How DeKalb County compares · From the counties’ own budgets, line by line

Utilities (water, sewer, power, airport, port, transit): DeKalb County beside neighboring counties (within 60 miles)

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Dead end: DeKalb County has no figure for this yet — its own budget hasn’t been read. Ask for it. The middle of the group is $9.65; the middle half runs from $0.00 to $28.57 (13 counties with figures, 4 of them at $0).

#CountyResidentsPer residentAmountWhere it comes from
1Bartow County, GA117,508$250$29.4 millionWater and Sewer System $29.4 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
2Floyd County, GA101,390$139$14.1 millionStorm Drainage $147,571 · in Public Works · the state’s standard line “Storm Drainage”
Water $6.0 million · in Public Works · the state’s standard line “Water”
Water and Sewer System $6.1 million · in Utility systems · the state’s standard line “Water and Sewer System”
Airport $1.8 million · in Utility systems · the state’s standard line “Airport” (2023, actual spending, operations and capital, including utility systems, not debt only)
3Chattooga County, GA25,306$63.73$1.6 millionWater and Sewer System $1.6 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
4Catoosa County, GA68,940$28.57$2.0 millionStorm Drainage $2.0 million · in Public Works · the state’s standard line “Storm Drainage” (2024, actual spending, operations and capital, including utility systems, not debt only)
5Walker County, GA69,340$20.59$1.4 millionWater $11,764 · in Public Works · the state’s standard line “Water”
Telecommunications (Broadband) $1.4 million · in Public Works · the state’s standard line “Telecommunications (Broadband)” (2024, actual spending, operations and capital, including utility systems, not debt only)
6Whitfield County, GA105,070$14.62$1.5 millionStorm Drainage $222,219 · in Public Works · the state’s standard line “Storm Drainage”
Wastewater $1.3 million · in Public Works · the state’s standard line “Wastewater” (2024, actual spending, operations and capital, including utility systems, not debt only)
7Marion County, TN29,826$9.65$287,902Airport $287,902 · in Other Operations · name contains “airport” (2025, actual spending, governmental funds, including schools only)
8Franklin County, TN45,137$5.48$247,543Airport $247,543 · in Other Operations · name contains “airport” (2025, actual spending, governmental funds, including schools only)
9Haralson County, GA32,404$0.00$12Water $12 · in Public Works · the state’s standard line “Water” (2024, actual spending, operations and capital, including utility systems, not debt only)
10Dade County, GA16,068$0.00$0no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
11Gordon County, GA60,765$0.00$0no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
12Polk County, GA44,610$0.00$0no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
13Hamilton County, TN386,256$0.00$0no line matched in this budget (2025, actual spending, governmental funds, including schools only)

Dead ends — 10 counties in this group with no figure yet (their own budgets haven’t been read): Blount, Calhoun, Cherokee, Cleburne, Etowah, Jackson, Madison, Marshall, Morgan, St. Clair.

Who’s in the group: Counties whose geographic center is within 60 miles of its center, in any state (2024 Census Gazetteer). Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.