How Henderson County compares · From the counties’ own budgets, line by line

Roads and bridges: Henderson County beside counties of similar size across the nation

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Henderson County: $2.0 million, 92nd highest of 110. The middle of the group is $12.0 million; the middle half runs from $7.1 million to $18.0 million (109 counties with figures, 14 of them at $0).

#CountyResidentsAmountPer residentWhere it comes from
1Carver County, MN112,628$71.7 million$636/res.Administration $1.4 million · in Streets and Highways · the state’s standard line “Administration”
Maintenance $10.3 million · in Streets and Highways · the state’s standard line “Maintenance”
Engineering $3.3 million · in Streets and Highways · the state’s standard line “Engineering”
Construction $56.7 million · in Streets and Highways · the state’s standard line “Construction” (2024, actual spending, governmental funds, not utilities only)
2Napa County, CA132,727$58.7 million$442/res.Roads $44.3 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Roads”
Other Public Ways and Facilities $14.4 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Other Public Ways and Facilities” (2025, actual spending)
3Nassau County, FL104,376$52.6 million$504/res.Road and Street Facilities $51.4 million · in Transportation · the state’s standard line “Road and Street Facilities”
Other Transportation Systems / Services $1.2 million · in Transportation · the state’s standard line “Other Transportation Systems / Services” (2025, actual spending, governmental and business funds, including transfers only)
4Humboldt County, CA132,380$49.4 million$373/res.Roads $46.7 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Roads”
Transportation Systems $2.7 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Transportation Systems”
Other Public Ways and Facilities $49,599 · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Other Public Ways and Facilities” (2025, actual spending)
5Newton County, GA124,010$45.1 million$363/res.Public Works Administration $14.8 million · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $30.2 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
6Hampton city, VA137,596$35.0 million$254/res.Maintenance of Highways, Streets, Bridges, and Sidewalks $35.0 million · in Public Works · the state’s standard line “Maintenance of Highways, Streets, Bridges, and Sidewalks” (2025, actual spending, day-to-day operations, including the school division only)
7Eaton County, MI109,494$34.2 million$312/res.Public Works (Non-Act 51) $7.4 million · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $26.8 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
8Suffolk city, VA103,105$33.5 million$325/res.Maintenance of Highways, Streets, Bridges, and Sidewalks $33.5 million · in Public Works · the state’s standard line “Maintenance of Highways, Streets, Bridges, and Sidewalks” (2025, actual spending, day-to-day operations, including the school division only)
9Grand Traverse County, MI96,625$30.7 million$317/res.Public Works (Non-Act 51) $9.1 million · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $21.5 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
10St. Lawrence County, NY106,198$30.4 million$286/res.Maintenance of Roads $12.2 million · in Transportation · name contains “roads”
Maintenance of Bridges $7.1 million · in Transportation · name contains “bridges”
Snow Removal $3.8 million · in Transportation · the state’s standard line “Snow Removal”
Machinery $4.2 million · in Transportation · the state’s standard line “Machinery”
Snow Removal, State $1.9 million · in Transportation · the state’s standard line “Snow Removal, State”
Highway and Street Administration $388,645 · in Transportation · name contains “highway”
Highway Services for Other Governments $466,974 · in Transportation · name contains “highway”
Engineering $201,561 · in Transportation · name contains “engineering”
Water Transportation and Distribution $184,087 · in Utilities · name contains “transportation” (2024, actual spending)
11Allegan County, MI122,429$30.3 million$247/res.Public Works (Non-Act 51) $14,290 · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $30.2 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
12Bonneville County, ID133,644$29.7 million$222/res.Road and Bridge $28.6 million · name contains “road”
Road Special $1.1 million · name contains “road” (2025)
13Sherburne County, MN103,059$29.6 million$287/res.Administration $577,736 · in Streets and Highways · the state’s standard line “Administration”
Maintenance $5.8 million · in Streets and Highways · the state’s standard line “Maintenance”
Construction $21.7 million · in Streets and Highways · the state’s standard line “Construction”
