How Niobrara County compares · From the counties’ own budgets, line by line

Roads and bridges: Niobrara County beside counties of similar size in Wyoming

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Niobrara County: $321 per resident, 5th highest of 9. The middle of the group is $356; the middle half runs from $218 to $560 (8 counties with figures).

#CountyResidentsPer residentAmountWhere it comes from
1Sublette County, WY8,965$1,790$16.1 millionRoad and bridge $6.3 million · in Roads and bridges · name contains “road”
Road and bridge (construction) $8.0 million · in Roads and bridges · name contains “road”
Road and bridge (equipment, land and buildings) $1.8 million · in Roads and bridges · name contains “road” (2025, actual spending, all county funds, not separate boards only)
2Crook County, WY7,775$616$4.8 millionRoad and bridge $1.5 million · in Roads and bridges · name contains “road”
Road and bridge (construction) $3.3 million · in Roads and bridges · name contains “road”
Road and bridge (equipment, land and buildings) $51,791 · in Roads and bridges · name contains “road” (2025, actual spending, all county funds, not separate boards only)
3Johnson County, WY8,803$541$4.8 millionRoad and bridge $2.8 million · in Roads and bridges · name contains “road”
Road and bridge (construction) $2.0 million · in Roads and bridges · name contains “road”
Road and bridge (equipment, land and buildings) $3,243 · in Roads and bridges · name contains “road” (2025, actual spending, all county funds, not separate boards only)
4Hot Springs County, WY4,625$451$2.1 millionRoad and bridge $568,212 · in Roads and bridges · name contains “road”
Road and bridge (construction) $1.2 million · in Roads and bridges · name contains “road”
Road and bridge (equipment, land and buildings) $342,847 · in Roads and bridges · name contains “road” (2025, actual spending, all county funds, not separate boards only)
5Niobrara County, WY2,301$321$738,946Road and bridge $503,457 · in Roads and bridges · name contains “road”
Road and bridge (construction) $158,360 · in Roads and bridges · name contains “road”
Road and bridge (equipment, land and buildings) $77,129 · in Roads and bridges · name contains “road” (2025, actual spending, all county funds, not separate boards only)
6Platte County, WY8,512$261$2.2 millionRoad and bridge $1.2 million · in Roads and bridges · name contains “road”
Road and bridge (construction) $340,475 · in Roads and bridges · name contains “road”
Road and bridge (equipment, land and buildings) $705,253 · in Roads and bridges · name contains “road” (2025, actual spending, all county funds, not separate boards only)
7Weston County, WY6,866$236$1.6 millionRoad and bridge $838,561 · in Roads and bridges · name contains “road”
Road and bridge (construction) $771,324 · in Roads and bridges · name contains “road”
Road and bridge (equipment, land and buildings) $13,483 · in Roads and bridges · name contains “road” (2025, actual spending, all county funds, not separate boards only)
8Big Horn County, WY12,084$161$1.9 millionRoad and bridge $1.2 million · in Roads and bridges · name contains “road”
Road and bridge (construction) $420,684 · in Roads and bridges · name contains “road”
Road and bridge (equipment, land and buildings) $360,047 · in Roads and bridges · name contains “road” (2025, actual spending, all county funds, not separate boards only)
9Washakie County, WY7,662$120$921,304Road and bridge $921,304 · in Roads and bridges · name contains “road” (2025, actual spending, all county funds, not separate boards only)

Who’s in the group: Counties in the same state with between half and double its population (2024 Census estimate). If fewer than five fit, the eight closest in population. Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.