Stevens County: $239 per resident, 5th highest of 13. The middle of the group is $180; the middle half runs from $167 to $251 (12 counties with figures).
| # | County | Residents | Per resident | Amount | Where it comes from |
|---|---|---|---|---|---|
| 1 | Lewis County, WA | 87,049 | $326 | $28.4 million | Engineering $224,758 · in Transportation · the state’s standard line “Engineering” Roadway $5.3 million · in Transportation · the state’s standard line “Roadway” Drainage $5.1 million · in Transportation · the state’s standard line “Drainage” Structures $2.4 million · in Transportation · the state’s standard line “Structures” Street Lighting $23,080 · in Transportation · the state’s standard line “Street Lighting” Traffic Control Devices $1.1 million · in Transportation · the state’s standard line “Traffic Control Devices” Snow and Ice Control $367,199 · in Transportation · the state’s standard line “Snow and Ice Control” Street Cleaning $32,845 · in Transportation · the state’s standard line “Street Cleaning” Other Traffic and Pedestrian Services $219 · in Transportation · the state’s standard line “Other Traffic and Pedestrian Services” Roadside $1.4 million · in Transportation · the state’s standard line “Roadside” Ancillary Operations $839,174 · in Transportation · the state’s standard line “Ancillary Operations” Maintenance Administration and Overhead $6.8 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead” Management $2.1 million · in Transportation · the state’s standard line “Management” Engineering $1.5 million · in Transportation · the state’s standard line “Engineering” Planning $1.2 million · in Transportation · the state’s standard line “Planning” Operations Administration and Overhead $119,487 · in Transportation · the state’s standard line “Operations Administration and Overhead” (2025, actual spending) |
| 2 | Okanogan County, WA | 44,942 | $259 | $11.6 million | Roadway $4.7 million · in Transportation · the state’s standard line “Roadway” Drainage $352,176 · in Transportation · the state’s standard line “Drainage” Structures $81,021 · in Transportation · the state’s standard line “Structures” Traffic Control Devices $682,627 · in Transportation · the state’s standard line “Traffic Control Devices” Snow and Ice Control $1.5 million · in Transportation · the state’s standard line “Snow and Ice Control” Street Cleaning $157,563 · in Transportation · the state’s standard line “Street Cleaning” Roadside $577,110 · in Transportation · the state’s standard line “Roadside” Ancillary Operations $74,598 · in Transportation · the state’s standard line “Ancillary Operations” Maintenance Administration and Overhead $1.0 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead” Management $193,495 · in Transportation · the state’s standard line “Management” General Services $1.5 million · in Transportation · the state’s standard line “General Services” Facilities $264,551 · in Transportation · the state’s standard line “Facilities” Engineering $108,181 · in Transportation · the state’s standard line “Engineering” Planning $371,749 · in Transportation · the state’s standard line “Planning” (2025, actual spending) |
| 3 | Jefferson County, WA | 33,944 | $251 | $8.5 million | Engineering $2,371 · in Transportation · the state’s standard line “Engineering” Roadway $2.4 million · in Transportation · the state’s standard line “Roadway” Drainage $573,715 · in Transportation · the state’s standard line “Drainage” Structures $26,456 · in Transportation · the state’s standard line “Structures” Sidewalks $5,613 · in Transportation · the state’s standard line “Sidewalks” Special Purpose Paths $3,666 · in Transportation · the state’s standard line “Special Purpose Paths” Street Lighting $13,551 · in Transportation · the state’s standard line “Street Lighting” Traffic Control Devices $517,296 · in Transportation · the state’s standard line “Traffic Control Devices” Snow and Ice Control $303,577 · in Transportation · the state’s standard line “Snow and Ice Control” Street Cleaning $447,535 · in Transportation · the state’s standard line “Street Cleaning” Roadside $963,513 · in Transportation · the state’s standard line “Roadside” Maintenance Administration and Overhead $1.2 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead” Management $415,431 · in Transportation · the state’s standard line “Management” General Services $488,326 · in Transportation · the state’s standard line “General Services” Facilities $144,134 · in Transportation · the state’s standard line “Facilities” Engineering $155,494 · in Transportation · the state’s standard line “Engineering” Planning $257,785 · in Transportation · the state’s standard line “Planning” Operations Administration and Overhead $22,089 · in Transportation · the state’s standard line “Operations Administration and Overhead” Roads/Streets Extraordinary Operations $610,225 · in Transportation · the state’s standard line “Roads/Streets Extraordinary Operations” (2025, actual spending) |