All other streets and highways: buildings and equipment $1.5 million · in Streets and Highways · the state’s standard line “All other streets and highways: buildings and equipment” (2024, actual spending, governmental funds, not utilities only)
14Garland County, AR99,902$29.6 million$296/res.County Road Fund $13.6 million · name contains “road”
County Road & Bridge Improvement $16.0 million · name contains “road” (2026)
15St. Mary's County, MD116,469$27.1 million$233/res.Transportation $27.1 million · in Public Works · the state’s standard line “Transportation” (2024, actual spending, county government, including transfers to school and other boards only)
16Bay County, MI102,651$25.2 million$246/res.Public Works (Non-Act 51) $771,063 · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $24.4 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
17Calhoun County, MI133,785$24.8 million$186/res.Public Works (Non-Act 51) $700,873 · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $24.1 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
18Wicomico County, MD106,329$24.4 million$229/res.Transportation $24.4 million · in Public Works · the state’s standard line “Transportation” (2024, actual spending, county government, including transfers to school and other boards only)
19Skagit County, WA132,736$23.5 million$177/res.Roadway $5.5 million · in Transportation · the state’s standard line “Roadway”
Drainage $1.2 million · in Transportation · the state’s standard line “Drainage”
Structures $35,858 · in Transportation · the state’s standard line “Structures”
Special Purpose Paths $104,325 · in Transportation · the state’s standard line “Special Purpose Paths”
Other Traffic and Pedestrian Services $2.5 million · in Transportation · the state’s standard line “Other Traffic and Pedestrian Services”
Roadside $1.6 million · in Transportation · the state’s standard line “Roadside”
Ancillary Operations $4.7 million · in Transportation · the state’s standard line “Ancillary Operations”
Maintenance Administration and Overhead $1.9 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
Management $2.8 million · in Transportation · the state’s standard line “Management”
General Services $421,351 · in Transportation · the state’s standard line “General Services”
Facilities $135,105 · in Transportation · the state’s standard line “Facilities”
Engineering $1.3 million · in Transportation · the state’s standard line “Engineering”
Planning $769,704 · in Transportation · the state’s standard line “Planning”
Roads/Streets Extraordinary Operations $650,537 · in Transportation · the state’s standard line “Roads/Streets Extraordinary Operations” (2025, actual spending)
20Highlands County, FL109,778$21.7 million$197/res.Road and Street Facilities $21.4 million · in Transportation · the state’s standard line “Road and Street Facilities”
Other Transportation Systems / Services $243,909 · in Transportation · the state’s standard line “Other Transportation Systems / Services” (2024, actual spending, governmental and business funds, including transfers only)
21Faulkner County, AR131,611$21.5 million$164/res.County Road $12.3 million · name contains “road”
County Road Sales Tax $9.2 million · name contains “road” (2026)
22Sheboygan County, WI118,331$21.0 million$177/res.Highway Maintenance and Administration $12.9 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $5.7 million · in Transportation · the state’s standard line “Highway Construction”
Road-Related Facilities $357,458 · in Transportation · the state’s standard line “Road-Related Facilities”
Other Transportation $2.0 million · in Transportation · the state’s standard line “Other Transportation” (2024, actual spending, governmental funds, including transfers only)
23Flagler County, FL136,744$20.0 million$146/res.Road and Street Facilities $20.0 million · in Transportation · the state’s standard line “Road and Street Facilities” (2025, actual spending, governmental and business funds, including transfers only)
24Cecil County, MD106,305$19.2 million$180/res.Transportation $19.2 million · in Public Works · the state’s standard line “Transportation” (2024, actual spending, county government, including transfers to school and other boards only)
25Lenawee County, MI97,746$19.1 million$196/res.Public Works (Non-Act 51) $190,179 · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $18.9 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
26Grant County, WA104,717$18.9 million$180/res.Engineering $3,329 · in Transportation · the state’s standard line “Engineering”
Roadway $5.8 million · in Transportation · the state’s standard line “Roadway”
Drainage $477,996 · in Transportation · the state’s standard line “Drainage”
Structures $188,857 · in Transportation · the state’s standard line “Structures”
Sidewalks $4,032 · in Transportation · the state’s standard line “Sidewalks”
Street Lighting $7,118 · in Transportation · the state’s standard line “Street Lighting”
