How Bledsoe County compares · From the counties’ own budgets, line by line

Roads and bridges: Bledsoe County beside neighboring counties (within 60 miles)

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Bledsoe County: $2.1 million, 27th highest of 30. The middle of the group is $3.8 million; the middle half runs from $3.2 million to $5.9 million (29 counties with figures, 1 of them at $0).

#CountyResidentsAmountPer residentWhere it comes from
1Whitfield County, GA105,070$15.2 million$145/res.Roads, Streets, and Bridges $15.2 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
2Walker County, GA69,340$13.4 million$194/res.Public Works Administration $12,277 · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $13.4 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
3Putnam County, TN84,894$8.9 million$105/res.Administration $1.1 million · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $5.0 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $561,572 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $343,022 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $2.0 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
4Cumberland County, TN65,618$8.5 million$129/res.Engineering $250,301 · in General Government · name contains “engineering”
Litter and Trash Collection $118,985 · in Highways · the state’s standard line “Litter and Trash Collection”
Capital Outlay $4.6 million · in Highways · the state’s standard line “Capital Outlay”
Administration $271,604 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $2.8 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $368,848 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $113,380 · in Highways · the state’s standard line “Other Charges” (2025, actual spending, governmental funds, including schools only)
5Monroe County, TN49,154$7.3 million$148/res.Engineering $579,246 · in General Government · name contains “engineering”
Highway and Bridge Maintenance $3.9 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Litter and Trash Collection $101,596 · in Highways · the state’s standard line “Litter and Trash Collection”
Administration $317,315 · in Highways · the state’s standard line “Administration”
Operation and Maintenance of Equipment $585,362 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $328,466 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $1.5 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
6Bradley County, TN113,782$7.1 million$62.57/res.Public Transportation $42,000 · in Other Operations · name contains “transportation”
Administration $627,500 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $2.9 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $730,110 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Traffic Control $171,527 · in Highways · the state’s standard line “Traffic Control”
Other Charges $274,242 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $2.4 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
7Rhea County, TN34,759$5.9 million$171/res.Administration $265,201 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $3.0 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $970,858 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $130,325 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $1.6 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
8Catoosa County, GA68,940$5.9 million$85.57/res.General Engineering $34,072 · in General Government · the state’s standard line “General Engineering”
Public Works Administration $298,331 · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $5.6 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
9McMinn County, TN56,754$5.5 million$97.73/res.Administration $303,332 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $2.8 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $638,378 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $366,474 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $1.4 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
10Overton County, TN23,551$5.5 million$235/res.Traffic Control $1,842 · in Highways · the state’s standard line “Traffic Control”
Litter and Trash Collection $40,614 · in Highways · the state’s standard line “Litter and Trash Collection”
Administration $220,226 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $1.6 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $510,326 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Quarry Operations $160,849 · in Highways · the state’s standard line “Quarry Operations”
Other Charges $211,225 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $2.8 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
11Franklin County, TN45,137$5.1 million$112/res.Administration $420,886 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $1.0 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $298,747 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Quarry Operations $368,863 · in Highways · the state’s standard line “Quarry Operations”
Other Charges $209,123 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $2.7 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
12Jackson County, TN12,376$4.8 million$387/res.Litter and Trash Collection $42,622 · in Highways · the state’s standard line “Litter and Trash Collection”
Administration $198,311 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $1.7 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $458,939 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $157,404 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $2.3 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
13Roane County, TN56,742$4.5 million$80.16/res.Administration $369,893 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $3.3 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $581,886 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Traffic Control $62,646 · in Highways · the state’s standard line “Traffic Control”
Litter and Trash Collection $53,658 · in Highways · the state’s standard line “Litter and Trash Collection”
Other Charges $204,386 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $1,553 · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
14Fentress County, TN20,129$4.0 million$198/res.Administration $241,280 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $1.9 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $473,355 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $140,050 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $1.2 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
15Grundy County, TN14,148$3.8 million$270/res.Administration $210,429 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $1.3 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $185,522 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $149,716 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $2.0 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
16Marion County, TN29,826$3.7 million$124/res.Administration $413,205 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $1.7 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $421,049 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $78,638 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $1.1 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
17Coffee County, TN61,285$3.7 million$60.05/res.Administration $302,961 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $2.4 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $418,416 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $288,884 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $228,693 · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
18Warren County, TN43,619$3.5 million$80.57/res.Administration $192,493 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $2.5 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $189,030 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $163,880 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $495,459 · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
19White County, TN29,108$3.5 million$120/res.Administration $230,839 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $2.2 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $150,153 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $107,165 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $820,395 · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
20Polk County, TN18,338$3.4 million$186/res.Administration $274,005 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $1.3 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $564,300 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $117,403 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $1.1 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
21Loudon County, TN62,129$3.4 million$54.30/res.Administration $1.2 million · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $955,584 · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $352,574 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $224,019 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $602,531 · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
22Cannon County, TN15,142$3.2 million$208/res.American Rescue Plan Act Grant #1 $266,930 · in Highways · the state’s standard line “American Rescue Plan Act Grant #1”
Administration $199,625 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $1.3 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $292,832 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $137,539 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $918,773 · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
23Van Buren County, TN6,686$2.9 million$438/res.Litter and Trash Collection $39,215 · in Highways · the state’s standard line “Litter and Trash Collection”
Administration $195,625 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $1.2 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $363,642 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Quarry Operations $11,623 · in Highways · the state’s standard line “Quarry Operations”
Other Charges $103,530 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $1.0 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
24DeKalb County, TN21,747$2.8 million$130/res.Administration $191,924 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $1.9 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $261,027 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Quarry Operations $135,414 · in Highways · the state’s standard line “Quarry Operations”
Other Charges $151,392 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $172,420 · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
25Morgan County, TN21,954$2.5 million$115/res.Administration $216,553 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $1.4 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $405,374 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $124,107 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $423,868 · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
26Meigs County, TN13,937$2.2 million$157/res.Administration $242,983 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $1.1 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $232,147 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $299,887 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $283,573 · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
27Bledsoe County, TN15,591$2.1 million$134/res.Litter and Trash Collection $84,966 · in Highways · the state’s standard line “Litter and Trash Collection”
Administration $273,635 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $1.3 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $253,794 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $115,633 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $86,572 · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
28Sequatchie County, TN17,620$2.0 million$115/res.Administration $309,901 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $969,859 · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $250,749 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $79,190 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $412,022 · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
29Dade County, GA16,068$1.6 million$102/res.Public Works Administration $1.6 million · in Public Works · the state’s standard line “Public Works Administration” (2024, actual spending, operations and capital, including utility systems, not debt only)
30Hamilton County, TN386,256$0$0.00/res.no line matched in this budget (2025, actual spending, governmental funds, including schools only)

Who’s in the group: Counties whose geographic center is within 60 miles of its center, in any state (2024 Census Gazetteer). Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.