| 4 | Douglas County, WA | 45,795 | $251 | $11.5 million | Roadway $3.1 million · in Transportation · the state’s standard line “Roadway” Drainage $212,417 · in Transportation · the state’s standard line “Drainage” Structures $36,689 · in Transportation · the state’s standard line “Structures” Sidewalks $7,595 · in Transportation · the state’s standard line “Sidewalks” Special Purpose Paths $4,521 · in Transportation · the state’s standard line “Special Purpose Paths” Street Lighting $31,260 · in Transportation · the state’s standard line “Street Lighting” Traffic Control Devices $554,252 · in Transportation · the state’s standard line “Traffic Control Devices” Parking Facilities $2,111 · in Transportation · the state’s standard line “Parking Facilities” Snow and Ice Control $813,938 · in Transportation · the state’s standard line “Snow and Ice Control” Street Cleaning $9,951 · in Transportation · the state’s standard line “Street Cleaning” Roadside $579,942 · in Transportation · the state’s standard line “Roadside” Maintenance Administration and Overhead $1.9 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead” Management $1.5 million · in Transportation · the state’s standard line “Management” General Services $107,367 · in Transportation · the state’s standard line “General Services” Facilities $299,015 · in Transportation · the state’s standard line “Facilities” Engineering $608,644 · in Transportation · the state’s standard line “Engineering” Planning $412,745 · in Transportation · the state’s standard line “Planning” Operations Administration and Overhead $1.3 million · in Transportation · the state’s standard line “Operations Administration and Overhead” (2025, actual spending) |
| 5 | Stevens County, WA | 49,015 | $239 | $11.7 million | Engineering $14,736 · in Transportation · the state’s standard line “Engineering” Roadway $3.8 million · in Transportation · the state’s standard line “Roadway” Drainage $868,128 · in Transportation · the state’s standard line “Drainage” Structures $51,048 · in Transportation · the state’s standard line “Structures” Street Lighting $1,467 · in Transportation · the state’s standard line “Street Lighting” Traffic Control Devices $3.1 million · in Transportation · the state’s standard line “Traffic Control Devices” Snow and Ice Control $234,293 · in Transportation · the state’s standard line “Snow and Ice Control” Other Traffic and Pedestrian Services $118,537 · in Transportation · the state’s standard line “Other Traffic and Pedestrian Services” Roadside $1.2 million · in Transportation · the state’s standard line “Roadside” Maintenance Administration and Overhead $678,224 · in Transportation · the state’s standard line “Maintenance Administration and Overhead” Management $719,415 · in Transportation · the state’s standard line “Management” General Services $425,204 · in Transportation · the state’s standard line “General Services” Facilities $112,209 · in Transportation · the state’s standard line “Facilities” Engineering $130,637 · in Transportation · the state’s standard line “Engineering” Planning $122,239 · in Transportation · the state’s standard line “Planning” Operations Administration and Overhead $72,587 · in Transportation · the state’s standard line “Operations Administration and Overhead” (2025, actual spending) |
| 6 | Whitman County, WA | 48,399 | $222 | $10.7 million | Engineering $927 · in Transportation · the state’s standard line “Engineering” Roadway $3.7 million · in Transportation · the state’s standard line “Roadway” Drainage $369,717 · in Transportation · the state’s standard line “Drainage” Structures $186,388 · in Transportation · the state’s standard line “Structures” Traffic Control Devices $265,106 · in Transportation · the state’s standard line “Traffic Control Devices” Snow and Ice Control $270,858 · in Transportation · the state’s standard line “Snow and Ice Control” Roadside $252,146 · in Transportation · the state’s standard line “Roadside” Ancillary Operations $96,747 · in Transportation · the state’s standard line “Ancillary Operations” Maintenance Administration and Overhead $272,846 · in Transportation · the state’s standard line “Maintenance Administration and Overhead” Management $76,238 · in Transportation · the state’s standard line “Management” General Services $5.1 million · in Transportation · the state’s standard line “General Services” Facilities $5,882 · in Transportation · the state’s standard line “Facilities” Engineering $117,693 · in Transportation · the state’s standard line “Engineering” Planning $4,599 · in Transportation · the state’s standard line “Planning” (2025, actual spending) |