Traffic Control Devices $1.5 million · in Transportation · the state’s standard line “Traffic Control Devices”
Snow and Ice Control $593,959 · in Transportation · the state’s standard line “Snow and Ice Control”
Street Cleaning $194,812 · in Transportation · the state’s standard line “Street Cleaning”
Roadside $975,907 · in Transportation · the state’s standard line “Roadside”
Maintenance Administration and Overhead $292,388 · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
Management $294,670 · in Transportation · the state’s standard line “Management”
General Services $7.0 million · in Transportation · the state’s standard line “General Services”
Facilities $639,355 · in Transportation · the state’s standard line “Facilities”
Engineering $534,980 · in Transportation · the state’s standard line “Engineering”
Planning $355,063 · in Transportation · the state’s standard line “Planning” (2024, actual spending)
27Jefferson County, NY113,140$18.2 million$161/res.Maintenance of Bridges $5.8 million · in Transportation · name contains “bridges”
Snow Removal $3.8 million · in Transportation · the state’s standard line “Snow Removal”
Maintenance of Roads $4.5 million · in Transportation · name contains “roads”
Machinery $3.3 million · in Transportation · the state’s standard line “Machinery”
Highway and Street Administration $340,168 · in Transportation · name contains “highway”
Engineering $333,023 · in Transportation · name contains “engineering” (2024, actual spending)
28Cowlitz County, WA113,982$18.0 million$158/res.Roadway $6.1 million · in Transportation · the state’s standard line “Roadway”
Drainage $1.3 million · in Transportation · the state’s standard line “Drainage”
Sidewalks $1,714 · in Transportation · the state’s standard line “Sidewalks”
Street Lighting $14,970 · in Transportation · the state’s standard line “Street Lighting”
Traffic Control Devices $1.2 million · in Transportation · the state’s standard line “Traffic Control Devices”
Snow and Ice Control $294,976 · in Transportation · the state’s standard line “Snow and Ice Control”
Street Cleaning $575,025 · in Transportation · the state’s standard line “Street Cleaning”
Roadside $1.2 million · in Transportation · the state’s standard line “Roadside”
Ancillary Operations $818,671 · in Transportation · the state’s standard line “Ancillary Operations”
Maintenance Administration and Overhead $1.0 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
Management $14,700 · in Transportation · the state’s standard line “Management”
General Services $4.1 million · in Transportation · the state’s standard line “General Services”
Facilities $292,586 · in Transportation · the state’s standard line “Facilities”
Engineering $756,017 · in Transportation · the state’s standard line “Engineering”
Planning $125,610 · in Transportation · the state’s standard line “Planning”
Roads/Streets Extraordinary Operations $138,979 · in Transportation · the state’s standard line “Roads/Streets Extraordinary Operations” (2025, actual spending)
29Bartow County, GA117,508$17.7 million$150/res.Roads, Streets, and Bridges $17.7 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
30Chautauqua County, NY124,105$16.8 million$135/res.Engineer $3,092 · in General Government · name contains “engineer”
Maintenance of Roads $7.1 million · in Transportation · name contains “roads”
Machinery $6.7 million · in Transportation · the state’s standard line “Machinery”
Snow Removal $2.2 million · in Transportation · the state’s standard line “Snow Removal”
Engineering $480,945 · in Transportation · name contains “engineering”
Highway and Street Administration $348,629 · in Transportation · name contains “highway” (2024, actual spending)
31Marathon County, WI139,091$16.3 million$117/res.Highway Maintenance and Administration $7.1 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $9.2 million · in Transportation · the state’s standard line “Highway Construction” (2024, actual spending, governmental funds, including transfers only)
32Clarke County, GA129,995$16.2 million$124/res.Public Works Administration $511,835 · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $15.6 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
33Laramie County, WY101,783$16.1 million$158/res.Road and bridge $8.1 million · in Roads and bridges · name contains “road”
Road and bridge (construction) $7.7 million · in Roads and bridges · name contains “road”
Road and bridge (equipment, land and buildings) $276,159 · in Roads and bridges · name contains “road” (2025, actual spending, all county funds, not separate boards only)
34Fond du Lac County, WI104,269$15.7 million$150/res.Highway Maintenance and Administration $8.3 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $6.0 million · in Transportation · the state’s standard line “Highway Construction”
