How Pierce County compares · From the counties’ own budgets, line by line

Roads and bridges: Pierce County beside counties of similar size in Washington

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Pierce County: $76.0 million, 3rd highest of 9. The middle of the group is $35.3 million; the middle half runs from $31.9 million to $74.5 million (8 counties with figures).

#CountyResidentsAmountPer residentWhere it comes from
1King County, WA2,340,211$133.6 million$57.09/res.Roads $133.6 million · name contains “roads” (2026, two-year budget, halved)
2Snohomish County, WA864,113$91.7 million$106/res.Roadway $26.0 million · in Transportation · the state’s standard line “Roadway”
Drainage $5.2 million · in Transportation · the state’s standard line “Drainage”
Structures $1.7 million · in Transportation · the state’s standard line “Structures”
Traffic Control Devices $6.4 million · in Transportation · the state’s standard line “Traffic Control Devices”
Parking Facilities $820,656 · in Transportation · the state’s standard line “Parking Facilities”
Maintenance Administration and Overhead $5.4 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
Management $5.0 million · in Transportation · the state’s standard line “Management”
General Services $11.4 million · in Transportation · the state’s standard line “General Services”
Facilities $183,586 · in Transportation · the state’s standard line “Facilities”
Engineering $5.0 million · in Transportation · the state’s standard line “Engineering”
Planning $1.5 million · in Transportation · the state’s standard line “Planning”
Operations Administration and Overhead $23.2 million · in Transportation · the state’s standard line “Operations Administration and Overhead” (2025, actual spending)
3Pierce County, WA941,170$76.0 million$80.73/res.Engineering $905,819 · in Transportation · the state’s standard line “Engineering”
Roadway $16.4 million · in Transportation · the state’s standard line “Roadway”
Drainage $3.0 million · in Transportation · the state’s standard line “Drainage”
Structures $117,205 · in Transportation · the state’s standard line “Structures”
Special Purpose Paths $409,589 · in Transportation · the state’s standard line “Special Purpose Paths”
Street Lighting $476,554 · in Transportation · the state’s standard line “Street Lighting”
Traffic Control Devices $4.3 million · in Transportation · the state’s standard line “Traffic Control Devices”
Snow and Ice Control $2.0 million · in Transportation · the state’s standard line “Snow and Ice Control”
Street Cleaning $1.3 million · in Transportation · the state’s standard line “Street Cleaning”
Roadside $6.1 million · in Transportation · the state’s standard line “Roadside”
Maintenance Administration and Overhead $12.6 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
Management $1.8 million · in Transportation · the state’s standard line “Management”
General Services $11.8 million · in Transportation · the state’s standard line “General Services”
Facilities $2.5 million · in Transportation · the state’s standard line “Facilities”
Engineering $5.4 million · in Transportation · the state’s standard line “Engineering”
Planning $2.5 million · in Transportation · the state’s standard line “Planning”
Operations Administration and Overhead $4.3 million · in Transportation · the state’s standard line “Operations Administration and Overhead” (2025, actual spending)
4Clark County, WA527,269$68.8 million$130/res.Roadway $17.6 million · in Transportation · the state’s standard line “Roadway”
Drainage $4.1 million · in Transportation · the state’s standard line “Drainage”
Structures $13,074 · in Transportation · the state’s standard line “Structures”
Sidewalks $55,858 · in Transportation · the state’s standard line “Sidewalks”
Traffic Control Devices $5.0 million · in Transportation · the state’s standard line “Traffic Control Devices”
Snow and Ice Control $415,413 · in Transportation · the state’s standard line “Snow and Ice Control”
Street Cleaning $2.2 million · in Transportation · the state’s standard line “Street Cleaning”
Other Traffic and Pedestrian Services $10 · in Transportation · the state’s standard line “Other Traffic and Pedestrian Services”
Roadside $5.9 million · in Transportation · the state’s standard line “Roadside”