| 7 | Kittitas County, WA | 48,172 | $189 | $9.1 million | Engineering $113,614 · in Transportation · name contains “engineering” Engineering $130,043 · in Transportation · the state’s standard line “Engineering” Roadway $712,450 · in Transportation · the state’s standard line “Roadway” Drainage $672,617 · in Transportation · the state’s standard line “Drainage” Structures $98,596 · in Transportation · the state’s standard line “Structures” Special Purpose Paths $3,365 · in Transportation · the state’s standard line “Special Purpose Paths” Street Lighting $1,797 · in Transportation · the state’s standard line “Street Lighting” Traffic Control Devices $690,672 · in Transportation · the state’s standard line “Traffic Control Devices” Snow and Ice Control $566,178 · in Transportation · the state’s standard line “Snow and Ice Control” Roadside $996,382 · in Transportation · the state’s standard line “Roadside” Ancillary Operations $35,584 · in Transportation · the state’s standard line “Ancillary Operations” Maintenance Administration and Overhead $803,750 · in Transportation · the state’s standard line “Maintenance Administration and Overhead” Management $2.3 million · in Transportation · the state’s standard line “Management” Facilities $869,352 · in Transportation · the state’s standard line “Facilities” Engineering $492,766 · in Transportation · the state’s standard line “Engineering” Planning $631,648 · in Transportation · the state’s standard line “Planning” (2025, actual spending) |
| 8 | Mason County, WA | 69,632 | $171 | $11.9 million | Engineering $8.0 million · in Transportation · the state’s standard line “Engineering” Management $2.5 million · in Transportation · the state’s standard line “Management” Engineering $1.4 million · in Transportation · the state’s standard line “Engineering” (2025, actual spending) |
| 9 | Grays Harbor County, WA | 77,893 | $171 | $13.3 million | Roadway $4.0 million · in Transportation · the state’s standard line “Roadway” Drainage $428,011 · in Transportation · the state’s standard line “Drainage” Structures $74,645 · in Transportation · the state’s standard line “Structures” Traffic Control Devices $1.0 million · in Transportation · the state’s standard line “Traffic Control Devices” Snow and Ice Control $578,295 · in Transportation · the state’s standard line “Snow and Ice Control” Street Cleaning $199,837 · in Transportation · the state’s standard line “Street Cleaning” Roadside $1.6 million · in Transportation · the state’s standard line “Roadside” Ancillary Operations $814,562 · in Transportation · the state’s standard line “Ancillary Operations” Maintenance Administration and Overhead $2.5 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead” General Services $653,585 · in Transportation · the state’s standard line “General Services” Engineering $966,953 · in Transportation · the state’s standard line “Engineering” Planning $20,643 · in Transportation · the state’s standard line “Planning” Operations Administration and Overhead $420,107 · in Transportation · the state’s standard line “Operations Administration and Overhead” Roads/Streets Extraordinary Operations $63,572 · in Transportation · the state’s standard line “Roads/Streets Extraordinary Operations” (2025, actual spending) |
| 10 | Clallam County, WA | 77,958 | $167 | $13.1 million | Roadway $3.1 million · in Transportation · the state’s standard line “Roadway” Drainage $447,468 · in Transportation · the state’s standard line “Drainage” Structures $160,363 · in Transportation · the state’s standard line “Structures” Other Traffic and Pedestrian Services $1.8 million · in Transportation · the state’s standard line “Other Traffic and Pedestrian Services” Roadside $1.2 million · in Transportation · the state’s standard line “Roadside” Maintenance Administration and Overhead $1.7 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead” Management $67,986 · in Transportation · the state’s standard line “Management” General Services $2.5 million · in Transportation · the state’s standard line “General Services” Facilities $181,840 · in Transportation · the state’s standard line “Facilities” Engineering $542,437 · in Transportation · the state’s standard line “Engineering” Planning $118,463 · in Transportation · the state’s standard line “Planning” Operations Administration and Overhead $1.3 million · in Transportation · the state’s standard line “Operations Administration and Overhead” (2025, actual spending) |