Road-Related Facilities $1.4 million · in Transportation · the state’s standard line “Road-Related Facilities” (2024, actual spending, governmental funds, including transfers only)
35Washington County, WI138,727$15.5 million$112/res.Highway Maintenance and Administration $3.5 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $8.6 million · in Transportation · the state’s standard line “Highway Construction”
Road-Related Facilities $289,051 · in Transportation · the state’s standard line “Road-Related Facilities”
Other Transportation $3.1 million · in Transportation · the state’s standard line “Other Transportation” (2024, actual spending, governmental funds, including transfers only)
36Saline County, AR131,252$15.3 million$116/res.County Road Fund $14.3 million · name contains “road”
Additional Motor Fuel Tax Fund $1.0 million · name contains “motor fuel” (2026)
37Whitfield County, GA105,070$15.2 million$145/res.Roads, Streets, and Bridges $15.2 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
38Dubuque County, IA99,242$14.6 million$147/res.Roads & Transportation $14.6 million · in Roads & Transportation · the state’s standard line “Roads & Transportation” (2027)
39Eau Claire County, WI108,830$14.5 million$133/res.Highway Maintenance and Administration $7.5 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $6.8 million · in Transportation · the state’s standard line “Highway Construction”
Other Transportation $105,819 · in Transportation · the state’s standard line “Other Transportation” (2024, actual spending, governmental funds, including transfers only)
40Fayette County, GA125,107$14.4 million$115/res.General Engineering $217,800 · in General Government · the state’s standard line “General Engineering”
Public Works Administration $428,761 · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $13.8 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
41Hanover County, VA115,309$14.2 million$123/res.Maintenance of Highways, Streets, Bridges, and Sidewalks $14.2 million · in Public Works · the state’s standard line “Maintenance of Highways, Streets, Bridges, and Sidewalks” (2025, actual spending, day-to-day operations, including the school division only)
42Sevier County, TN100,184$14.2 million$141/res.Litter and Trash Collection $461,715 · in Highways · the state’s standard line “Litter and Trash Collection”
Other Charges $865,734 · in Highways · the state’s standard line “Other Charges”
Administration $360,709 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $8.7 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $1.7 million · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Quarry Operations $174,449 · in Highways · the state’s standard line “Quarry Operations”
Traffic Control $148,089 · in Highways · the state’s standard line “Traffic Control”
Capital Outlay $1.8 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
43Blount County, TN142,211$14.1 million$99.13/res.Litter and Trash Collection $231,924 · in Highways · the state’s standard line “Litter and Trash Collection”
Administration $1.8 million · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $10.8 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $1.2 million · in Highways · the state’s standard line “Operation and Maintenance of Equipment” (2025, actual spending, governmental funds, including schools only)
44Rockdale County, GA97,610$14.1 million$144/res.Public Works Administration $1.1 million · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $13.0 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
45Nevada County, CA102,195$13.8 million$135/res.Roads $13.3 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Roads”
Other Public Ways and Facilities $445,521 · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Other Public Ways and Facilities” (2025, actual spending)
46Walworth County, WI106,029$13.7 million$129/res.Highway Maintenance and Administration $5.4 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $5.9 million · in Transportation · the state’s standard line “Highway Construction”
Other Transportation $2.4 million · in Transportation · the state’s standard line “Other Transportation” (2024, actual spending, governmental funds, including transfers only)
47Bastrop County, TX114,931$13.7 million$119/res.Road & Bridge — Precinct 1 $2.9 million · in Road & Bridge Fund · name contains “road”
Road & Bridge — Precinct 2 $4.2 million · in Road & Bridge Fund · name contains “road”
Road & Bridge — Precinct 3 $3.4 million · in Road & Bridge Fund · name contains “road”
Road & Bridge — Precinct 4 $3.3 million · in Road & Bridge Fund · name contains “road” (2026)
48Madison County, TN100,409$13.7 million$136/res.Administration $645,356 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $3.7 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $465,885 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $189,451 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $8.7 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