Ancillary Operations $1.2 million · in Transportation · the state’s standard line “Ancillary Operations”
Maintenance Administration and Overhead $6.3 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
Management $17.5 million · in Transportation · the state’s standard line “Management”
Engineering $8.2 million · in Transportation · the state’s standard line “Engineering”
Planning $185,839 · in Transportation · the state’s standard line “Planning”
Operations Administration and Overhead $1,337 · in Transportation · the state’s standard line “Operations Administration and Overhead” (2025, actual spending)
5Thurston County, WA302,912$35.7 million$118/res.Engineering $167,809 · in Transportation · the state’s standard line “Engineering”
Roadway $6.5 million · in Transportation · the state’s standard line “Roadway”
Drainage $1.9 million · in Transportation · the state’s standard line “Drainage”
Structures $2.7 million · in Transportation · the state’s standard line “Structures”
Sidewalks $18,395 · in Transportation · the state’s standard line “Sidewalks”
Street Lighting $116,127 · in Transportation · the state’s standard line “Street Lighting”
Traffic Control Devices $2.9 million · in Transportation · the state’s standard line “Traffic Control Devices”
Snow and Ice Control $290,022 · in Transportation · the state’s standard line “Snow and Ice Control”
Street Cleaning $71,316 · in Transportation · the state’s standard line “Street Cleaning”
Roadside $1.3 million · in Transportation · the state’s standard line “Roadside”
Ancillary Operations $1.1 million · in Transportation · the state’s standard line “Ancillary Operations”
Maintenance Administration and Overhead $7.2 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
Management $5.1 million · in Transportation · the state’s standard line “Management”
General Services $1.9 million · in Transportation · the state’s standard line “General Services”
Facilities $820,139 · in Transportation · the state’s standard line “Facilities”
Engineering $3.5 million · in Transportation · the state’s standard line “Engineering”
Planning $130,182 · in Transportation · the state’s standard line “Planning”
Roads/Streets Extraordinary Operations $288 · in Transportation · the state’s standard line “Roads/Streets Extraordinary Operations” (2024, actual spending)
6Kitsap County, WA281,420$34.8 million$124/res.Roadway $334,081 · in Transportation · the state’s standard line “Roadway”
Drainage $207,793 · in Transportation · the state’s standard line “Drainage”
Sidewalks $14,165 · in Transportation · the state’s standard line “Sidewalks”
Street Lighting $15,144 · in Transportation · the state’s standard line “Street Lighting”
Traffic Control Devices $1.4 million · in Transportation · the state’s standard line “Traffic Control Devices”
Snow and Ice Control $177,455 · in Transportation · the state’s standard line “Snow and Ice Control”
Street Cleaning $308,733 · in Transportation · the state’s standard line “Street Cleaning”
Roadside $647,322 · in Transportation · the state’s standard line “Roadside”
Maintenance Administration and Overhead $2.2 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
Management $9.1 million · in Transportation · the state’s standard line “Management”
General Services $4.7 million · in Transportation · the state’s standard line “General Services”
Facilities $183,567 · in Transportation · the state’s standard line “Facilities”
Engineering $5.9 million · in Transportation · the state’s standard line “Engineering”
Planning $1.6 million · in Transportation · the state’s standard line “Planning”
Operations Administration and Overhead $8.0 million · in Transportation · the state’s standard line “Operations Administration and Overhead” (2025, actual spending)
7Spokane County, WA555,947$34.6 million$62.16/res.Engineering $1,171 · in Transportation · the state’s standard line “Engineering”
Roadway $9.7 million · in Transportation · the state’s standard line “Roadway”
Drainage $43,295 · in Transportation · the state’s standard line “Drainage”
Structures $392,857 · in Transportation · the state’s standard line “Structures”
Sidewalks $9,801 · in Transportation · the state’s standard line “Sidewalks”
Street Lighting $290,351 · in Transportation · the state’s standard line “Street Lighting”
Traffic Control Devices $2.5 million · in Transportation · the state’s standard line “Traffic Control Devices”