| 11 | Walla Walla County, WA | 62,068 | $164 | $10.2 million | Roadway $4.6 million · in Transportation · the state’s standard line “Roadway” Drainage $589,827 · in Transportation · the state’s standard line “Drainage” Structures $15,215 · in Transportation · the state’s standard line “Structures” Street Lighting $5,364 · in Transportation · the state’s standard line “Street Lighting” Traffic Control Devices $359,618 · in Transportation · the state’s standard line “Traffic Control Devices” Snow and Ice Control $348,836 · in Transportation · the state’s standard line “Snow and Ice Control” Street Cleaning $43,516 · in Transportation · the state’s standard line “Street Cleaning” Roadside $629,748 · in Transportation · the state’s standard line “Roadside” Maintenance Administration and Overhead $555,686 · in Transportation · the state’s standard line “Maintenance Administration and Overhead” Management $335,767 · in Transportation · the state’s standard line “Management” General Services $1.8 million · in Transportation · the state’s standard line “General Services” Facilities $314,471 · in Transportation · the state’s standard line “Facilities” Engineering $207,593 · in Transportation · the state’s standard line “Engineering” Planning $213,340 · in Transportation · the state’s standard line “Planning” Operations Administration and Overhead $133,312 · in Transportation · the state’s standard line “Operations Administration and Overhead” (2025, actual spending) |
| 12 | Island County, WA | 86,478 | $163 | $14.1 million | Roadway $2.5 million · in Transportation · the state’s standard line “Roadway” Drainage $752,403 · in Transportation · the state’s standard line “Drainage” Sidewalks $242 · in Transportation · the state’s standard line “Sidewalks” Special Purpose Paths $9,442 · in Transportation · the state’s standard line “Special Purpose Paths” Street Lighting $23,180 · in Transportation · the state’s standard line “Street Lighting” Traffic Control Devices $1.3 million · in Transportation · the state’s standard line “Traffic Control Devices” Parking Facilities $1,559 · in Transportation · the state’s standard line “Parking Facilities” Snow and Ice Control $231,540 · in Transportation · the state’s standard line “Snow and Ice Control” Street Cleaning $467,592 · in Transportation · the state’s standard line “Street Cleaning” Roadside $1.1 million · in Transportation · the state’s standard line “Roadside” Ancillary Operations $4,430 · in Transportation · the state’s standard line “Ancillary Operations” Maintenance Administration and Overhead $343,931 · in Transportation · the state’s standard line “Maintenance Administration and Overhead” Management $810,967 · in Transportation · the state’s standard line “Management” General Services $1.3 million · in Transportation · the state’s standard line “General Services” Facilities $17,189 · in Transportation · the state’s standard line “Facilities” Engineering $1.1 million · in Transportation · the state’s standard line “Engineering” Planning $601,904 · in Transportation · the state’s standard line “Planning” Operations Administration and Overhead $3.5 million · in Transportation · the state’s standard line “Operations Administration and Overhead” (2025, actual spending) |
| 13 | Chelan County, WA | 81,228 | $153 | $12.4 million | Roadway $3.8 million · in Transportation · the state’s standard line “Roadway” Drainage $401,713 · in Transportation · the state’s standard line “Drainage” Structures $54,473 · in Transportation · the state’s standard line “Structures” Sidewalks $3,203 · in Transportation · the state’s standard line “Sidewalks” Special Purpose Paths $218 · in Transportation · the state’s standard line “Special Purpose Paths” Street Lighting $19,775 · in Transportation · the state’s standard line “Street Lighting” Traffic Control Devices $623,827 · in Transportation · the state’s standard line “Traffic Control Devices” Snow and Ice Control $2.1 million · in Transportation · the state’s standard line “Snow and Ice Control” Street Cleaning $263,457 · in Transportation · the state’s standard line “Street Cleaning” Roadside $539,548 · in Transportation · the state’s standard line “Roadside” Maintenance Administration and Overhead $1.3 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead” Management $222,701 · in Transportation · the state’s standard line “Management” General Services $1.3 million · in Transportation · the state’s standard line “General Services” Facilities $179,094 · in Transportation · the state’s standard line “Facilities” Engineering $1.5 million · in Transportation · the state’s standard line “Engineering” Roads/Streets Extraordinary Operations $134,429 · in Transportation · the state’s standard line “Roads/Streets Extraordinary Operations” (2023, actual spending) |
Who’s in the group: Counties in the same state with between half and double its population (2024 Census estimate). If fewer than five fit, the eight closest in population. Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.