How Washington County compares · From the counties’ own budgets, line by line

Libraries: Washington County beside neighboring counties (within 60 miles)

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Washington County: $0.00 per resident, 7th highest of 10. The middle of the group is $0.81; the middle half runs from $0.00 to $2.26 (9 counties with figures, 3 of them at $0).

#CountyResidentsPer residentAmountWhere it comes from
1Schenectady County, NY162,261$41.23$6.7 millionLibrary $6.7 million · in Culture and Recreation · name contains “library” (2024, actual spending)
2Albany County, NY319,964$8.41$2.7 millionLibrary $2.7 million · in Culture and Recreation · name contains “library” (2024, actual spending)
3Hamilton County, NY5,082$2.26$11,500Library $11,500 · in Culture and Recreation · name contains “library” (2024, actual spending)
4Warren County, NY65,288$0.84$55,000Library $55,000 · in Culture and Recreation · name contains “library” (2024, actual spending)
5Essex County, NY36,744$0.81$29,610Library $29,610 · in Culture and Recreation · name contains “library” (2024, actual spending)
6Saratoga County, NY240,360$0.15$35,000Library $35,000 · in Culture and Recreation · name contains “library” (2024, actual spending)
7Fulton County, NY52,073$0.00$0no line matched in this budget (2024, actual spending)
8Montgomery County, NY49,648$0.00$0no line matched in this budget (2024, actual spending)
9Rensselaer County, NY160,749$0.00$0no line matched in this budget (2024, actual spending)
10Washington County, NY59,839$0.00$0no line matched in this budget (2024, actual spending)

Dead ends — 5 counties in this group with no figure yet (their own budgets haven’t been read): Addison, VT, Bennington, VT, Rutland, VT, Windham, VT, Windsor, VT.

Who’s in the group: Counties whose geographic center is within 60 miles of its center, in any state (2024 Census Gazetteer). Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.