Snow and Ice Control $3.3 million · in Transportation · the state’s standard line “Snow and Ice Control”
Street Cleaning $324,491 · in Transportation · the state’s standard line “Street Cleaning”
Roadside $863,364 · in Transportation · the state’s standard line “Roadside”
Ancillary Operations $145,821 · in Transportation · the state’s standard line “Ancillary Operations”
Maintenance Administration and Overhead $2.9 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
Management $282,466 · in Transportation · the state’s standard line “Management”
General Services $5.2 million · in Transportation · the state’s standard line “General Services”
Engineering $1.7 million · in Transportation · the state’s standard line “Engineering”
Planning $763,282 · in Transportation · the state’s standard line “Planning”
Operations Administration and Overhead $6.2 million · in Transportation · the state’s standard line “Operations Administration and Overhead” (2025, actual spending)
8Whatcom County, WA234,954$24.0 million$102/res.Engineering $386,003 · in Transportation · the state’s standard line “Engineering”
Roadway $3.4 million · in Transportation · the state’s standard line “Roadway”
Drainage $2.0 million · in Transportation · the state’s standard line “Drainage”
Structures $518,341 · in Transportation · the state’s standard line “Structures”
Sidewalks $6,985 · in Transportation · the state’s standard line “Sidewalks”
Special Purpose Paths $2,198 · in Transportation · the state’s standard line “Special Purpose Paths”
Street Lighting $73,556 · in Transportation · the state’s standard line “Street Lighting”
Traffic Control Devices $2.0 million · in Transportation · the state’s standard line “Traffic Control Devices”
Snow and Ice Control $893,647 · in Transportation · the state’s standard line “Snow and Ice Control”
Street Cleaning $442,871 · in Transportation · the state’s standard line “Street Cleaning”
Roadside $2.6 million · in Transportation · the state’s standard line “Roadside”
Ancillary Operations −$5,043 · in Transportation · the state’s standard line “Ancillary Operations”
Maintenance Administration and Overhead $4.0 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
Management $1.8 million · in Transportation · the state’s standard line “Management”
General Services $4.8 million · in Transportation · the state’s standard line “General Services”
Facilities $87,612 · in Transportation · the state’s standard line “Facilities”
Planning $737,870 · in Transportation · the state’s standard line “Planning”
Roads/Streets Extraordinary Operations $148,072 · in Transportation · the state’s standard line “Roads/Streets Extraordinary Operations” (2025, actual spending)
9Yakima County, WA258,523$20.2 million$78.18/res.Engineering $7,111 · in Transportation · name contains “engineering”
Engineering $289 · in Transportation · the state’s standard line “Engineering”
Roadway $5.1 million · in Transportation · the state’s standard line “Roadway”
Drainage $833,720 · in Transportation · the state’s standard line “Drainage”
Structures $199,377 · in Transportation · the state’s standard line “Structures”
Sidewalks $15,815 · in Transportation · the state’s standard line “Sidewalks”
Street Lighting $173,405 · in Transportation · the state’s standard line “Street Lighting”
Traffic Control Devices $1.9 million · in Transportation · the state’s standard line “Traffic Control Devices”
Snow and Ice Control $567,848 · in Transportation · the state’s standard line “Snow and Ice Control”
Street Cleaning $84,538 · in Transportation · the state’s standard line “Street Cleaning”
Roadside $1.4 million · in Transportation · the state’s standard line “Roadside”
Maintenance Administration and Overhead $2.5 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
Management $313,678 · in Transportation · the state’s standard line “Management”
General Services $1.6 million · in Transportation · the state’s standard line “General Services”
Engineering $5.5 million · in Transportation · the state’s standard line “Engineering” (2025, actual spending)

Who’s in the group: Counties in the same state with between half and double its population (2024 Census estimate). If fewer than five fit, the eight closest in population. Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.