49Monroe County, IN140,702$13.4 million$95.41/res.Highway $6.9 million · in Roads and bridges · name contains “highway”
County Major Bridge $3.7 million · in Roads and bridges · name contains “bridge”
Local Road & Street $1.6 million · in Roads and bridges · name contains “road”
Cumulative Bridge $1.4 million · in Roads and bridges · name contains “bridge”
County Offender Transportation $2,500 · in Roads and bridges · name contains “transportation”
Highway Special $1 · in Roads and bridges · name contains “highway” (2026, all county funds, as adopted (before state review) only)
50Oswego County, NY118,305$13.4 million$113/res.Snow Removal $4.0 million · in Transportation · the state’s standard line “Snow Removal”
Maintenance of Roads $5.0 million · in Transportation · name contains “roads”
Machinery $2.9 million · in Transportation · the state’s standard line “Machinery”
Snow Removal, State $940,420 · in Transportation · the state’s standard line “Snow Removal, State”
Highway and Street Administration $331,837 · in Transportation · name contains “highway”
Engineering $193,845 · in Transportation · name contains “engineering” (2024, actual spending)
51Lowndes County, GA122,082$13.3 million$109/res.General Engineering $736,907 · in General Government · the state’s standard line “General Engineering”
Public Works Administration $667,098 · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $11.9 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
52Woodbury County, IA107,257$12.7 million$119/res.Roads & Transportation $12.7 million · in Roads & Transportation · the state’s standard line “Roads & Transportation” (2027)
53Maury County, TN113,411$12.3 million$108/res.Administration $306,668 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $7.6 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $3.4 million · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $454,820 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $608,356 · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
54LaPorte County, IN111,348$12.1 million$108/res.Highway $8.7 million · in Roads and bridges · name contains “highway”
Local Road & Street $1.2 million · in Roads and bridges · name contains “road”
County Major Bridge $1.1 million · in Roads and bridges · name contains “bridge”
Cumulative Bridge $1.1 million · in Roads and bridges · name contains “bridge” (2026, all county funds, as adopted (before state review) only)
55Dallas County, IA115,343$12.0 million$104/res.Roads & Transportation $12.0 million · in Roads & Transportation · the state’s standard line “Roads & Transportation” (2027)
56Roanoke city, VA97,912$12.0 million$122/res.Maintenance of Highways, Streets, Bridges, and Sidewalks $12.0 million · in Public Works · the state’s standard line “Maintenance of Highways, Streets, Bridges, and Sidewalks” (2025, actual spending, day-to-day operations, including the school division only)
57Sutter County, CA98,545$12.0 million$122/res.Roads $11.7 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Roads”
Transportation Terminals $18,973 · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Transportation Terminals”
Transportation Systems $287,504 · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Transportation Systems” (2025, actual spending)
58Craighead County, AR115,852$11.9 million$102/res.County Road Department Fund $11.5 million · name contains “road”
Additional Motor Fuel Tax Fund (Act 416 of 2019) $377,000 · name contains “motor fuel” (2026)
59Putnam County, NY98,409$11.8 million$120/res.Public Works Administration $696,828 · in General Government · name contains “public works”
Engineer $540,891 · in General Government · name contains “engineer”
Other Transportation $4.7 million · in Transportation · name contains “transportation”
Maintenance of Roads $2.6 million · in Transportation · name contains “roads”
Machinery $1.9 million · in Transportation · the state’s standard line “Machinery”
Snow Removal $880,541 · in Transportation · the state’s standard line “Snow Removal”
Snow Removal, State $505,050 · in Transportation · the state’s standard line “Snow Removal, State” (2024, actual spending)
60St. Croix County, WI97,954$11.8 million$120/res.Highway Maintenance and Administration $9.8 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $2.0 million · in Transportation · the state’s standard line “Highway Construction” (2024, actual spending, governmental funds, including transfers only)
61DeKalb County, IL101,335$11.7 million$115/res.Streets and Highways $11.7 million · in Transportation and Public Works · the state’s standard line “Streets and Highways” (2025, actual spending, governmental funds and county-run businesses only)
62Floyd County, GA101,390$11.5 million$113/res.General Engineering $257,145 · in General Government · the state’s standard line “General Engineering”
