 · in General Government · the state’s standard line “General Engineering”
Public Works Administration $298,331 · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $5.6 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
81Chemung County, NY81,115$82.78$6.7 millionMaintenance of Roads $4.9 million · in Transportation · name contains “roads”
Machinery $1.2 million · in Transportation · the state’s standard line “Machinery”
Highway and Street Administration $464,383 · in Transportation · name contains “highway”
Engineering $168,967 · in Transportation · name contains “engineering” (2024, actual spending)
82Wayne County, NY90,757$82.72$7.5 millionMaintenance of Roads $3.7 million · in Transportation · name contains “roads”
Snow Removal $1.5 million · in Transportation · the state’s standard line “Snow Removal”
Machinery $1.8 million · in Transportation · the state’s standard line “Machinery”
Highway and Street Administration $277,371 · in Transportation · name contains “highway”
Engineering $209,672 · in Transportation · name contains “engineering” (2024, actual spending)
83Robertson County, TN78,459$82.64$6.5 millionEngineering $213,079 · in General Government · name contains “engineering”
Administration $431,399 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $3.1 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $447,065 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $461,473 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $1.9 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
84San Benito County, CA69,159$78.96$5.5 millionRoads $3.9 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Roads”
Other Public Ways and Facilities $1.5 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Other Public Ways and Facilities” (2025, actual spending)
85Howard County, IN84,082$78.27$6.6 millionHighway $4.9 million · in Roads and bridges · name contains “highway”
Cumulative Bridge $890,000 · in Roads and bridges · name contains “bridge”
Local Road & Street $794,000 · in Roads and bridges · name contains “road” (2026, all county funds, as adopted (before state review) only)
86Natrona County, WY80,410$75.97$6.1 millionRoad and bridge $3.1 million · in Roads and bridges · name contains “road”
Road and bridge (construction) $1.3 million · in Roads and bridges · name contains “road”
Road and bridge (equipment, land and buildings) $1.7 million · in Roads and bridges · name contains “road” (2025, actual spending, all county funds, not separate boards only)
87Christian County, KY71,006$72.19$5.1 millionRoad Fund $4.7 million · in Roads · the state’s standard line “Road Fund”
Local Government Economic Assistance Fund $415,000 · in Roads · the state’s standard line “Local Government Economic Assistance Fund” (2025, all budgeted funds, final (amended) budget only)
88Laurel County, KY63,353$69.99$4.4 millionRoad Fund $4.4 million · in Roads · the state’s standard line “Road Fund”
Local Government Economic Assistance Fund $57,000 · in Roads · the state’s standard line “Local Government Economic Assistance Fund” (2021, all budgeted funds, final (amended) budget only)
89Anderson County, TN81,449$66.30$5.4 millionAdministration $294,945 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $3.0 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $767,408 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $264,587 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $1.1 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
90Bullitt County, KY85,802$59.12$5.1 millionRoad Fund $4.1 million · in Roads · the state’s standard line “Road Fund”
Local Government Economic Assistance Fund $980,645 · in Roads · the state’s standard line “Local Government Economic Assistance Fund” (2025, all budgeted funds, final (amended) budget only)
91Floyd County, IN81,931$58.69$4.8 millionHighway $3.1 million · in Roads and bridges · name contains “highway”
Local Road & Street $970,000 · in Roads and bridges · name contains “road”
Cumulative Bridge $776,650 · in Roads and bridges · name contains “bridge” (2026, all county funds, as adopted (before state review) only)
92Glynn County, GA86,540$56.30$4.9 millionGeneral Engineering $1.0 million · in General Government · the state’s standard line “General Engineering”
Public Works Administration $2.0 million · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $1.8 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
93McCracken County, KY67,550$54.57$3.7 millionRoad Fund $3.7 million · in Roads · the state’s standard line “Road Fund” (2023, all budgeted funds, final (amended) budget only)
94Vermilion County, IL71,106$51.17$3.6 millionStreets and Highways $3.6 million · in Transportation and Public Works · the state’s standard line “Streets and Highways” (2025, actual spending, governmental funds and county-run businesses only)
95Jackson County, GA93,825$45.91$4.3 millionGeneral Engineering $390,189 · in General Government · the state’s standard line “General Engineering”
Public Works Administration $27,350 · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $3.9 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
96Dougherty County, GA82,418$41.72$3.4 millionGeneral Engineering $439,245 · in General Government · the state’s standard line “General Engineering”
Public Works Administration $2.1 million · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $870,485 · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
97James City County, VA82,797$35.71$3.0 millionMaintenance of Highways, Streets, Bridges, and Sidewalks $3.0 million · in Public Works · the state’s standard line “Maintenance of Highways, Streets, Bridges, and Sidewalks” (2025, actual spending, day-to-day operations, including the school division only)
98Hamblen County, TN67,715$34.67$2.3 millionAdministration $474,582 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $1.4 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $427,993 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Capital Outlay $1,814 · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
