How Pacific County compares · From the counties’ own budgets, line by line

Utilities (water, sewer, power, airport, port, transit): Pacific County beside counties of similar size in Washington

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Pacific County: $271,282, 7th highest of 12. The middle of the group is $358,599; the middle half runs from $26,371 to $677,083 (11 counties with figures, 3 of them at $0).

#CountyResidentsAmountPer residentWhere it comes from
1Klickitat County, WA24,124$1.0 million$42.72/res.Sewer/Reclaimed Water Utilities $775,518 · in Utilities · the state’s standard line “Sewer/Reclaimed Water Utilities”
Airports and Ports $255,000 · in Transportation · the state’s standard line “Airports and Ports” (2025, actual spending)
2Asotin County, WA22,523$729,466$32.39/res.Storm Drainage Utilities $729,466 · in Utilities · the state’s standard line “Storm Drainage Utilities” (2025, actual spending)
3Kittitas County, WA48,172$720,730$14.96/res.Water Utilities $275,659 · in Utilities · the state’s standard line “Water Utilities”
Irrigation/Reclamation Utilities $146,000 · in Utilities · the state’s standard line “Irrigation/Reclamation Utilities”
Airports and Ports $299,071 · in Transportation · the state’s standard line “Airports and Ports” (2025, actual spending)
4San Juan County, WA18,668$633,435$33.93/res.Storm Drainage Utilities $633,435 · in Utilities · the state’s standard line “Storm Drainage Utilities” (2025, actual spending)
5Douglas County, WA45,795$538,072$11.75/res.Storm Drainage Utilities $538,072 · in Utilities · the state’s standard line “Storm Drainage Utilities” (2025, actual spending)
6Jefferson County, WA33,944$358,599$10.56/res.Storm Drainage Utilities $22,079 · in Utilities · the state’s standard line “Storm Drainage Utilities”
Sewer/Reclaimed Water Utilities $333,550 · in Utilities · the state’s standard line “Sewer/Reclaimed Water Utilities”
Transits, Railroads and Other Transportation Systems $2,970 · in Transportation · the state’s standard line “Transits, Railroads and Other Transportation Systems” (2025, actual spending)
7Pacific County, WA24,245$271,282$11.19/res.Sewer/Reclaimed Water Utilities $1,495 · in Utilities · the state’s standard line “Sewer/Reclaimed Water Utilities”
Irrigation/Reclamation Utilities $269,787 · in Utilities · the state’s standard line “Irrigation/Reclamation Utilities” (2025, actual spending)
8Okanogan County, WA44,942$132,844$2.96/res.Water Utilities $21,753 · in Utilities · the state’s standard line “Water Utilities”
Sewer/Reclaimed Water Utilities $111,091 · in Utilities · the state’s standard line “Sewer/Reclaimed Water Utilities” (2025, actual spending)
9Adams County, WA21,039$52,741$2.51/res.Television/Cable/Internet Utilities $3,579 · in Utilities · the state’s standard line “Television/Cable/Internet Utilities”
Irrigation/Reclamation Utilities $49,162 · in Utilities · the state’s standard line “Irrigation/Reclamation Utilities” (2025, actual spending)
10Pend Oreille County, WA14,332$0$0.00/res.no line matched in this budget (2025, actual spending)
11Skamania County, WA12,660$0$0.00/res.no line matched in this budget (2025, actual spending)
12Whitman County, WA48,399$0$0.00/res.no line matched in this budget (2025, actual spending)

Who’s in the group: Counties in the same state with between half and double its population (2024 Census estimate). If fewer than five fit, the eight closest in population. Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.