Public Works Administration $7.3 million · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $3.9 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2023, actual spending, operations and capital, including utility systems, not debt only)
63LaSalle County, IL108,390$11.3 million$104/res.Streets and Highways $11.3 million · in Transportation and Public Works · the state’s standard line “Streets and Highways” (2025, actual spending, governmental funds and county-run businesses only)
64Carroll County, GA129,911$11.0 million$84.71/res.Roads, Streets, and Bridges $11.0 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
65Vigo County, IN106,166$10.8 million$102/res.Highway $6.2 million · in Roads and bridges · name contains “highway”
Local Road Matching Grant / Community Crossings $2.0 million · in Roads and bridges · name contains “road”
Local Road & Street $1.3 million · in Roads and bridges · name contains “road”
Cumulative Bridge $968,700 · in Roads and bridges · name contains “bridge”
Engineering $377,005 · in Roads and bridges · name contains “engineering” (2026, all county funds, as adopted (before state review) only)
66Sebastian County, AR130,035$10.6 million$81.80/res.County Road $10.4 million · in Road Fund · name contains “road”
Add'l Motor Fuel Tax (Act 416) $241,600 · in Add'l Motor Fuel Tax (Act 416) · name contains “motor fuel” (2026)
67Madison County, IN134,222$10.5 million$78.00/res.Highway $5.8 million · in Roads and bridges · name contains “highway”
Cumulative Bridge $3.6 million · in Roads and bridges · name contains “bridge”
Local Road & Street $1.1 million · in Roads and bridges · name contains “road” (2026, all county funds, as adopted (before state review) only)
68La Crosse County, WI121,060$10.3 million$85.02/res.Highway Maintenance and Administration $9.5 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $57,535 · in Transportation · the state’s standard line “Highway Construction”
Other Transportation $747,923 · in Transportation · the state’s standard line “Other Transportation” (2024, actual spending, governmental funds, including transfers only)
69Walton County, GA109,792$10.3 million$93.66/res.Public Works Administration $521,626 · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $9.8 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
70Douglas County, KS121,989$10.2 million$84.01/res.Road & Bridge $10.2 million · in Roads and bridges · name contains “road” (2026, all budgeted funds, spending authority only)
71Hardin County, KY112,826$10.1 million$89.74/res.Road Fund $9.6 million · in Roads · the state’s standard line “Road Fund”
Local Government Economic Assistance Fund $485,622 · in Roads · the state’s standard line “Local Government Economic Assistance Fund” (2023, all budgeted funds, final (amended) budget only)
72Washington County, TN139,642$9.3 million$66.88/res.Administration $993,599 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $3.5 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $865,056 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Asphalt Plant Operations $3.1 million · in Highways · the state’s standard line “Asphalt Plant Operations”
Traffic Control $102,850 · in Highways · the state’s standard line “Traffic Control”
Capital Outlay $864,990 · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
73Story County, IA102,498$9.2 million$89.76/res.Roads & Transportation $9.2 million · in Roads & Transportation · the state’s standard line “Roads & Transportation” (2027)
74Schuylkill County, PA144,523$9.0 million$62.15/res.Highways and Streets $9.0 million · in Transportation · the state’s standard line “Highways and Streets” (2024, actual spending, governmental funds, not transfers only)
75Albemarle County, VA117,313$8.9 million$76.25/res.Maintenance of Highways, Streets, Bridges, and Sidewalks $8.9 million · in Public Works · the state’s standard line “Maintenance of Highways, Streets, Bridges, and Sidewalks” (2025, actual spending, day-to-day operations, including the school division only)
76Black Hawk County, IA132,348$8.9 million$67.25/res.Roads & Transportation $8.9 million · in Roads & Transportation · the state’s standard line “Roads & Transportation” (2027)
77Ontario County, NY113,012$8.8 million$77.80/res.Public Works Administration $228,179 · in General Government · name contains “public works”
Maintenance of Roads $3.9 million · in Transportation · name contains “roads”
Snow Removal $1.7 million · in Transportation · the state’s standard line “Snow Removal”
Machinery $1.3 million · in Transportation · the state’s standard line “Machinery”
Engineering $885,074 · in Transportation · name contains “engineering”
Highway and Street Administration $810,076 · in Transportation · name contains “highway” (2024, actual spending)