99Carteret County, NC70,259$32.34$2.3 millionAll other transportation $2.3 million · in Other · the state’s standard line “All other transportation” (2025, actual spending)
100Crawford County, PA82,089$18.27$1.5 millionHighways and Streets $1.5 million · in Transportation · the state’s standard line “Highways and Streets” (2024, actual spending, governmental funds, not transfers only)
101Indiana County, PA82,953$15.06$1.2 millionHighways and Streets $1.2 million · in Transportation · the state’s standard line “Highways and Streets” (2024, actual spending, governmental funds, not transfers only)
102Lawrence County, PA84,233$11.87$999,821Highways and Streets $999,821 · in Transportation · the state’s standard line “Highways and Streets” (2024, actual spending, governmental funds, not transfers only)
103Rockingham County, VA87,674$9.67$848,142Maintenance of Highways, Streets, Bridges, and Sidewalks $848,142 · in Public Works · the state’s standard line “Maintenance of Highways, Streets, Bridges, and Sidewalks” (2025, actual spending, day-to-day operations, including the school division only)
104Armstrong County, PA63,679$5.82$370,682Highways and Streets $370,682 · in Transportation · the state’s standard line “Highways and Streets” (2024, actual spending, governmental funds, not transfers only)
105Pike County, PA62,376$2.69$167,777Highways and Streets $167,777 · in Transportation · the state’s standard line “Highways and Streets” (2024, actual spending, governmental funds, not transfers only)
106Carbon County, PA65,743$2.30$151,408Highways and Streets $151,408 · in Transportation · the state’s standard line “Highways and Streets” (2024, actual spending, governmental funds, not transfers only)
107Augusta County, VA78,622$1.81$142,211Maintenance of Highways, Streets, Bridges, and Sidewalks $142,211 · in Public Works · the state’s standard line “Maintenance of Highways, Streets, Bridges, and Sidewalks” (2025, actual spending, day-to-day operations, including the school division only)
108Clearfield County, PA78,132$1.67$130,309Highways and Streets $130,309 · in Transportation · the state’s standard line “Highways and Streets” (2022, actual spending, governmental funds, not transfers only)
109Twin Falls County, ID96,509$0.00$0no line matched in this budget (2025)
110Burke County, NC88,545$0.00$0no line matched in this budget (2025, actual spending)
111Caldwell County, NC80,739$0.00$0no line matched in this budget (2025, actual spending)
112Chatham County, NC83,874$0.00$0no line matched in this budget (2025, actual spending)
113Franklin County, NC79,771$0.00$0no line matched in this budget (2025, actual spending)
114Haywood County, NC63,048$0.00$0no line matched in this budget (2025, actual spending)
115Lee County, NC68,537$0.00$0no line matched in this budget (2025, actual spending)
116Rockingham County, NC93,517$0.00$0no line matched in this budget (2025, actual spending)
117Rutherford County, NC65,587$0.00$0no line matched in this budget (2025, actual spending)
118Stanly County, NC67,326$0.00$0no line matched in this budget (2025, actual spending)
119Surry County, NC71,547$0.00$0no line matched in this budget (2025, actual spending)
120Wilkes County, NC66,186$0.00$0no line matched in this budget (2025, actual spending)
121Wilson County, NC79,958$0.00$0no line matched in this budget (2025, actual spending)
122Columbia County, PA66,012$0.00$0no line matched in this budget (2024, actual spending, governmental funds, not transfers only)
123Northumberland County, PA90,027$0.00$0no line matched in this budget (2024, actual spending, governmental funds, not transfers only)
124Somerset County, PA72,134$0.00$0no line matched in this budget (2024, actual spending, governmental funds, not transfers only)
125Bedford County, VA82,182$0.00$0no line matched in this budget (2025, actual spending, day-to-day operations, including the school division only)
126Fauquier County, VA75,865$0.00$0no line matched in this budget (2025, actual spending, day-to-day operations, including the school division only)
127Roanoke County, VA97,334$0.00$0no line matched in this budget (2025, actual spending, day-to-day operations, including the school division only)
128York County, VA71,410$0.00$0no line matched in this budget (2025, actual spending, day-to-day operations, including the school division only)

Dead ends — 100 counties in this group with no figure yet (their own budgets haven’t been read): Cullman, AL, DeKalb, AL, Elmore, AL, St. Clair, AL, Talladega, AL, Walker, AL, Fairbanks North Star Borough, AK, Apache, AZ, Broomfield, CO, Garfield, CO, Kauai, HI, Campbell, KY, Oldham, KY, Iberia Parish, LA, Lafourche Parish, LA, St. Landry Parish, LA, Aroostook, ME, Franklin, MA, Forrest, MS, Jones, MS, Lamar, MS, Lauderdale, MS, Lee, MS, Buchanan, MO, Cape Girardeau, MO, Christian, MO, Cole, MO, Lincoln, MO, St. Francois, MO, Cascade, MT, Lewis and Clark, MT, Lyon, NV, Belknap, NH, Cheshire, NH, Grafton, NH, Cape May, NJ, Salem, NJ, Chaves, NM, Lea, NM, McKinley, NM, Otero, NM, Valencia, NM, Pender, NC, Grand Forks, ND, Ward, ND, Ashtabula, OH, Athens, OH, Belmont, OH, Erie, OH, Geauga, OH, Hancock, OH, Jefferson, OH, Knox, OH, Marion, OH, Muskingum, OH, Ross, OH, Scioto, OH, Tuscarawas, OH, Union, OH, Creek, OK, Muskogee, OK, Payne, OK, Pottawatomie, OK, Wagoner, OK, Coos, OR, Josephine, OR, Klamath, OR, Polk, OR, Umatilla, OR, Newport, RI, Darlington, SC, Georgetown, SC, Greenwood, SC, Kershaw, SC, Laurens, SC, Oconee, SC, Orangeburg, SC, Lincoln, SD, Angelina, TX, Bowie, TX, Coryell, TX, Harrison, TX, Henderson, TX, Hood, TX, Nacogdoches, TX, Orange, TX, San Patricio, TX, Starr, TX, Van Zandt, TX, Victoria, TX, Walker, TX, Waller, TX, Wise, TX, Box Elder, UT, Iron, UT, Tooele, UT, Cabell, WV, Harrison, WV, Raleigh, WV, Wood, WV.

Who’s in the group: Counties anywhere in the U.S. within 25% of its population (2024 Census estimate), either way. If fewer than five fit, the eight closest in population. Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.