78Delaware County, IN112,951$8.8 million$77.84/res.Highway $4.8 million · in Roads and bridges · name contains “highway”
Cumulative Bridge $2.9 million · in Roads and bridges · name contains “bridge”
Local Road & Street $1.1 million · in Roads and bridges · name contains “road” (2026, all county funds, as adopted (before state review) only)
79Clark County, IN127,479$8.6 million$67.41/res.Highway $4.6 million · in Roads and bridges · name contains “highway”
Cumulative Bridge $3.4 million · in Roads and bridges · name contains “bridge”
Local Road & Street $625,000 · in Roads and bridges · name contains “road” (2026, all county funds, as adopted (before state review) only)
80Tazewell County, IL129,821$7.6 million$58.63/res.Streets and Highways $7.6 million · in Transportation and Public Works · the state’s standard line “Streets and Highways” (2025, actual spending, governmental funds and county-run businesses only)
81Bradley County, TN113,782$7.1 million$62.57/res.Public Transportation $42,000 · in Other Operations · name contains “transportation”
Administration $627,500 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $2.9 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $730,110 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Traffic Control $171,527 · in Highways · the state’s standard line “Traffic Control”
Other Charges $274,242 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $2.4 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
82Kendall County, IL143,171$7.1 million$49.59/res.Streets and Highways $7.1 million · in Transportation and Public Works · the state’s standard line “Streets and Highways” (2025, actual spending, governmental funds and county-run businesses only)
83Daviess County, KY104,457$7.1 million$67.83/res.Road Fund $6.8 million · in Roads · the state’s standard line “Road Fund”
Local Government Economic Assistance Fund $271,500 · in Roads · the state’s standard line “Local Government Economic Assistance Fund” (2025, all budgeted funds, final (amended) budget only)
84Franklin County, WA101,238$6.9 million$68.17/res.Engineering $43,405 · in Transportation · the state’s standard line “Engineering”
Roadway $2.5 million · in Transportation · the state’s standard line “Roadway”
Drainage $291,334 · in Transportation · the state’s standard line “Drainage”
Structures $141,449 · in Transportation · the state’s standard line “Structures”
Street Lighting $14,741 · in Transportation · the state’s standard line “Street Lighting”
Traffic Control Devices $391,092 · in Transportation · the state’s standard line “Traffic Control Devices”
Snow and Ice Control $135,357 · in Transportation · the state’s standard line “Snow and Ice Control”
Street Cleaning $177,671 · in Transportation · the state’s standard line “Street Cleaning”
Roadside $729,257 · in Transportation · the state’s standard line “Roadside”
Maintenance Administration and Overhead $603,242 · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
Management $477,027 · in Transportation · the state’s standard line “Management”
General Services $714,513 · in Transportation · the state’s standard line “General Services”
Facilities $120,157 · in Transportation · the state’s standard line “Facilities”
Engineering $265,096 · in Transportation · the state’s standard line “Engineering”
Planning $151,790 · in Transportation · the state’s standard line “Planning”
Operations Administration and Overhead $110,611 · in Transportation · the state’s standard line “Operations Administration and Overhead” (2025, actual spending)
85Tompkins County, NY105,602$5.8 million$55.21/res.Maintenance of Roads $2.7 million · in Transportation · name contains “roads”
Snow Removal $945,023 · in Transportation · the state’s standard line “Snow Removal”
Machinery $1.5 million · in Transportation · the state’s standard line “Machinery”
Transportation, Other $302,337 · in Transportation · name contains “transportation”
Highway and Street Administration $234,849 · in Transportation · name contains “highway”
Maintenance of Bridges $82,894 · in Transportation · name contains “bridges” (2024, actual spending)
86Rock Island County, IL142,731$4.9 million$34.34/res.Streets and Highways $4.9 million · in Transportation and Public Works · the state’s standard line “Streets and Highways” (2025, actual spending, governmental funds and county-run businesses only)
87Mercer County, PA108,140$4.1 million$38.37/res.Highways and Streets $4.1 million · in Transportation · the state’s standard line “Highways and Streets” (2024, actual spending, governmental funds, not transfers only)
88Macon County, IL100,737$4.0 million$39.42/res.Streets and Highways $4.0 million · in Transportation and Public Works · the state’s standard line “Streets and Highways” (2025, actual spending, governmental funds and county-run businesses only)
89Madison County, KY99,582$3.9 million$38.76/res.Road Fund $3.8 million · in Roads · the state’s standard line “Road Fund”
Local Government Economic Assistance Fund $100,000 · in Roads · the state’s standard line “Local Government Economic Assistance Fund” (2024, all budgeted funds, final (amended) budget only)
90Warren County, KY147,936$3.5 million$23.98/res.Road Fund $3.5 million · in Roads · the state’s standard line “Road Fund”
Road Fund $7,500 · in Road Facilities · the state’s standard line “Road Fund”
Local Government Economic Assistance Fund $20,000 · in Roads · the state’s standard line “Local Government Economic Assistance Fund” (2022, all budgeted funds, final (amended) budget only)
91Cambria County, PA130,108$2.2 million$17.11/res.Highways and Streets $2.2 million · in Transportation · the state’s standard line “Highways and Streets” (2024, actual spending, governmental funds, not transfers only)
92Henderson County, NC120,771$2.0 million$16.85/res.All other transportation $2.0 million · in Other · the state’s standard line “All other transportation” (2025, actual spending)
93Lebanon County, PA145,319$761,714$5.24/res.Highways and Streets $761,714 · in Transportation · the state’s standard line “Highways and Streets” (2023, actual spending, governmental funds, not transfers only)
94Blair County, PA120,269$547,851$4.56/res.Highways and Streets $547,851 · in Transportation · the state’s standard line “Highways and Streets” (2024, actual spending, governmental funds, not transfers only)
95Adams County, PA107,914$507,762$4.71/res.Highways and Streets $507,762 · in Transportation · the state’s standard line “Highways and Streets” (2024, actual spending, governmental funds, not transfers only)
96Frederick County, VA98,109$51,271$0.52/res.Maintenance of Highways, Streets, Bridges, and Sidewalks $51,271 · in Public Works · the state’s standard line “Maintenance of Highways, Streets, Bridges, and Sidewalks” (2025, actual spending, day-to-day operations, including the school division only)
97Kankakee County, IL106,410$0$0.00/res.no line matched in this budget (2025, actual spending, governmental funds and county-run businesses only)
98Cleveland County, NC102,194$0$0.00/res.no line matched in this budget (2025, actual spending)
99Craven County, NC104,167$0$0.00/res.no line matched in this budget (2025, actual spending)
100Harnett County, NC146,096$0$0.00/res.no line matched in this budget (2025, actual spending)
101Lincoln County, NC97,611$0$0.00/res.no line matched in this budget (2025, actual spending)
102Moore County, NC108,417$0$0.00/res.no line matched in this budget (2025, actual spending)
103Nash County, NC97,990$0$0.00/res.no line matched in this budget (2025, actual spending)
104Randolph County, NC148,389$0$0.00/res.no line matched in this budget (2025, actual spending)
105Robeson County, NC118,624$0$0.00/res.no line matched in this budget (2025, actual spending)
106Wayne County, NC120,338$0$0.00/res.no line matched in this budget (2025, actual spending)
107Fayette County, PA123,941$0$0.00/res.no line matched in this budget (2024, actual spending, governmental funds, not transfers only)
108Lycoming County, PA113,236$0$0.00/res.no line matched in this budget (2024, actual spending, governmental funds, not transfers only)
109Montgomery County, VA98,998$0$0.00/res.no line matched in this budget (2025, actual spending, day-to-day operations, including the school division only)
110Roanoke County, VA97,334$0$0.00/res.no line matched in this budget (2025, actual spending, day-to-day operations, including the school division only)

Dead ends — 71 counties in this group with no figure yet (their own budgets haven’t been read): Calhoun, AL, Etowah, AL, Houston, AL, Lauderdale, AL, Limestone, AL, Marshall, AL, Morgan, AL, St. Clair, AL, Matanuska-Susitna Borough, AK, Cochise, AZ, Coconino, AZ, Navajo, AZ, Northeastern Connecticut Planning Region, CT, Northwest Hills Planning Region, CT, Boone, KY, Ascension Parish, LA, Bossier Parish, LA, Rapides Parish, LA, Tangipahoa Parish, LA, Terrebonne Parish, LA, Androscoggin, ME, Kennebec, ME, Berkshire, MA, Jackson, MS, Madison, MS, Cass, MO, Franklin, MO, Jasper, MO, Platte, MO, Flathead, MT, Gallatin, MT, Missoula, MT, Strafford, NH, Hunterdon, NJ, Sussex, NJ, Warren, NJ, San Juan, NM, Burleigh, ND, Allen, OH, Ashtabula, OH, Clark, OH, Columbiana, OH, Miami, OH, Richland, OH, Wayne, OH, Wood, OH, Comanche, OK, Rogers, OK, Benton, OR, Douglas, OR, Linn, OR, Yamhill, OR, Washington, RI, Florence, SC, Lancaster, SC, Pickens, SC, Sumter, SC, Pennington, SD, Grayson, TX, Gregg, TX, Hunt, TX, Liberty, TX, Potter, TX, Randall, TX, Rockwall, TX, Taylor, TX, Tom Green, TX, Wichita, TX, Cache, UT, Berkeley, WV, Monongalia, WV.

Who’s in the group: Counties anywhere in the U.S. within 25% of its population (2024 Census estimate), either way. If fewer than five fit, the eight closest in population. Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.